ILC Global Design Effort

Slides:



Advertisements
Similar presentations
Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Advertisements

Plan ahead for the GDE Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Technology Breakthroughs and International Linear Collider Barry Barish AAAS Annual Meeting Washington DC 19-Feb-05.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
6-7 April 06 MAC Review Global Design Effort 1 The Global R&D Board Bill Willis GDE Columbia University.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
On the Way to ILC Shekhar Mishra Fermilab Talk presented on behalf of ILC-GDE 2/16/06 Talk Presented at the 2006 Aspen Winter Conference: "Particle Physics.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
22 September 2006 Global Design Effort 1 The Global R&D Board Status Bill Willis GDE Columbia University.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
ILC Global Design Effort Barry Barish GDE 9-March-06.
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
1-2 May 2006 LCFOA Mtg Global Design Effort 1 The Baseline Configuration and the Reference Design Report Tor Raubenheimer SLAC.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC Accelerator Activities in Japan
Oct 22 Group Leaders Planning meeting
Barry Barish LCWS10 - Beijing 26-March-10
Status and Plan of GDE Design Work (Including Road Map for RDR)
Technical Design Report preparation
Barry Barish GDE Caltech
Electron Source Configuration
Nick Walker (DESY) EU GDE Meeting Oxford
Yasuhiro Okada, Executive Director, KEK
Barry Barish LCWS10 - Beijing 26-March-10
Barry Barish JSPS - Sendai 12-Sept-11
ILC Cryogenics -- Technical Design Report Planning
K. Yokoya KEK For RDR Management Board
Barry Barish Paris ICHEP 24-July-10
ILC - Global Design Effort
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

ILC Global Design Effort Barry Barish GDE Caltech 1 May 06 LCFOA - SLAC Global Design Effort

ILC Timeline …. Global Design Effort Project Global Design Effort 2005 2006 2007 2008 2009 2010 Global Design Effort Project Baseline configuration Reference Design …. Technical Design ILC R&D Program Expression of Interest to Host International Mgmt 1 May 06 LCFOA - SLAC Global Design Effort

From Baseline to a RDR 2006 Global Design Effort July Dec Jan Frascati Bangalore Vancouver Valencia Freeze Configuration Organize for RDR Review Design/Cost Methodology Review Initial Design / Cost Redo!!! Review Final Design / Cost RDR Document Design and Costing Preliminary RDR Released 1 May 06 LCFOA - SLAC Global Design Effort

Global Design Effort The Mission of the GDE Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan , siting analysis, as well as detector concepts and scope. Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.) 1 May 06 LCFOA - SLAC Global Design Effort

Baseline Configuration Document Our ‘Deliverable’ by the end of 2005 A structured electronic document Documentation (reports, drawings etc) Technical specs. Parameter tables Revisions and Evolution through Change Control Process http://www.linearcollider.org/wiki/doku.php?id=bcd:bcd_home 1 May 06 LCFOA - SLAC Global Design Effort

Baseline Configuration Document ILC Configuration Main What's New March 28, 2006 - RTML section has been updated (v.Mar.28 2006) March 23, 2006 - Missing figure in the “Number of Tunnels” section under the GDE White Papers has bee restored. March 16, 2006 - Conventional Facilities & Siting Section has been updated (v.Mar. 16 2006) March 3, 2006 - RTML and Parameters Sections have been updated (v.Mar.3 2006) Change Configuration Communication Change Configuration Procedure (v.0.5, Feb. 3, 2006) Archives of public communications regarding BCD Change Control. Change Configuration History 1 May 06 LCFOA - SLAC Global Design Effort

Baseline Configuration Document Latest Official Version of BCD BCD in MSWord files: All-in-one-file Single PDF File (2582kB, Updated Mar.28, 2006) Single MSWord File (5103kB, Updated Mar.28, 2006) By Area Nodes: General Parameters (233kB, Updated Mar. 3, 2006) Electron Source (296kB) Positron Source (316kB) Damping Rings (554kB, Updated Feb.27, 2006) Ring to Main Linac (313kB, Updated Mar.28, 2006) Main Linacs (455kB) Beam Delivery (543kB) TeV Upgrade Scenario (26kB) 1 May 06 LCFOA - SLAC Global Design Effort

Structure of the BCD Global Design Effort Summary-like overview for those who want to understand the choice and the why Technical documentation of the baseline, for engineers and acc. phys. making studies towards RDR 1 May 06 LCFOA - SLAC Global Design Effort

Alternatives Section(s) Note - ACD is part of the BCD 1 May 06 LCFOA - SLAC Global Design Effort

-------------------------- Reference Design Reorganized the GDE toward Design / Cost Effort A global effort to design / cost the ILC is underway Configuration Control; International Costing; Industrialization; Siting -------------------------- A sound design must be established with convincing and affordable costing. Review and guidance for the Global R&D program to demonstrate the ILC, improve over the baseline and reduce costs. 1 May 06 LCFOA - SLAC Global Design Effort

GDE RDR / R&D Organization FALC ICFA FALC Resource Board ILCSC (MAC) GDE Directorate GDE Executive Committee Willis Garbincius GDE R & D Board GDE Change Control Board GDE Design Cost Board Global R&D Program RDR Design Matrix Foster Takasaki Dugan Walker 1 May 06 LCFOA - SLAC Global Design Effort

Elements of the ILC R&D Program R&D in support of the BCD Technical developments, demonstration experiments, industrialization, etc. Proposal-driven R&D in support of alternatives to the baseline Proposals for potential improvements to the baseline, resources required, time scale, etc. Guidance from Change Control Board Develop a prioritized DETECTOR R&D program aimed at technical developments needed to reach combined design performance goals 1 May 06 LCFOA - SLAC Global Design Effort

RDB Board Members and Areas Chris Damerell Eckhard Elsen Terry Garvey Hitoshi Hayano Toshiyasu Higo Tom Himel ______________________ AREAS SC CAVITIES, CRYOGENICS, BEAM DELIVERY, INJECTOR, LINAC PERFORMANCE, INSTRUMENTATION, *****DETECTORS***** Lutz Lilje Hasan Padamsee Marc Ross Andy Wolski Bill Willis (Chair) ____________________ CRYOMODULES, DAMPING RINGS, POWER SOURCE, CONTROLS, HIGH AVAILABILTY, 1 May 06 LCFOA - SLAC Global Design Effort

GDE Role in Coordinating / Prioritizing Large Test Facilities SCRF Test Facilities Use of DESY TTF? Duplication of new facilities? 1 May 06 LCFOA - SLAC Global Design Effort

TESLA Test Facility Linac - DESY laser driven electron gun photon beam diagnostics undulator bunch compressor superconducting accelerator modules pre-accelerator e- beam diagnostics 240 MeV 120 MeV 16 MeV 4 MeV 1 May 06 LCFOA - SLAC Global Design Effort

Fermilab – SCRF Test Facility New Muon Lab (NML) FNPL Photo-Injector ILC cryomodule string test facility planned for the New Muon Lab Upgraded FNPL will provide beam tests of ILC cryomodules (FY08 and 09) 1 May 06 LCFOA - SLAC Global Design Effort

ILC R&D KEK STF 1 May 06 LCFOA - SLAC Global Design Effort

GDE Role in Coordinating / Prioritizing Large Test Facilities SCRF Test Facilities Use of DESY TTF? Duplication of new facilities? Areas Needing Increased Efforts SCRF Fabrication Facilities Develop and demonstrate production with yield and cost 10 KW Klystron development 1 May 06 LCFOA - SLAC Global Design Effort

SRF Cavity Gradient Cavity type Qualified gradient Operational gradient Length* energy MV/m Km GeV initial TESLA 35 31.5 10.6 250 upgrade LL 40 36.0 +9.3 500 Total length of one 500 GeV linac  20km * assuming 75% fill factor 1 May 06 LCFOA - SLAC Global Design Effort

Gradient Global Design Effort Results from KEK-DESY collaboration must reduce spread (need more statistics) single-cell measurements (in nine-cell cavities) 1 May 06 LCFOA - SLAC Global Design Effort

Superconducting RF Cavities Chemical Polish Electro Polish 1 May 06 LCFOA - SLAC Global Design Effort

Baseline Gradient 1 May 06 LCFOA - SLAC Global Design Effort

Large Grain Single Crystal Nb Material 1 May 06 LCFOA - SLAC Global Design Effort

RF Power: Baseline Klystrons Specification: 10MW MBK 1.5ms pulse 65% efficiency Thales CPI Toshiba 1 May 06 LCFOA - SLAC Global Design Effort

ILC Cryomodule Increase diameter beyond X-FEL Review 2-phase pipe size and effect of slope 1 May 06 LCFOA - SLAC Global Design Effort

GDE Role in Coordinating / Prioritizing Large Test Facilities SCRF Test Facilities Use of DESY TTF? Duplication of new facilities? Missing Areas SCRF Fabrication Facilities Develop and demonstrate production with yield and cost 10 KW Klystron development Large Scale System Tests / Demonstration What is needed before construction can begin 1 May 06 LCFOA - SLAC Global Design Effort

ILC R&D KEK ATF  ATF2 1 May 06 LCFOA - SLAC Global Design Effort

Plan is to build one RF unit to be tested with Beam by 2009. ILC RF unit at Fermilab 08 09 07 Plan is to build one RF unit to be tested with Beam by 2009. 06 07-08 1 May 06 LCFOA - SLAC Global Design Effort

GDE Role in Coordinating / Prioritizing Large Test Facilities SCRF Test Facilities Use of DESY TTF? Duplication of new facilities? Missing Areas SCRF Fabrication Facilities Develop and demonstrate production with yield and cost 10 KW Klystron development Large Scale System Tests / Demonstration What is needed before construction can begin Preparing for Contruction Project Design, Costing and Industrialization 1 May 06 LCFOA - SLAC Global Design Effort

GDE RDR / R&D Organization FALC ICFA FALC Resource Board ILCSC (MAC) GDE Directorate GDE Executive Committee Willis Garbincius GDE R & D Board GDE Change Control Board GDE Design Cost Board Global R&D Program RDR Design Matrix Foster Takasaki Dugan Walker 1 May 06 LCFOA - SLAC Global Design Effort

Cost Roll-ups Technical Systems Global Systems Area Systems e- e+ damping RTML main BDS source source rings linac Area Systems Technical Systems   Vacuum systems Magnet systems Cryomodule Cavity Package RF Power Instrumentation Dumps and Collimators Accelerator Physics Global Systems Commissioning, Operations & Reliability Control System Cryogenics CF&S Installation 1 May 06 LCFOA - SLAC Global Design Effort

ILC Cryomodule Increase diameter beyond X-FEL Review 2-phase pipe size and effect of slope 1 May 06 LCFOA - SLAC Global Design Effort

How to involve industry? Large Scale Project Characterization Large Project Management Precision Engineering International Coordination Costing Industrialization toward Fabrication Civil Construction & Infrastructure Cryogenics Superconducting RF structures, couplers, etc Electronics and Control Systems Large Scale Computing 1 May 06 LCFOA - SLAC Global Design Effort

ILC as a Global Project Strong U.S. endorsements Increased support in FY07 budget request Strong support from EPP2010 ILC is a Global Effort Design will be established internationally Costing and Construction Plan will be international R&D priorities will be set internationally and strong efforts to coordinate internationally Industrialization will be done internationally 1 May 06 LCFOA - SLAC Global Design Effort