Requirement Change Control Procedure

Slides:



Advertisements
Similar presentations
Internet Resource Policy Evaluation Process. facilitates the advancement of the Internet through information and educational outreach allocates Internet.
Advertisements

Open action items Database SIG APNIC 18 Nadi, Fiji.
SIS Report Jerry Smith Albuquerque, NM March 7, 2008.
Educational Approval Board Approved Schools Conference The EAB: Past, Present and Future David C. Dies, EAB Executive Secretary November 13, 2008.
Configuration Management
Process and Procedure Documentation. Agenda Why document processes and procedures? What is process and procedure documentation? Who creates and uses this.
In the Spirit of Service Not Self for Veterans, God and Country Governance and Governing Documents.
Finalizing the IEP Process Consent for Initial IEP PWN following the IEP Copies to Parent IEP Amendments Revocation of Consent West Virginia Department.
HB1438 Update & Statewide Capital Planning Initiative Office of State Finance Department of Central Services November 8, 2011.
Regional Accreditation Workshop For Latin America & Caribbean Region Panama City, Panama th Nov, 2011.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
1.4.1 Poverty Alleviation Project Management 1 POVERTY ALLEVIATION PROJECT MANAGEMENT UPA Package 1, Module 4.
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 4: Create an Action Plan Toolkit 4: Create an Energy Management.
Overview of Grants Process Prof. James Machoki M’Imunya Principal Investigator, IEARDA University of Nairobi, Kenya.
The Sustainability Cycle (update of…) Baseline Review Core document: Sustainability Report Target Setting Core document: Sustainability Targets Political.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Prepared by AHMED AL-MAIMOUNI. - OUTLINE - PROCESS OF CHANGING ALARM TE14 Introduction Process Of Request Changing Alarm TE 14 Quality Tools Used For.
LCM Support for TPF Development Process Flow. Project Inception Production Implementation Project Close Research & Design Construction Testing LCM.
Georgia Institute of Technology CS 4320 Fall 2003.
Policy Experience Report Leslie Nobile. The PDP Cycle Need Discuss Consensus Implement Evaluate
Local Wellness Policy for RCCIs: A Team Approach.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MANAGING BUSINESS RISKS AN OVERVIEW CSU, Northridge January, 2004 Chris Brady University Risk Manager.
Goals of the Workshop BUILD A COMMUNITY INTERESTED IN EVALUATION DEVELOP APPROACHES TO EVALUATION THAT COMBINE ACCOUNTABILITY AND LEARNING USE EVALUATIONS.
Pollution Prevention and Environmental Essentials Conference – 2002 How An EMS Can Enhance Your P2 Program Presented by Mike Garcia.
Selecting Evidence Based Practices Oregon’s initial attempts to derive a process Implementation Conversations 11/10.
Government Impact on Adoption and Expansion of eSignatures and eRecords Kevin Hatton Director, E-file Provider Program Management Internal Revenue Service.
FREP Vision: Sustainability through science and stewardship.
Requirements Management and Changes Copyright, 2003 © Jerzy R. Nawrocki Requirements.
ITIL Project Change Management Workshop 7 February 2007
May 3, 2016 Presented by: Jamila Piracci, Vice President, OTC Derivatives Alessandra Riccardi, Director of Capital and Risk NFA Webinar: Margin Model Approval.
Program Evaluation of the Least Developed Countries Fund (LDCF) (Prepared by the Independent Evaluation Office of the GEF) 20th LDCF/SCCF Council Meeting.
Required Documentation: Determination and Overview (EPTM Chapter 3)
Update. Objectives and Action Item Update board on provider status implementation Update board on legal issues Board Action Item – Approve hiring of graphic.
Date/ event: Author: Incorporating Resource Efficiency- A general approach Copenhagen Petra Ronen, CENIA.
Risk Assessment Beginning an Analysis Date by Jim Bowman.
Project Management Cycle and AIMS, institutional arrangements and policies Podgorica, May 2007 Gabriel Accascina.
Forest Law Enforcement and Governance in Central Asia
Configuration Management
Software Configuration Management
Software Project Configuration Management
2017 Llano Estacado Regional Water Plan Planning Group Meeting
CBP Biennial Strategy Review System
Configuration Management
Campus Master Plan.
SIX NATIONS OF THE GRAND RIVER
Supervisor completes Dept. Goals/Employee completes Self-Evaluation
آقای دکتر گلزاری سرکار خانم چراغی آبان 95
TDI-Brooks Procedures
Histocompatibility Committee
IEEE C /36 Project IEEE Working Group on Mobile Broadband Wireless Access Title Proposed Work Plan.
CBP Biennial Strategy Review System
Safety Risk Management (SRM) Process Overview
Concept Proposal template for presentation by Dean to evaluation panel
Policy SIG Thursday 26 February Manila, Philippines
Current initiatives at Macquarie
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
ALBANIA ROAD MAINTENANCE PROJECT TRAINING WORKSHOP.
UKL Future Release Prioritisation & Scoping Approach
WG C – Groundwater Activity WGC-3 Integrated Risk Assessment and Management Wouter GEVAERTS Thomas TRACK Dietmar MÜLLER.
Standard Follow Up Procedure
Accelerated Interest Based Problem Solving
SA&S-Fortnightly Status Report – Overview Period Ending 21 Feb 2018
Database SIG APNIC19 24 February 2005, Kyoto, Japan
Policy SIG Thursday 28 August Christchurch, New Zealand
Central Valley Water Board Meeting of 29 March 2012
Change Tested or Implemented
Agricultural Land & Avian Foraging Habitat Mitigation Fee
Presentation transcript:

Requirement Change Control Procedure Policy, Design, and Functional Operational Use and Sustaining Effort Performance, Test & Evaluation, etc. Requirement Change Proposal Requirement Change Proposal Requirement Change Proposal Change Control Board Evaluation of Change Impact: Development of a Change Implementation Plan Is the Change Feasible? Yes Affects on Performance, Effectiveness, Life-Cycle Costs, etc. Proposed incorporation date, ensuing affected requirements, etc. Resources required to implement the change Cost of implementing the change Etc. No No Further Action Return to Continuing Operational Status Develop Change Procedures Incorporate Approved Change Yes Is Change Adequate? Update Documentation and Database Dispose Residue No Redesign Required Requirement Change Control Procedure