Community Connectivity Analysis to Support Active Living Brent Turley, PE BMPO Joint Policy Board/TAC Meeting November 9, 2011.

Slides:



Advertisements
Similar presentations
Can A Schools Location Make A Kid Fat? Arizona Safe Routes To School Program.
Advertisements

Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
CALENDAR.
City of Hubbard Transportation System Plan Update April 25, 2012.
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
November 21, September 27, 2010 the Board requested an independent consultant study, review, and recommend adjustments to the Student Assignment.
Traffic Impact Study “Study to evaluate the impact on a roadway network due to a proposed development”
CityCo, Piccadilly Hoteliers Forum
Fine Tuning Boulders transportation system Presented by: Marni Ratzel GO Boulder/ city of boulder making infrastructure work for biking and Walking.
McKenna Boulevard Traffic Management Meeting Presented to: McKenna Blvd. Residents W. Madison Police Precinct, Madison June 13, 2007.
City of Oakland: Road Diet Experience
Concept Plan Presentation October, THE OPPORTUNITY A large portion of the area between Peger Road and Denali School is under utilized public land.
December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th.
& dding ubtracting ractions.
U.S Aerial View of construction Distant shot of Intersection of Hwy 71/20.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Cowlitz Regional Trails Plan. Introduction Cowlitz County Parks Facilities Plan Cowlitz County Parks Facilities Plan Cowlitz County Bikeway Plan Cowlitz.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
NCHRP Renaissance Planning Group Rich Kuzmyak Chris Sinclair Alex Bell TRB National Transportation Planning Applications Conference May 6, 2013 Columbus,
Examples of Context Sensitive Solutions in an Urban Environment ITD Project Development Conference April 7, 2005 Doug Camenisch, P.E. Parametrix.
NORTHEAST CORRIDOR INFRASTRUCTURE (NECI) BICYCLE FACILITIES STUDY Bicycle Advisory Committee (BAC) Update in collaboration with: + STV/Ralph Whitehead.
City of Ashland Transportation System Plan Update September 6 th, 2012.
Contact: Beth Morris
Nonmotorized Regional System Plan 1 3 rd Technical Task Force meeting Regional Nonmotorized Transportation System Plan Thursday April 3 rd 2014 Steer Davies.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
© 2014 HDR, Inc., all rights reserved. A Colorado Springs MPO Pilot Implementation Study Network Robustness Index (NRI) Application to Security Critical.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Project Evaluation Database System for MORPC’s 2012 Metropolitan Transportation Plan (MTP) May 7, 2013 Nick Gill Zhuojun Jiang.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Modelling of Trips using Strategic Park-and-Ride Site at Longbridge Railway Station Seattle, USA, Oct th International EMME/2 Users Conference.
Land Use Study for the Community of Winchester July 9, 2012.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Missoula Long Range Transportation Plan 11 December 2008 Open House.
Bicycling in Montgomery County Where we are and where we’re going Montgomery Bicycle Advocates (MoBike) – 5/14/11.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Thursday, November 18, 2010 LOMBARD DOWNTOWN PLAN Village Board Meeting Lombard Downtown Revitalization VILLAGE BOARD MEETING Thursday, November 18, 2010.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
The Main Street Bike Lane Project LADOT Bike Program.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
8/7/02 Dane County Vandewalle & Associates Strand Associates William O’Connor Roadway Concept Select Link Traffic Modeling August 7, 2002.
Pedestrian Safety & Mobility Assessment Tool. Background Pedestrian Safety Impact Statement requested by Citizens’ Advisory Committee January 2010 Intended/Potential.
Center for Urban Transportation Research | University of South Florida Developing Customer Oriented Transit Performance Measures National Transit GIS Conference.
A GIS-BASED ACCESSIBILITY APPROACH FOR ESTIMATING NON-MOTORIZED TRAVEL DEMAND Alex Bell, AICP May 18, 2015.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
Walk Statistics.  The question has been asked: “Is Lomas a better BRT corridor than Central?”  The purpose of this analysis is to compare the two corridors.
Minnesota State Planning Conference September 28, 2011.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Maintenance and Temporary Traffic Control
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
 Connect the Coastside Presentation Half Moon Bay City Council Briefing March 15,
A Proposal for a Protected Bicycle Route in Tucson, Arizona, Feasibility and Implications for Public Health and Safety University of Arizona, College of.
ARCH – 4601 Feasibility Study Presentation
Hillsborough MPO School Safety Study
For Complete Streets FDOT DRDE Meeting
Innovation North-Side Neighborhood Access Feasibility Study
Nolanville Main Street Sidewalk & Bicycle Connectivity
River to Sea TPO Meeting US 92/International Speedway Boulevard
Hillsborough MPO School Safety Study
Transportation Workshop
Integrating Trails into Transportation Networks
Presentation transcript:

Community Connectivity Analysis to Support Active Living Brent Turley, PE BMPO Joint Policy Board/TAC Meeting November 9, 2011

The Nexus? Connectivity: The quality of a network to facilitate travel between two points. Good connectivity means removed barriers to travel Good pedestrian and bicycle connectivity means greater opportunity for active living trips Connectivity can be a performance or priority metric Connectivity can be one of several metrics to evaluate active living policies over time

Point-to-point GIS routing? The direct measure of connectivity

B Route Directness Index 71 Distance Decay Score 91 ViaCity Score 81 A

Existing With Connectivity Projects Example

Other connectivity metrics? MetricConstraint HCM 2010 Multimodal LOS (NCHRP 616) Facility based; Not sensitive to network systems, barriers, or key connections Travel demand modelsNot scalable to pedestrian or bicycle level of detail Walkscore (or similar web tools)Informational only; Not applicable for project planning Intersection densityIndirect metric; Not sensitive to projects GIS bufferingIgnores network completely

LOCAL EXAMPLES BMPO Analysis

Study Locations Downtown Schools (2) Parks (2)

Are these destinations well connected to surrounding areas? Analysis Process Select parcels/building within 0.5 mile buffer around site Enhance street network to create pedestrian network Assign pedestrian quality to each network link Calculate connectivity metric (ViaCity score) Review results, run/compare scenarios

Downtown Good sidewalk coverage Barriers: River Railroad Yellowstone Hwy S Boulevard

Downtown Scores: Average = 65 Over 60 = 73% Problem areas: Northeast South Southwest

Tautphaus Park Few sidewalks near park Barriers: Rollandet Ave S Boulevard Park access points On-site network

Tautphaus Park Scores: Average = 53 Over 60 = 29% Problem areas: Points west Southeast Adjacent streets

Sand Creek Middle School Set back from arterials Barriers: Canal Paved connections to west Arterials

Sand Creek Middle School Scores: Average = 54 Over 60 = 32% Problem areas: North (canal) West (multi-family)

Iona City Park Recent pathways Barriers: Some arterials sections No defined routes

Iona City Park Scores: Average = 63 Over 60 = 56% Problem areas: Defined routes

Eagle Rock Jr High School No sidewalk along collectors or arterials Barriers: Broadway St Skyline Dr Pancheri Dr

Eagle Rock Jr High School Scores: Average = 54 Over 60 = 49% Problem areas: Crossing Broadway Crossing Skyline

Eagle Rock Jr High School Link Ranking Another metric Aggregation of shortest paths from each parcel Potential high priority links

Summary Statistics Average ViaCity Score Percent Parcels > 60 Number Total Parcels Downtown6573%1,776 Eagle Rock Jr High5449%1,514 Tautphaus Park5329%2,024 Sand Creek Middle5432%1,225 Iona City Park6356%587

BEFORE & AFTER Examples

Eagle Rock Before Scores: Average = 54 Over 60 = 49%

Eagle Rock After Scores: Average = 57 Over 60 = 49% Project: Crossing Skyline

Eagle Rock Change Parcels impacted: Change > 5 = 163 Change > 20 = 132

Sand Creek Before Scores: Average = 54 Over 60 = 32%

Sand Creek After Scores: Average = 56 Over 60 = 35% Project: Yard crossing

Sand Creek Change Parcels impacted: Change > 5 = 113 Change > 20 = 66

Questions? Brent Turley, PE Ross Racine