Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

WECC TRD/NERC TADS Webinar
WECC Standards Committee Joint Session
The Western Electricity Coordinating Council Doug Tucker of WECC & Brian Keel of SRP November 16, TRD/TADS Webinar.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Transmission Availability Data System (TADS) TADS Workshops: January 16, 2008 and February 6, UPDATED Workshop Session 2: Forms.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error.
NERC Lessons Learned Summary LLs Published in September 2015.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
Scheduling and Operating Transmission Devices in the Nodal Environment.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Power System Protective Relaying-Part Two
Protection of Power Systems
Texas Nodal Electrical Buses and Outage Scheduling.
Push Button Station and Relay
NERC Published Lessons Learned Summary
Sub Station.
Announcements Please read Chapters 9, 10 and 11 HW 8 quiz today
Circuit Protection Unit 9.
Chapter # 25 Sub-Stations risemark.pbworks.com.
Grounding And Safety Techniques Ms. Tahoora Qureshi, Asst. Professor
Phase Angle Limitations
UFLS Workshop Discussion #3
NERC Published Lessons Learned Summary
ANALYZING AND RECORDING TRANSACTIONS
SCC P2P – Collaboration Made Easy Contract Management training
PRC Implementation Plan and Summary of Devices
WELCOME TO ALL.
GROUND-FAULT GROUND-CHECK MONITOR
What is an Operation and Misoperation
Project WECC-0100 Update Load Modeling Task Force
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Protective Relaying Conference
ELECTRICAL POWER-II Electrical engineering sixth semester
Overcurrent Protection— Fuses and Circuit Breakers
EET 323 – Electrical System Design Lecture 9: Grounding
Workshop Session 1: Overview
Process Description and Control
WECC August 2017 Reliability Workshop James Merlo, PhD
Workshop Session 1: Overview
Safety Meeting Topics Standby Generator Safety
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
WECC August 2017 Reliability Workshop James Merlo, PhD
What is an Operation and Misoperation
Project WECC-0100 Update Load Modeling Task Force
System Review Work Group Update to TSS
Power system operation and control
Topic 1: Cables and conductors
Substation Equipment's
and Forecasting Resources
Presentation transcript:

Workshop Session 2: Forms Transmission Availability Data System (TADS) TADS Workshops: January 16, 2008 and February 6, 2008 - UPDATED Workshop Session 2: Forms

TADS Forms Overview Administrative Forms with Transmission Owner Information 1.1  Non-Reporting Transmission Owner Statement 1.2  Reporting Transmission Owner Information Forms for Ties & Jointly-Owned Facilities 2.1  Tie Lines and Jointly-Owned AC and DC Circuits 2.2  Jointly-Owned AC/DC Back-to-Back Converters Forms for Element Inventory and Summary Outage Data 3.1  AC and DC Circuit Inventory Data 3.2  Transformer Inventory Data 3.3  AC/DC Back-to-Back Converter Inventory Data 3.4  Summary Automatic Outage Data Forms for Detailed Element Automatic Outage Data 4.1  AC Circuit Detailed Automatic Outage Data 4.2  DC Circuit Detailed Automatic Outage Data 4.3  Transformer Detailed Automatic Outage Data 4.4  AC/DC Back-to-Back Converter Detailed Automatic Outage Data Form for Event ID Code Data 5 Event ID Code and Event Type No. Data

Form 1.1 Non-Reporting TO Information

Form 1.1 Non-Reporting TO Information (cont’d) If a non-reporting TO adds TADS facilities during the reporting year, it is required to report on those facilities in that year.

Form 1.2 Reporting TO Information

Form 1.2 Problems Encountered We added pseudo NERC IDs for three TOs for TADS only PSD00001: Southern Company Transmission (in SERC) to be used instead of their five registered NERC IDs NERC ID Company Name NCR01166 Alabama Power Company NCR01247 Georgia Power Company NCR01252 Gulf Power Company NCR01273 Mississippi Power Company NCR01322 Southern Power Company PSD00002: AltaLink Management Ltd. – An unregistered Canadian TO in WECC who will voluntarily report PSD00003: ATCO Electric – An unregistered Canadian TO in WECC who will voluntarily report PSD00004: ITC Midwest LLC – purchased the transmission of Alliant West. They have applied for NERC registration. ITC Midwest LLC is registered with NERC ID NCR10192

Form 1.2 Reporting TO Information (continued) The forms status table accounts for all forms for reporting TOs

Form 2.1 Tie Lines and Jointly-Owned Circuits Form 2.1 is reported at the start of each reporting year and at the end of each reporting year. 2008 will have three submissions of Form 2.1 because of the first quarter reporting requirement The TO that reports outages for joint-owned circuits also reports the entire circuit length in its inventory Each DC pole (plus or minus polarity) is a separate DC Circuit In an AC Circuit, Transformers are not part of the circuit In-line switches located inside an AC Substation are part of the AC Circuit Will expand to allow for 3-terminal circuits

AC Circuit Transformer Exclusion Dashed lines are substation boundaries AC Circuit boundaries are defined by the red “arcs” (A, B, & C) Transformer boundaries are defined by the breaker or disconnect switch

Sectionalizing Switches They are considered “in-line switches,” regardless of location 50 mi. 20 mi. In-line switches are now inside AC Substation C. 50 mi. Zero mi. AC Circuit boundaries (A, B, & C) are the same, but Circuit Miles are different (120 vs. 100).

Form 2.1 Problems Encountered Some TOs that jointly-own a circuit are not on the NERC Compliance Registry Example: A customer owns a 345 kV tap off of a registered TOs circuit, but the customer is not a registered TO. If the customer was registered, this would be a jointly-owned 3-terminal circuit. The registered TO then has reporting responsibility TO registration of customers and IPPs is before the FERC Why report tie lines if they are not jointly owned? Originally thought to be useful for RE review See the Manual, Section 2.1: “Tie lines for TADS purposes are those AC Circuits (or DC Circuits) that are Elements which connect the AC Substations (or AC/DC Terminals) of two Transmission Owners on the NERC Compliance Registry.” We will probably drop tie line reporting in the future and just require jointly-owned circuits to be reported

Form 2.2 Jointly-Owned AC/DC BTB Converters Its similar to Form 2.1, but only requires the reporting of jointly-owned AC/DC BTB Converters

Form 3.1 AC & DC Circuit Inventory Data In Rows 1-18, the no. of circuits and associated Circuit Miles are adjusted for time in-service of added or retired circuits to properly account for exposure If circuits are added or retired, this data cannot be filed out until the end of the reporting period Appendix 7 has examples that calculate the “equivalent” data for no. of circuits and Circuit Miles

Form 3.1 AC & DC Circuit Inventory Data (cont’d) In Rows 19-25 request AC Multi-Circuit Structure Miles data only We did not define a “circuit” for common structures, so the no. of circuits is not required Reminders Multi-circuit structures that are occupied by only one circuit do not contribute to the tabulation of Multi-Circuit Structure Miles. Examples: A structure designed to have two 345 kV circuits that has only one circuit on the structure does not contribute A structure contains a 230 kV circuit and a 138 kV circuit does not contribute since the 138 kV circuit is < 200 kV

Form 3.1 AC & DC Circuit Inventory Data (cont’d) For common structures that carry circuits owned by different TOs, we expect the TOs to coordinate with each other on their reporting of Multi-Circuit Structure Miles so that no double counting takes place. As an example, suppose two circuits owned by different TOs occupy common structures for 10 miles. For this section, the combined number of Multi-Circuit Structure Miles reported by the TOs should not exceed 10. We do not want each TO to report 10 miles since that would double count the miles for the region.

Forms 3.2 and 3.3 Form 3.2 (Transformer Inventory Data) and Form 3.3 (AC/DC Back-to Back Converter Inventory Data) are similar to Form 3.1 for the number of circuits For Transformers The Voltage Class is the high-side voltage Do not include spares… only include transformers that are “in-service” energized and fully connected and that have been declared commercially in service by the TO.

Form 3.4 Contains Automatic Outage summary data Columns B and C are self-checks based upon data reported in Forms 4.1, 4.2, 4.3, and 4.4 They may be eliminated in a future TADS update. Column D is a number that the TO must derive. Its based upon the number of Elements (AC Circuits, Transformers, etc.) that are “in-service” at the end of the reporting period and which are included in column B on Form 3.1 (AC & DC Circuits), Form 3.2 (Transformers) and 3.2 (AC/DC BTB Converters)

Forms 4.1 - 4.4: Individual Element Outage Data Data that will be recorded for each outage includes… Several Element descriptors. The type of Element. A different Form is used for each Element. Its location: (e.g., Substation Names that define an AC Circuit or Substation Name where Transformer is located) The Element’s Voltage Class The TO’s Element Identifier (optional) For AC or DC Circuits, was it an Overhead or Underground Circuit? An Outage ID Code Unique ID assigned by the TO to each specific Element outage being reported An Event ID Code. Data for each Event ID Code is described on slides 31-36

Fault Type Several selections are available (Updated): No fault Phase-to-phase fault (P-P) Single phase-to-ground fault (P-G) Phase-to-phase-to ground (P-P-G), 3P, or 3P-G fault Unknown fault type Fault Types may be determined from recorded relay targets or by other analysis. TOs should use the best available data to determine (1) whether a fault occurred and, if so, (2) what type of fault occurred Relay targets should be examined as soon as possible after a fault and re-set to prepare for the next fault

Fault Type (cont’d) If a single fault results in several Element outages, the Element’s protective relays that indicated the Fault Type should be indicated on that Element’s outage. Element’s whose relays did not indicate a fault should be reported as “no fault occurred” Example: A 500 kV AC Circuit has a single line-to-ground fault that results in the outage of a 500/230 kV Transformer. The AC Circuit outage would have “ground target” selected as the Fault Type, while the Transformer would have “no fault” selected.

Outage Initiation Code An Outage Initiation Code that describe where an Automatic Outage was initiated on the power system. Five Outage Initiation Codes are available: Element-Initiated Other Element-Initiated AC Substation-Initiated AC/DC Terminal-Initiated Other-Facility Initiated - any facilities not includable in any other Outage Initiation Code Note: The Protection System is not part of an AC Substation or an AC/DC Terminal. While almost all outages involve the operation of the Protection System, the Protection System is only considered in these codes if the Protection System misoperates and therefore initiates an outage. In this case, it will be classified as Other-Facility Initiated.

Cause Codes Sustained Outages require two Cause Codes*: An Initiating Cause Code that describes the initiating cause of the outage. A Sustained Cause Code that describes the cause that contributed to the longest duration of the outage. (Momentary Outages omit this second code) Example: A lightning strike on an AC Circuit (the Initiating Cause Code is Lightning) that should have cleared normally became a Sustained Outage because of a relay misoperation (the Sustained Cause Code could be Failed Protection System Equipment or Human Error) Seventeen (17) Cause Codes are defined For 2008 an additional code is also allowed (“Unavailable”) *See 2008 exceptions in the Manual, p.13, column N, and discussed next.

Cause Codes – 2008 Exceptions All Momentary Outages must supply this code, and the “Unavailable” Cause Code cannot be used for Momentary Outages. Sustained Outages may use the “Unavailable” code in 2008 only for either the Initiating Cause Code or the Sustained Cause Code, but not both. If the TO has the ability to capture Initiating and Sustained Cause Codes, the “Unavailable” code is not to be used.

Listing of Cause Codes Weather (excl. lightning) Lightning Environmental Contamination Foreign interference Fire Vandalism, terrorism, malicious acts Failed AC Substation equipment Failed AC/DC Terminal equipment Failed Protection System equipment Failed AC Circuit equipment Failed DC Circuit equipment Vegetation Power system condition Human error Unknown Other Unavailable Definitions of each cause code are included in the Manual, Appendix 6

Vegetation Cause Code and FAC-003-1 It is possible for more Vegetation Cause Codes to be recorded for outages than are reported as vegetation outages under FAC-003-1 (Vegetation Management Program Standard) TADS records Momentary Outages due to vegetation while FAC-003-1 does not The TADS definition of a Sustained Outage is different that the Sustained Outage definition in FAC-003-1. Under FAC-003-1, a Sustained Outage is “The deenergized condition of a transmission line resulting from a fault or disturbance following an unsuccessful automatic reclosing sequence and/or unsuccessful manual reclosing procedure.” For a circuit with no automatic reclosing, a vegetation outage would not be “counted” under FAC-003-1 if the TO has a successful manual reclosing

Outage Mode Code The Outage Mode Code describes whether an Automatic Outage is related to other Automatic Outages. Several Outage Mode Codes are provided: A Single Mode Outage is an Automatic Outage which occurred independent of any other outages (if any). A Dependent Mode Initiating Outage is a Single Mode Outage that initiates one or more subsequent Automatic Outages. A Dependent Mode Outage is one that occurred as a result of an initiating outage, whether the initiating outage was an Element outage or a non-Element outage. A Common Mode Outage is one of two or more Automatic Outages with the same Initiating Cause Code and where the outages are not consequences of each other and occur nearly simultaneously (i.e., within cycles or seconds of one another). A Common Mode Outage Initiating Outage is a Common Mode Outage that initiates one or more subsequent Automatic Outages.

Outage Example #1 A tornado takes down a tower that is a common structure for two 230 kV circuits How many outages are reported? The Fault Type was for one circuit was determined to be “ground target,” while the Fault Type for the second circuit was “phase target.” What was the Outage Initiation Code? What was the Initiating Cause Code and the Sustained Cause Code? What was the Outage Mode Code? How many outages are reported? Two What was the Outage Initiation Code? Element-Initiated for both outages What was the Initiating Cause Code and the Sustained Cause Code? For both circuits, the Initiating Cause Code is Weather (excl. lightning) and the Sustained Cause Code is Failed AC Circuit Equipment. What was the Outage Mode Code? Common Mode for both outages

Outage Example #2 A circuit breaker opens due to low gas pressure, resulting in the outage of a 500 kV circuit How many outages are reported? What is the Fault Type? What was the Outage Initiation Code? What was the Initiating Cause Code and the Sustained Cause Code? What was the Outage Mode Code? How many outages are reported? One What is the Fault Type? No fault occurred What was the Outage Initiation Code? AC Substation-Initiated What was the Initiating Cause Code and the Sustained Cause Code? Initiating and Sustained Cause Codes are both Failed AC Substation Equipment What was the Outage Mode Code? Single Mode

Outage Example #3 Insulator contamination causes a fault on a 230 kV AC Circuit, but a breaker on one end fails to open due to a failure of a relay to operate properly. A second 230 kV AC Circuit, which is connected to the same bus as unopened breaker, is outaged as a result of the first circuit’s breaker failing to open. The failed relay was manually isolated, and both lines were returned to service with no other repairs. How many outages are reported? The Fault Type was determined to be “ground target” for the first circuit, and second circuit did not experience a fault, it’s Fault Type was “no fault.” What was the Outage Initiation Code? What was the Initiating Cause Code and the Sustained Cause Code? What was the Outage Mode Code? How many outages are reported? Two What was the Outage Initiation Code? First circuit – Element-Initiated. Second circuit – Other Facility-Initiated (Protection System is “Other Facility.”) What was the Initiating Cause Code and the Sustained Cause Code? Initiating Cause Codes: First circuit – Contamination. Second circuit – either Failed Protection System or Human Error, depending on why the relay misoperated. Sustained Cause Codes: First circuit – either Failed Protection System or Human Error, depending on why the relay misoperated. Second circuit – either Failed Protection System or Human Error, depending on why the relay misoperated. What was the Outage Mode Code? First circuit – Dependent Mode Initiating. Second Circuit – Dependent Mode

Outage Example #4 A 345/138 kV Transformer in one leg of a three-terminal 345 kV AC Circuit is outaged due to a 138 kV bus fault caused by contact with a snake. The Transformer and its terminal are isolated, but the other terminals remain in service. How many outages are reported? What is the Fault Type? What was the Outage Initiation Code? What was the Initiating Cause Code and the Sustained Cause Code? What was the Outage Mode Code? How many outages are reported? No outages are reported. The Transformer is not a TADS Element, and the 3-terminal circuit is considered to remain in service even with one terminal out because that terminal contains a Transformer. What is the Fault Type? Not reported What was the Outage Initiation Code? Not reported What was the Outage Mode Code? Not reported What was the Initiating Cause Code and the Sustained Cause Code? Not reported

Outage Times The Outage Start Time - The date (mm/dd/yyyy) and time (hhhh:mm), rounded to the minute, that the Automatic Outage of an Element started Outage Start Time is expressed in Coordinated Universal Time (UTC), not local time Common time reference will allow REs and NERC to assign common Event ID Codes to Events that cross TO and RE boundaries The Outage Duration (for Sustained Outages only), rounded to the nearest minute. Momentary Outages are recorded as a zero minute outage duration time to avoid confusion in rounding to the nearest minute For outages that continue beyond the reporting period, see Section 4.1 of the Manual

Partial Outages With one exception, TADS does not recognize partial power flow outages. The exception is a three-terminal circuit with a Transformer on one leg. If terminal A or B open, an AC Circuit outage is recorded. The AC Circuit is considered to be restored when partial power flow is restored on both A & B and the Transformer (TADS or non-TADS) is out-of-service.

Form 5: Event ID Code Data An Event ID Code. An Event is a transmission network incident that results in the Sustained or Momentary outage of one or more Elements. Each TO will assign its own Event ID Code, with the reporting year appended to it. Regional Entities and NERC will assign common Event ID Codes if outages affect two or more TOs.

Form 5: Event ID Code Data (cont’d) An Event associated with a Single Mode Automatic Outage will have just one Event ID Code.  Each outage in a related set of two or more outages (e.g., Dependent Mode, Dependent Mode Initiating, Common Mode, or Common Mode Initiating) shall be given the same Event ID Code.

Form 5: Event ID Code Data (cont’d) The Event Type Number Event Type Number Possibilities

Event Type No. 30 or 40 To qualify for an Event Type No. 30 or 40, the outages must be a direct result of the circuits occupying common structures. These characteristics will generally apply. The Outage Initiation Codes are either Element-Initiated or Other-Element Initiated. The Outage Mode Codes are one of the following: (a) Dependent Mode Initiating (one outage) and Dependent Mode (second outage); (b) Common Mode Initiating and Common Mode (two outages); or (c) both Common Mode (two outages)

Assign an Event Type No. On one circuit, a conductor breaks (outaging the circuit), and the conductor swings into a second circuit on common structures and outages the second circuit. Both circuits have Normal Clearing. Event Type No. = ? Two AC Circuits on common structures are outaged due to a bus fault in the AC Substation were the circuits terminate. Both circuits have Normal Clearing. Event Type No. = ? First bullet: Event Type No. = 30 Second bullet: Event Type No. = 50

Form 5: Event ID Code Data (cont’d) Was the Event was associated with the filing of a disturbance report (an EOP-004-01 disturbance report filing)? TO may select “yes, “no,” or “unknown” NERC staff will examine reports to fill in “unknown” responses Year-to-date public (i.e., non-confidential) data of all disturbance report filings are located at http://www.nerc.com/~filez/dawg-disturbancereports.html Info on disturbance reports is an “impact measure” Since TADS tracks a part of the transmission system, other potential measures (load lost, transmission service interrupted) would be a subset of the impacts

AC Multi-Owner Common Structure Flag For AC Circuits only: AC Multi-Owner Common Structure Flag = 0 Not applicable. The circuit is not on common structures with another circuit, or the circuit is on common structures, but all circuits are owned reported by the same Transmission Owner. No analysis of the Event ID Code or the Event Type Number is required by the Regional Entity. = 1 Circuit is on common structures with another circuit that is being reported and owned by a different TOs Transmission Owner. The Regional Entity will need to examine Outage Start Times with this same flag to determine whether a second circuit had an outage with nearly the same Outage Start Time, and if so, whether the TOs properly coordinated their Event ID Codes and Event Type Numbers.

Examples: Inventory & Outage Mode Examples in the Manual were developed to assist TOs in responding properly to TADS data request Both inventory and outage mode examples are included in the data instruction manual Inventory examples are designed to demonstrate proper calculation of entries in Form 3.1 (AC/DC Circuit Inventory Data) But they are applicable to all Elements Outage mode examples are provided to illustrate several AC Circuit & Transformer outage scenarios

TADS Metrics Intent of the proposed metrics is to assist in measuring performance Given richness of the data collected, metrics can be computed for many data combinations Comprehensive set of metrics not established yet – waiting until sufficient amount of data collected Basic metrics presented here will be reported to describe the performance of each Element for the reporting year.

Metrics and Data Analysis - Basic Metrics Outage frequency (Sustained, Momentary, and total) For AC and DC Circuits: Outage frequency/100 Circuit Miles (Sustained, Momentary, and total). Additional calculations for Events 30 and 40 per 100 Multi-Circuit Structure Miles Additional calculations will exclude outages not related to mileage For Sustained Outages: Outage Duration Mean Time Between Failure -MTBF Mean Time to Repair – MTTR Median Time to Repair - MdTTR Percent Availability Percent of Elements w. zero outages. Percent of Element outages that were associated with a disturbance report.

Metrics and Data Analysis- Additional Items MTBF and Percent Unavailability will not follow standard industry terms since no planned outage data will be collected in Phase I Lots of ways to “slice” metrics (Cause Code, Outage Mode, Event Type#, etc.) Additional metrics will be determined – we will work with the data looking for meaningful information