Jefferson Lab Status Bob McKeown May 6, 2016.

Slides:



Advertisements
Similar presentations
Update from NSAC NuPECC Long Range Planning Meeting Susan J. Seestrom NSAC Chair U.S. Department of Energy Office of Science.
Advertisements

NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
Output from this Series of Workshops: A science vision for the RHIC future 1.Provide a science case for the future RHIC program that makes clear its importance.
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June JLAB Users Group Meeting.
1 Auteuil, Paris March 2011 Jefferson Lab The 12 GeV Era Hugh Montgomery.
Charge for the MEIC Ion Complex Design Mini-Workshop Andrew Hutton Jan. 27 & 28, 2011.
Thomas Jefferson National Accelerator Facility R.. McKeown Page 1 View from Lab Management R. McKeown DNP12 Satellite Meeting October 25, 2012.
Bob McKeown Presentation to SoLID Collaboration March 22, 2013 Jefferson Lab Update.
12 GeV Science Program R. D. McKeown JSA Science Council January 7, 2011 Thanks to A. Lung, L. Cardman, others.
Generic Detector R&D for an Electron Ion Collider RHIC & AGS Annual Users Meeting T. Ludlam, June 2011.
UK Hadron Physics D. G. Ireland 10 October 2014 NuPECC Meeting, Edinburgh.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
J EFFERSON L AB – A N I NTRODUCTION Hugh Montgomery; May 14, 2012.
POETIC 2012 Indiana University R. D. McKeown 12 GeV CEBAF.
Jefferson Lab Nuclear Science Program QCD Evolution May 26, 2015 R. D. McKeown.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
Hall A Collaboration, June 10, 2010, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator.
Jefferson Lab Status APEX Meeting April 22, 2014 R. D. McKeown Deputy Director For Science.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Thomas Jefferson National Accelerator Facility R. D. McKeown Slide 1 R. D. McKeown Jefferson Lab College of William and Mary The 12 GeV Science Program.
1 EIC Update R. D. McKeown Presentation to EICAC April 10, 2011 (Thanks to R. Ent, A. Hutton, H. Montgomery, M. Farkhondeh, others)
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
A feasibility study for measurements using electroweak probes at the proposed Electron-Ion Collider: Investigating nucleon structure and the fundamental.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Jefferson Lab Overview Bob McKeown April 20, 2015.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
Lab Update Rolf Ent January 21, January 2016 Page 2 Outline Near term schedule (note: will not include Hall C/12 GeV status as you will hear more.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Anthony.
PAC37 Charge 1 1.) Review new proposals, previously conditionally approved proposals, and letters of intent † † for experiments that will utilize the 12.
Jefferson Lab Science Program R. D. McKeown Jefferson Lab Users Meeting June 3, 2014.
Timelike Compton Scattering at JLab
Itzhak Tserruya Weizmann Institute of Science
EIC NAS review Charge-2 What are the capabilities of other facilities, existing and planned, domestic and abroad, to address the science opportunities.
GlueX Collaboration Meeting
Jefferson Lab Overview
Welcome Stuart Henderson May 22, 2017.
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
Future Trends in Nuclear Physics Computing Workshop
Jefferson Lab Reliability Task Force and Initiatives
Report to UGBOD Bob McKeown January 14, 2016.
PAC38 Charge 1.) Review new proposals, previously conditionally approved proposals, and letters of intent† for experiments that will utilize the 12 GeV.
Scientific Computing At Jefferson Lab
Introduction to Jefferson Lab
Operations Department
Jefferson Lab Status Bob McKeown October 21, 2015.
Jefferson Lab Hugh Montgomery Jefferson Lab UGBOD January 2015.
Operations Department
View from Lab Management HPS Collaboration Meeting
Introduction and Workshop Charge
Schedule Rolf Ent HPS Meeting, May 22, 2018.
Workshops Overview/Goals
MEIC Cost Estimate Overview
FY2018 LABORATORY CALENDAR
SOLID Collaboration Meeting
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
JLEIC Main Parameters with Strong Electron Cooling
FY18-19 EIC R&D FOA FY 2018 Research and Development for Next Generation Nuclear Physics Accelerator Facilities Web site:
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Perspectives from DOE NP
Presentation transcript:

Jefferson Lab Status Bob McKeown May 6, 2016

Outline Upgrade status PAC Budgets JLEIC Outlook

12 GeV Upgrade Project Project Scope (~97% complete): TPC = $338M ETC = ~$10M Project Scope (~97% complete): Doubling the accelerator beam energy – DONE New experimental Hall D and beam line – DONE Civil construction including utilities – DONE Upgrades to Experimental Halls B & C – ~94% Halls B & C Detectors – DONE AL updated 01Apr w/Feb 28th data.

D: 1st production polarized photons CEBAF 2015 Highlights A & D beam separated on 5th pass at 9.6 GeV Spring 2015: 1.9 GeV/pass set-up to support simultaneous Hall A/D ops Power event damaged cold compressor bearings Reconfigured CEBAF for one CHL operation; 1.1 GeV/pass Successful runs: Hall B (HPS) and Hall D (GlueX) D: 1st production polarized photons Summer 2015: He processing SRF cavities complete Repair CHL1  SC1 cryo system w/SNS cold compressor Fall 2015: 5 week run establishes CEBAF at design energy Measured emittance meets initial year physics specs 12 GeV to Hall D and 11 GeV to Hall A

Spring/Summer 2016 Plan: 10 week run – Deliver up to 11 GeV to Hall A and – 12 GeV to Hall D for physics, – 2.2 GeV to Hall B on (some) weekends • Central Cryoplant issues – ~3 weeks lost • Machine Recovery not satisfactory (~2 weeks lost) – Reset Machine, – Run extended to April 25, but significant short fall compared to ambitions – Performed well during last weeks • Potential low energy operations in Hall B for Prad experiment • Test Run of Low Energy Recirculator Facility – Machine restored with support from Commonwealth funding – First operations for Nuclear Physics (Darklight) experiment

CEBAF Three-Year Schedule Hall A Hall D Accelerator Hall B Hall C Activity Beam Fiscal Year 2016 2017 2018 Calendar Year CLAS12 Construction/Installation Physics SHMS Construction/Installation CEBAF Three-Year Schedule Feb 2016 Non-CLAS12 Ops* SBS Construction Comm. Opportunistic * Potential PRad Summer 2016 run Beam for Commissioning Beam for Physics Non-CLAS12 Ops

12 GeV Approved Experiments by Physics Topics Hall A Hall B Hall C Hall D Other Total The Hadron spectra as probes of QCD   (GlueX and heavy baryon and meson spectroscopy)   1 3 4 The transverse structure of the hadrons (Elastic and transition Form Factors) 5 2 11 The longitudinal structure of the hadrons   (Unpolarized and polarized parton distribution functions) 6 The 3D structure of the hadrons   (Generalized Parton Distributions and Transverse Momentum Distributions) 9 7 21 Hadrons and cold nuclear matter   (Medium modification of the nucleons, quark hadronization, N-N correlations, hypernuclear spectroscopy, few-body experiments) 17 Low-energy tests of the Standard Model and Fundamental Symmetries  1 TOTAL 20 22 71

12 GeV Approved Experiments by PAC Days Topic Hall A Hall B Hall C Hall D Other Total The Hadron spectra as probes of QCD   (GlueX and heavy baryon and meson spectroscopy)   119 540 659 The transverse structure of the hadrons (Elastic and transition Form Factors) 145.5 85 102  25 357.5 The longitudinal structure of the hadrons   (Unpolarized and polarized parton distribution functions) 65 230 165 460 The 3D structure of the hadrons   (Generalized Parton Distributions and Transverse Momentum Distributions) 409 872 212 1493 Hadrons and cold nuclear matter   (Medium modification of the nucleons, quark hadronization, N-N correlations, hypernuclear spectroscopy, few-body experiments) 180 175 201 14 570 Low-energy tests of the Standard Model and Fundamental Symmetries 547  205 79 60 891 TOTAL 1346.5 1686 680 644 74 4430.5 Total Approved Run Group Days (includes MIE) 826 637 424 3307.5 A Decade of Experiments

Program Advisory Committee Charge Review new proposals, previously conditionally approved proposals, and letters of intent for experiments that will utilize the 12 GeV upgrade of CEBAF and provide advice on their scientific merit, technical feasibility and resource requirements.   Identify proposals that represent high quality physics within the range of scientific importance represented by the previously approved 12 GeV proposals and recommend for approval. Also provide a recommendation on scientific rating and beam time allocation for proposals newly recommended for approval. Identify other proposals with physics that have the potential for falling into this category pending clarification of scientific and/or technical issues and recommend for conditional approval. Provide comments on technical and scientific issues that should be addressed by the proponents prior to review at a future PAC. PAC44 – July 25, 2016 Proposals due June 6

Jeopardy Previous policy (6 GeV era): The laboratory has a three-year Jeopardy Rule that was devised both to reduce the beamtime backlog and to ensure that the ratings of all approved experiments continue to accurately reflect their scientific priority. Jeopardy begins three years after a proposal is approved. Previously approved experiments that have not yet been run or scheduled must return to the PAC for a review of their status. Will begin the process of “Jeopardy” in the next few years Have requested input from JLab Users on the process Proposal for discussion at June user meeting

Future Projects MOLLER experiment (Possible MIE – FY17-20) – Standard Model Test – DOE science review (September 2014) – strong endorsement – Technical, cost & schedule reviews? – Now hope for FY18 start SoLID – Chinese collaboration – CLEO Solenoid  – Director’s review (Feb. 2015)  lots of good feedback – Collaboration briefing to DOE-NP (Nov. 2015)

Budget Omnibus FY16: JLab allocation is $1.5M below Pres. budget. – Keep 16 weeks running – Retain staff – Delay some activities, accelerator spares  increased risk FY2017 – Letter from 6 Senators supporting Nuclear Physics at LRP level ($645M) – “Directors” visit Cherry Murray, Head of Office of Science on Jan 16. – Pres. Budget release Feb. 9: NP at $636 – $8M included for End Station Cryo upgrade NP day on the Hill – March 14

(C. Murray – March NSAC presentation)

Note: Senate mark = PB, House mark = PB-$16M $2.5M below our plan based on guidance from last year  23 weeks running (+3 commissioning) (C. Murray – March NSAC) Note: Senate mark = PB, House mark = PB-$16M

JLab Operations Budget During FY01-FY12, CEBAF ops averaged 34.5 weeks/year (best year FY05 at 42 weeks) For 12 GeV era we estimate “optimal” operations at 37 weeks per year FY17 Pres. Budget includes JLab ops at $104M. – Would fund 23 weeks (+ 3 weeks from 12 GeV project) FY18+ at cost of living implies 23 weeks/year running (62% of optimal) We propose FY18+ at 30 weeks/year (81%), will require ~$6M increase in operations budget.

2015 NSAC Long Range Plan NSAC = Nuclear Science Advisory Committee Advise DOE and NSF on future of Nuclear Physics program every 5-7 years Four recommendations Two initiatives Recommend modest budget growth at 4.5% per year

JLEIC: EIC at Jefferson Lab

JLEIC: EIC at Jefferson Lab JLab EIC Figure 8 Concept Initial configuration: 3-10 GeV on 20-100 GeV ep/eA collider Optimized for high ion beam polarization: polarized deuterons Luminosity: up to few x 1034 e-nucleons cm-2 s-1 Low technical risk Upgradable to higher energies 250 GeV protons + 20 GeV electrons Flexible timeframe for Construction consistent w/running 12 GeV CEBAF Thorough cost estimate completed presented to NSAC EIC Review Cost effective operations Fulfills White Paper Requirements Current Activities Site evaluation (VA funds) Accelerator, detector R&D Design optimization Cost reduction Deleted Brightened graphic (no more shame); added current activities from previous version; Mary Beth please format text

EIC Developments EIC User meeting – Berkeley Jan. 6-9 NAS study being planned for this year SLAC will increase involvement in JLEIC – Responsible for e-ring Rik Yoshida joined JLab March 2016 to lead the JLEIC physics/detector effort Next EIC User meeting at ANL July 7-10, 2016 DOE-NP will increase EIC accel. R&D in FY17 – Through ‘tax’ on JLab/BNL – Peer review planned for summer 2016

EIC Timeline Activity Name 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 12 GeV Operations 12 GeV Upgrade FRIB EIC Physics Case NSAC LRP NAS Study CD0 EIC Machine Design and R&D CD1(Down-select) CD2/CD3 EIC Construction CD0 = DOE “Mission Need” statement; CD1 = technology and site selection (VA/NY) CD2/CD3 = establish project baseline cost and schedule

Summary Exciting Times Ahead 12 GeV Upgrade making good progress Commissioning, startup of physics program in progress Tight FY16 budget but will run 16 weeks FY17 Pres. budget is less than we hoped for Concern about ops budget in out years NSAC LRP released Good for JLab Requires modest budget growth Recommends future EIC construction Exciting Times Ahead