G0 Backward Angle Accelerator Preparations

Slides:



Advertisements
Similar presentations
Source Outlook High polarization strained-layer photocathodes were activated in both electron guns during the summer shutdown, with usual QE (0.2% at 850.
Advertisements

CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
PN12 Workshop JLab, Nov 2004 R. Michaels Jefferson Lab Parity Violating Neutron Densities Z of Weak Interaction : Clean Probe Couples Mainly to Neutrons.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
/SC-PAC Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Joe Grames CEBAF Operations
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
G 0 PC Installation and Beam Studies Stephanie Bailey Riad Suleiman.
Beam Optics for Parity Experiments Mark Pitt Virginia Tech (DHB) Electron beam optics in the injector, accelerator, and transport lines to the experimental.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beams.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Injector Update
Beam Commissioning Adam Bartnik.
Parity Violation Experiments & Beam Requirements
Bubble Chamber Schedule – 2017
Spin Precession At CEBAF
Joe Grames Center for Injectors and Sources
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
CEBAF Injector Update PREX/CREX March 3-4, 2017
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
Status of ATF/ATF2 and machine schedule in this fall
Revised Commissioning Strategy
G0 Accelerator Planning Meeting (11/1/05)
Parity Violation Experiments at JLEIC
Parity Quality Beam (PQB)
The Cornell High Brightness Injector
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
Thoughts on why G0 needed position feedback and HAPPEX didn't
Thoughts on why G0 needed position feedback and HAPPEX didn't
LINAC4 commissioning plans etc.
QWeak Collaboration Meeting
Polarized Positrons at Jefferson Lab
G0 PC Installation and Beam Studies
LAL meeting on e+ studies, Oct. 2010
Qweak Coordination Meeting
Center for Injectors and Sources
Polarized Source Development Run Results
Adiabatic Damping and Parity Quality of Low Energy
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
Polarized Source: Recent Activities
PQB Meeting March 05, 2009.
Injector Setup for G0 and HAPPEX & Lessons Learned
G0 PC Installation and Beam Studies
Injector Commissioning & Optimization
Proposal for a CESR Damping Ring Test Facility
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
Presentation transcript:

G0 Backward Angle Accelerator Preparations Joe Grames (G0 Project Coordinator) Infrastructure & Planning Scope of Work CEBAF Preparations Polarized Source Injector Accelerator Hall C 2006 Program

Hall C Conduct Of Operations (COO) & Resource Allocation Survey/Align. Cryogenics ME Design Vacuum/Install. CASA EGG EES ACE Operations PSS RadCon Software

Scope of Work Sep. ‘05 - Coordinated preparation begins Oct. ‘05 – Extended Hall C down begins Jan. ’06 – Accelerator Shutdown Firm Schedule Mar. 15 – Apr. 2, Commissioning Period (following long down) Apr. 3 - Apr. 29, High Q2 Run (687 MeV) (3-halls, all polarized) Tentative Schedule Jul. 21 - Sep. 1, Low Q2 Run (362 MeV) (1-pass, 1-linac, 2-halls) Sep. 22 - Dec. 22, High Q2 Run (687 MeV)

CEBAF Preparations – Polarized Source Laser Ti:Sapphire (780 nm) f ~ 499 MHz Parity Quality Laser Setup G0 Helicity Sequence G0 Ownership of InjDAQ Pockels cell alignment IA intensity FB Rotatable ½-waveplate Insertable ½-waveplate Polarized Source Gun2 (or Gun3) Anodized SL-GaAs P > 80% Ibeam ~ 80 mA

CEBAF Preparations – Polarized Source Polarization ~86% Lifetime ~130 C A = 20 mA B = 5 mA C = 80 mA ~10 C/day

CEBAF Preparations – Injector Helicity correlated position differences generated at the source are suppressed by natural process of adiabatic damping (ratio of transverse to longitudinal momentum becomes smaller as beam is accelerated). “Matching” the beam emittance to the accelerator acceptance achieve damping. A poorly matched beam may result no (or larger) position differences. Matching in the accelerator proper (linacs & arcs) routinely demonstrated. Matching in the injector has been an arduous, long (~2 year) process. X-BPM (mm) Y-BPM (mm) without X-PZT (Source) 1C-Line 1C-Line with X-BPM (mm) Y-BPM (mm) Y-PZT (Source) 1C-Line 1C-Line

G0 requirements => <2 ppm <40 nm Experiment Photocathode Charge Asymmetry at Target Position Difference at Target Spec Achieved HAPPEX-I Strained 1 ppm 0.4 ppm 10 nm HAPPEX-He Superlattice 0.6 ppm 0.08 ppm 3 nm HAPPEX-H & 2.6 ppm 2 nm 8 nm HAPPEX-He (2005) ? 4 nm (x) 17 nm (y) (2005) Injector Match 0.2 ppm 1 nm (x) 1 nm (y) G0 requirements => <2 ppm <40 nm

CEBAF Preparations – Injector Helicity Magnets Will replace PZT mirror (electron beam vs. laser beam) 4 magnets => position (x,y) & angle (x’,y’) Linear, Independent, Electrically isolated Fast rise time & correlated with helicity pattern Orbit set in each helicity state (PZT set in one helicity state) Resolution presently 100 nm/DAC step (at 5 MeV) New DAC to be installed => 10 nm/DAC step (at 5 MeV)

CEBAF Preparations – Accelerator PZTBooster Concept: Injector matching process Time consuming Small amplitude signal Helicity Magnets in new “Optics Mode” Runs triggered to BPM acquisition system Large amplitude signal Goal: Streamline injector matching Improve accuracy of result Allow for rapid confirmation

CEBAF Preparations – Accelerator Planning for accelerator proper (after injection & before extraction) is mainly directed toward the very low energy run, which exists on the tentative schedule. To conserve electrical power the north linac will be ON and the south linac will be OFF (so that ARC1 can transport the beam). We will retain cavities in SL for energy feedback only Test of half pass extraction in December OK; require shielding in the extraction line to improve orbit control. Tentative schedule A & C run together in this configuration: We will extract to 5th pass line and use one RF separator Test of 2-beam extraction in December demonstrated feasibility.

CEBAF Preparations – Hall C Accelerator division support leading to installations/modifications: Install Moller kicker to allow high current polarimetry Move Moller quadrupole to reach low energy polarimetry Arrange focussing optics to improve spot size (halo?) control Install cyrogenics platform to meet safety requirements Re-install Halo & G0 girder, improve mating to G0 spectrometer Accelerator division supporting preparations/calculations: Radiation analysis for beam dump at low energy, high current Efforts now shifting toward checkout, beam delivery, commissioning plans, operations, & safety.

2006 Program Presently in the Winter shutdown Hall C work continues on schedule (Gaskell reports) January activities Polarized source prepared Laser setup PQB source commissioning 5 MeV helicity magnets checkout Injector Setup & Matching Parity Quality Beam setup 2-beam extraction test