Water Department has Six Divisions

Slides:



Advertisements
Similar presentations
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Advertisements

Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
THE STATE OF THE CITY Presented to The League City Chamber of Commerce and Business Association February 13, 2004.
1 Informational Meeting March 5, 2003 Perry Township Administration Building Delmar Addition/Glenn Avenue Sewer Improvement Area.
1 Collection System And Wastewater Treatment Plant Sewer Update
STATUS OF CARLSBORG SEWER PROJECT Carlsborg Community Advisory Council Bob Martin June 6, 2013.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
City of Los Angeles Venice Dual Force Main Project
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Wastewater Fund. Wastewater Revenue $296,
2013 Stormwater Workshop June 13, 2013 Sponsored By Michiana Stormwater Partnership John J. Dillon Director, LTCP Management City of South Bend.
The City of North Bend Sanitary Sewer System
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
1 Stormwater and Wastewater in Halifax Regional Municipality Presentation to Halifax Watershed Advisory Board John Sheppard, P.Eng. Manager of Environmental.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 19, 2009 Public Works Department- Enterprise Funds.
Town of Tecumseh 2012 Capital Works Projects. Road Projects ProjectBudget Road Paving Projects……………………..$850,000 – Asphalting – tar & chip – crack sealing.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Domestic Wastewater GPs. Domestic Waste (DW) Staff Permitting ( ) Dennise Judy – Program Manager Chuck LeGros – Section Supervisor Wilmott.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
Wisler Pierre-Louis, P.E., LEED AP BD+C, CFM, PMP Public Works Director Public Works Department.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Sjolander Road A Harris County Low Impact Development Roadway Project John Blount, P.E., LEED AP Director, Architecture & Engineering Division Harris County.
Public Information Meeting Wastewater Treatment January 26, 2016.
City of Joliet 2016 Proposed Budget November 30, 2015.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Town Branch Wet Weather Storage Public Information Meeting February 19, 2014 Lexington Fayette Urban County Government Division of Water Quality.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Murfreesboro Water and Sewer Department “Broad Banded” Job Class Tier Structures MAG Interview 7/8/14.
SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities.
2015 Annual Financial Report December 31, Total Revenue $13,068,887Total Expenditure $14,006,870 Revenue Budget $14,957,884Expenditure Budget $15,669,564.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Middlebelt Transport and Storage Tunnel (MTST) Project
FY 2017/18 General Budget Workshop
Sewer System Presentation
Environmental Services
Sun City Lift Station Odor Control Improvements
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Large User True-up Analysis
Infrastructure Investment Needs
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
Rehabilitation Program impact on Sewer Management
City of Noblesville Wastewater Utility
Town of Dunn Sanitary District No. 3
Presented by thomas j. Haglund, general manager
Colchester Interceptor System Improvements Project
City of Valdosta Utilities Department.
Metropolitan Tunnel Redundancy Program Update
Hidden Capacity How Proper Maintenance and Cleaning of Sewer Systems Can Have Huge Benefits! Presentation by the Jersey Water Works CSO Committee For the.
Presentation transcript:

Water Department has Six Divisions 2016 Capital Program & 2017 Outlook Water Department has Six Divisions Water Administration Water Utility Field Operations (WUFO) Environmental Management Water Supply and Treatment Water Reclamation Water Engineering / Water Information Management Systems

City of Dayton owns/operates Three Utilities Water Approx. 800 miles of water distribution piping Elevated storage tanks/booster pump stations 2 Water Treatment Plants (Miami & Ottawa) Sanitary Approx. 740 miles of wastewater collection piping Lift Stations & Force Mains 1 Water Reclamation Plant Storm Approx. 700 miles of storm collection piping Lift Stations, Force Mains & Flood Control

In 2013, the Water Department Launched a formal System Re-Investment Program. Program highlights include: Re-Investing $160 million in Repair/Replacement (R/R) Program over 10-year Period (2013 – 2022) $8 Million per year for water distribution system $8 Million per year for wastewater collection system Repair/Replacement (R/R) Program goal is to replace/upgrade 1% of the system per year 8.0 linear miles of water distribution mains 7.4 linear miles of wastewater collection sewers

2016 Summary 27 Construction Contracts Awarded using $36.5 Million in Water Department capital funds $22.15 Million from Water Capital $14.2 Million from Sanitary Capital $0.15 Million from Storm Capital All lining projects from 1998 to 2015 with 80% being lined within the past 5 years.

2017 OUTLOOK Water Distribution System – Continue with Repair/Replacement Program. Open cut excavation, asphalt, DIP installation. Wastewater Collection System – Phase A and B of the Sanitary Interceptor Sewer Improvements, Bid in February 2017 (approx. $22 million) + Liner Projects and MH Rehabilitation Projects.

Sanitary Sewer Interceptor Plan broadway ps Dayton wrf Sanitary Sewer Interceptor Plan

Typical Cross Section of Proposed Sanitary Sewer Interceptor Proposed Interceptor will parallel existing Interceptor. Total project length is 22,000-ft Generally a 5’x8’ concrete box structure Project will be constructed within the GMR corridor Design Plans are 95% complete. Currently within the permitting stage with OEPA and USACE

Many Special Conditions/Detailed Construction Existing Bridges/RR crossings, etc Junction Chambers are a major portion of the project Connect the existing interceptor to the proposed Provide the ability to transfer flow between ex. and pr.

Questions? Aaron S. Zonin, PE Deputy Director Department of Water aaron.zonin@daytonohio.gov