Wildlife passages – How to evaluate their effectiveness?

Slides:



Advertisements
Similar presentations
Accra, Ghana October 19-23, Extending Health Insurance: How to Make It Work DESIGN ELEMENT 8: MONITORING AND EVALUATION OF HEALTH INSURANCE SCHEMES.
Advertisements

Identifying, Monitoring, and Assessing Promising Innovation: Using Evaluation to Support Rapid Cycle Change July Presentation at a Meeting sponsored.
DRAFT Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop July 23, 2007.
Maryland Department of the Environment Restoration and Regulation Discussion Presented by: Wetlands and Waterways Program Maryland Department of the Environment.
Its just a buzzword from above: Climate Change Challenge and Local Government Indifference in the Philippines Michael P. Canares HNU Center for Research.
Chapter 12 Analysing quantitative data
EHEMU PROGRAMME FOR 2007 Herman Van Oyen and Aurore Clavel.
Combining limit values for the impact of infrastructure on humans and wildlife J. O. Helldin Swedish Biodiversity Centre/SLU Lennart Folkesson (VTI, SE),
WORLD ECOTOURISM CONFERENCE 2010 Noor Jalilah Binti Jumaat
© ISIS How do we talk to zoo keepers? How do we talk to zoo keepers? Michele Peters University of St. Thomas.
Literature review Cindy Wee Te Puna Ako Learning centre.
Program Evaluation. Lecture Overview  Program evaluation and program development  Logic of program evaluation (Program theory)  Four-Step Model  Comprehensive.
Translating the loss and damage agenda for national policymaking Erin Roberts International Centre for Climate Change and Development September 30 th,
Introduction to Restoration Ecology What is ecological restoration?
New England Cottontail Conservation Efforts Anthony Tur US Fish and Wildlife Service New England Field Office Concord, New Hampshire.
An Introduction to Monitoring and Evaluation for National TB Programs.
April 21, Clean up soils, seed banks 2. Example budgets and practical constraints 3. Evaluating restoration success ***Meet directly at White Hall.
Problem Identification
Higher Physical Education
South March Highlands Blanding’s Turtle Conservation Needs Assessment March 18, 2013.
Information Technology Audit
Intro to Computing Research
Click to add title Household energy efficiency programme evaluation: does it tell us what we need to know? Dr Joanne Wade CXC
Access to health care, social protection, and household costs of illness proposal Cost of illness working group INDEPTH AGM 2009, Pune.
Public Health Systems Research: What We Know and Need to Learn Glen P. Mays, PhD, MPH Department of Health Policy & Management UAMS College of Public Health.
Skunk Works Evaluation Tools: How do we know if we are having an impact?
ECLAC Disaster Assessment ECLAC Disaster Assessment Training Manual Section V (ii) Coastal Engineering: Reconstruction – Management and Mitigation.
Lecture 14 Sections 7.1 – 7.2 Objectives:
Traditional Planning It’s largely deterministic It’s largely deterministic Process relies on a single most likely alternative future forecast Process.
Gap Analysis of Ongoing Youth Employment Efforts.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Provenance Issues In a changing world. Martin Driver Australian Network for Plant Conservation.
L643: Evaluation of Information Systems Week 11: March 17, 2008.
Screen 1 of 26 Markets Assessment and Analysis Markets and Food Security LEARNING OBJECTIVES Identify the components of a typical market assessment for.
Evidence in Planning Presented at the Data Leading to Action-From Chaos to Clarity Symposium Winnipeg, January 19-20, 2009 Dexter Harvey.
Florida Fish and Wildlife Conservation Commission
WILDLIFE RADIOTELEMETRY AND REMOTE MONITORING Joshua J. Millspaugh, Dylan C. Kesler, Roland W. Kays, Robert A. Gitzen, John H. Schulz, Christopher T. Rota,
Evaluating Fish Response to Habitat Restoration Overview of Intensively Monitored Watershed Research in the PNW Rationale for IMW approach Extent of current.
Wildlife Program Amendments CBFWA Members Meeting – Sept
Quantitative Assessment of Cumulative Impacts: Challenges and Progress Lauren Zeise Cal/EPA Office of Environmental Health Hazard Assessment CAPCOA Workshop:
HEALTHY DOSE: BOOSTING THE IMPACT OF COMMUNITY HEALTH STRATEGIES Center for Community Health and Evaluation
 Welcome, introductions  Conceptualizing the evaluation problem  stakeholder interests  Divergent and convergent processes  Developing evaluation.
Howard Schaller PSMFC Annual Meeting September 24, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
CSS Oversight Committee ISAB November 15, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
January 27, 2011 Examples of Recovery Evaluation Objectives in the Western U.S. Delta Stewardship Council Presentation by the Independent Consultant.
Measures of Successful Wetland Restoration: An Examination of Policies and Ecologies in Northern Michigan Andrew T. Kozich Michigan Technological University.
Evidence-based Policymaking Dr. Shahram Yazdani Shahid Beheshti University of Medical Sciences School of Medical Education Strategic Policy Sessions: 20.
Identifying Species Targets at the Landscape/ Seascape Scale.
Choosing Evidence-Based Approaches (Programs, Policies, Practices) A Comprehensive Framework.
Framing the Research Question By B. Nelson. The question  Usually a research question starts with a query eg. Something you have seen during your work.
Management Strategy Evaluation (MSE) Bob O’Boyle & Tana Worcester Bedford Institute of Oceanography Dartmouth, Nova Scotia, Canada.
Aims Of The REPS establish farming practices and production methods which reflect the increasing concern for conservation, landscape protection and wider.
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
Setting Your Goals For TTESS Memorial HS Training September 11, 2015.
Mountain Risks: A Marie Curie Research & Training Network J. Corominas and the ‘Mountain-Risks’ research team Department of Geotechnical Engineering.
IMPACT EVALUATION PBAF 526 Class 5, October 31, 2011.
Conference talk was presented at: Urban Wildlife Ecology and Management: An International Symposium on Urban Wildlife and the Environment University of.
Fabrice Ottburg & Edgar van der Grift
by Trina Rytwinski Carleton University, Ottawa, Ontario
The Monkton Amphibian Underpasses
Module 9 MITIGATION.
What is Research? A research study is a study conducted to collect and analyse information in order to increase our understanding of a topic or an issue.
Citizen Science in the policy arena
Wildlife Program Amendments CBFWA Members Meeting – Sept
Developing metacognition – what does the evidence suggests?
Global burden of hypertension in the adult population
MONITORING AND EVALUATION IN TB/HIV PROGRAMS
IBI’s: How It’s Done.
Action research project to examine how parents and school can work together to improve the eating and feeding behaviour of a child with autism spectrum.
Analysis of the notification of compensatory measures
Presentation transcript:

Wildlife passages – How to evaluate their effectiveness? Edgar van der Grift Edgar.vandergrift@wur.nl

Worldwide many wildlife passages in all forms/sizes, but…. Dassentunnel

…do they work? 7

Much baseline information about passage performance available!

Many studies about passage use… Knowledge gab 1 Many studies about passage use… But little knowledge about passage effectiveness! 7

Some studies address effectiveness… Knowledge gab 2 Some studies address effectiveness… But in most of them the effectiveness of wildlife passages on population persistence remains unclear! 7

Studying use is not useless! Wildlife passage use Studying use is not useless! However: Use ≠ Effectiveness Use does not provide evidence for effects of wildlife passages on population persistence ! 7

Use ≠ Effectiveness 3 x 1 badger? Research: 3 crossings of badger per time period T But: what does it mean? 1 x 3 badgers? 7

Use ≠ Effectiveness 1 x 3 badgers After road construction: Before road construction: 3 x 3 badgers Usually no monitoring “before” ! 7

Wildlife passage effectiveness Definition: The extent to which the objectives (= desired effect) for a wildlife passage are reached no objective = no effectiveness (And: no problem = no objective) 7

Setting “SMART” objectives Objective for each project must be specific to the location, species of concern and nature of the problem S = Specific What are we going to do? M = Measurable How much? A = Acceptable Is there enough support? R = Realistic Is it possible what we want to do? T = Time frame When are we finished? 7

Does it meet our objectives? 7

Working out a monitoring approach What are suitable research species? What are suitable research sites? What is the best study design (options)? Which research methods (surveys/analyses) are most promising? What measurement schemes should be used? What are the estimated costs? 7

Choose appropriate research species Species is (highly) vulnerable for road impacts Proven use of wildlife passages Road impact is measurable Species allows for study design with high inferential strength 7

Choose appropriate research sites Species X: not viable viable highly viable Select locations where wildlife passages are expected to make a large difference (e.g. by modeling population viability) with infra without infra

Choose appropriate study design: (B)BACI, BA or CI (Roedenbeck et al., 2007) Before road Before After construction mitigation mitigation Impact Control 1 Control 2 7

Study design in literature review (n=123 studies): Before-After (BA) comparison approach: n=15 Use of controls in <10 studies Most studies retrospective: only survey of crossing structures after construction In practice: trade-offs between perfect study design and reality! “Before” situation already in the past No controls, no replication Randomisation not feasible Limited budget ….

Do not only include the wildlife passage in your study design! <50% studies in literature review incorporated assessment of presence/abundance target species around wildlife crossing Not measuring the population adjacent to road may result in wrong conclusions about wildlife passage performance Example: Reduction in roadkill does not necessarily mean the crossing structure is effective

Importance of population surveys BEFORE AFTER Effect Example 1: Roadkill 10 5 50% ↓ Population size 100 20 15% ↑ Example 2: Roadkill 10 10 0% Population size 100 200 50% ↓

Relate to abundance of animals in adjacent habitat

Select appropriate research methods

7

Monitoring! Photo: Bart Siebelink Photo: Bart Siebelink 7

Review: Tracking pads (n=74) Video / infra-red still cameras (n=36) Collection/identification scats (n=16) Direct observations (n=13) Trapping (n=12) Collection/identification hair (n=8) Radio-tracking (n=7) Trail monitors/wildlife counters (n=6) Other (including dusting with fluorescent pigment) 7

Select appropriate research methods Go (sometimes) off the beaten track! Large species over-represented in existing studies, partly because of chosen research methods New techniques in development: e.g. genetics, PIT tags 7

Wildlife overpass “Groene Woud”

Dry zone Wetland zone

Distribution amphibians across overpass Common toad Common frog Smooth newt Crested newt Green frog Number of observations 2006-2007 adults/juveniles (n=968) Wildlife overpass

Significant more amphibians in wetland zone Number of observations

Efficiency method “artificial refugia” Number of observations

Crested newts: Belly patterns Identification of individuals and individual movements across the overpass

Crested newts: Belly patterns Identification of individuals and individual movements across the overpass

Appropriate measurement scheme Appropriate monitoring period (review: 4 nights – 8 yrs) Appropriate frequency of measurements within period (review: 1/day – 1/week) Appropriate number of impact and control sites Recommendation: Assessment of measurement scheme on the basis of dynamic population model simulations of monitoring 7

Appropriate measurement scheme Monitoring changes in populations 1 study site 10 study sites 100% 80% 60% 40% 20% 100% 80% 60% 40% 20% Survey: 26 years Survey: 12 years 7

Maximize inferential strength (validity) = high probability and low uncertainty that research result is true Dependent on: Number of competing hypotheses tested Extent of extrapolation Study design Measurement scheme 7

Implications Without studies with high IS it will be difficult to prove the effectiveness of defragmentation programs and to justify investments Correlation between increasing IS and increasing costs However: investment in a few good but costly experiments should be prefered above numerous poor experiments at low costs Experiments with high IS carried out over the relevant temporal and spatial time scales may not be feasible in isolated studies, but may be conducted in collaborative (international) networks of researchers 7

Complex problem: time for collaboration...! This badger gate is for 94.68% effective! 7

Questions and discussion Use ≠ Effectiveness Questions and discussion 7