NEXCOM by Bruce Eckstein FAA.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

U.S. Plans for ADS-B Briefing for
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
FAA AMHS Subnetwork Overview
GLOBALink/HF Data Link
Next Generation Air/Ground Communications (NEXCOM)
1 Multi-Function Multi-mode Digital Avionics (MMDA) NASA Glenn Research Center – End of FY05 Status Presented to ICAO ACP WGC-11 GRC/James Budinger September.
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
Communication Domain Future Aeronautical Communications
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Future Communications Roadmap
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
International Civil Aviation Organization
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Next Generation Air/Ground Communications (NEXCOM) Program Presented to Airborne Internet Collaboration Group Reston VA April 17, 2003 Dieter Thigpen Integrated.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
By: Date: Federal Aviation Administration Focus on the Future 8 th Annual V&V Summit 2012 John Frederick Test Standards Board Chairperson Manager, V&V.
ADS-B An Industry Perspective New Technologies Workshop Washington, DC January 10, 2007.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Presented By: Peter Muraca FAA Technical Center Atlantic City, NJ USA
International Civil Aviation Organization
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Workshop on preparations for ANConf/12 − ASBU methodology
FAA Ground to Ground ATN Implementation Plan
NEXCOM Next Generation Air/Ground Communications
Presented by Thales Avionics ATN 2003 London, UK September 2003
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
International Cooperation
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
International Civil Aviation Organization
International Civil Aviation Organization
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002
NEXCOM Next Generation Air/Ground Communications Appendix G
International Civil Aviation Organization
NEXCOM by Bruce Eckstein FAA.
15-19 Nov 2010 Rockville, MD – Lockheed Martin
AIRCRAFT(ARINC) COMMUNICATION, ADDRESSING AND REPORTING SYSTEM
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
DATA LINK IMPLEMENTATION IN EUROPE
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS
ATN Subnetwork Implementation:
An Airline Perspective
Joint FAA/Eurocontrol Future Communications Study (FCS)
International Civil Aviation Organization
International Civil Aviation Organization
Presentation transcript:

NEXCOM by Bruce Eckstein FAA

NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program in May 1998 NEXCOM Program is fully funded + must address the spectrum congestion US community supports approved to implement VDL Mode 3 as the technological solution to spectrum congestion currently acquiring a Multi-Mode radio FAA Administrator asked the community for input on the current path established NEXCOM Aviation Rules Committee (NARC) Information has not been provided to the FAA or administrator Due to FAA administrator in May 2001

Voice and Data Communications Implementation Path 2001-2002 2003 2004 2005 2006 2007 -10 2011 - 2015 2015 - 2020 Voice A/G Subnetwork Legacy Analog Voice Enroute NEXCOM Digital Voice (VDL-3) NEXCOM Analog Enroute Nexcom Phased DEM/VAL Data A/G Subnetwork VDL-2 VDL Mode 3 VDL-3 Data will be deployed and turned on per agreement in the RTCA Transition Implementation Plan Data Applications VDL Mode 2 PDC ATIS via ATN CPDLC 1 CPDLC 1 A CPDLC 2/ADL 25kHz Voice Radios Avionics 25/ 8.33/ VDL-2 data/ VDL-3 Voice & Data VDR 25/8.33/VDL-2 data VDR 8.33/25kHz VDL-2/VDL-3

NEXCOM Program Strategy 2000 2002 2004 2006 2009 OUTCOME JRC Decision 5/00 Radios for MDR Deployment Infrastructure Sustainment Ground Radio MDR CA (7/01) VDL-3 IOC VDL-3 Evaluation Prototype Development VDL-3 Operational Evaluation VDL-3 VDL- 3 System Development Integrated Voice & Data JRC Decision 9/04 Systems Developed and Digital Voice Evaluated RTCA SC 198 Con-Ops / Transition/ Implementation & Evaluation Plans Avionics Development (with FAA funding) RTCA SC 172 VDL-3 SARPs MASP MOPs Use Commitment and Aircraft Equipage for digital voice AEEC Avionics Characteristics Rules Development User Equipage Rules Published VDL-3 VDL-3 Voice Deployment Spectrum Relief Available