Preparation for the SSPC QP Audit

Slides:



Advertisements
Similar presentations
for Cabin Safety Inspectors
Advertisements

Territory Specialist Training. Who is Lifetime Learning? Lifetime Learning offers support and resources for people interested in going to or returning.
Tips to a Successful Monitoring Visit
(Individuals with Disabilities Education Improvement Act) and
Checking & Corrective Action
Giving an Effective Technical Presentation: Planning.
EPA Regions 9 & 10 and The Federal Network for Sustainability 2005
Presented by YOUR NAME THE DATE
1 Code 210 Training Forum May 14, 2008 Agenda I.Welcome/Introduction II.ISO General Principles III.ISO Basics for Code 210 IV.Upcoming ISO Audits V.Code.
Planning for Certification in Plan your project In this presentation we present the tasks that must be completed in order to achieve certification.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
OVERVIEW OF ClASS METHODS and ACTIVITIES. Session Objectives By the end of the session, participants will be able to: Describe ClASS team composition.
Samuel Steel Safety Group Meeting Four November 14, 2013 Samuel Safety Systems.
Substitute FAQs SubFinder Overview. FAQs Do I have to have touch-tone service to use SubFinder? No, but you do need a telephone that can be switched from.
Division of Child Care STARS Interim Report. What is an interim report? Programs participating in the STARS for KIDS NOW program must demonstrate continued.
Notice of Compliance Audit
Continual Improvement Ensuring the EMS is Effective! Internal Auditing, Corrective Actions & Management Review.
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
FPSC Safety, LLC ISO AUDIT.
ASPEC Internal Auditor Training Version
ISO 9000 Certification ISO 9001 and ISO
Quality Representative Training Version
Challenges Faced in Developing Audit Plans and Programs 21 st March, 2013.
Loss Control Program Compliance Audits An overview of the purpose and procedures of program auditing.
Welcome to the University of West Florida Online Employment System Applicant Tutorial.
Chapter 7 Preparation for the Audit ACCT620 Internal Auditing Otto Chang Professor of Accounting.
How To Prepare For A CIP Audit Scott Barker CISSP, CISA CIP Compliance Workshop Baltimore, MD August 19-20, 2009.
HOW TO ESTABLISH S.M.A.R.T GOALS
Preparing for an Audit Roy De Lauder, CPPM, CF NOVA Chapter Today’s instructor is:
Setting up an Internal Audit Program By
ISO 9001: 2000 Certified Audit Process What to do.
Being Audited – Life on the Other Side of the Fence.
INTRODUCTION TO AUDITING
Company Confidential Registration Management Committee 1 Completing Independent Assessments Robert Flaharty & John Horan January 17, 2013 OP Assessor Workshop.
SECBE SDL Accelerate EMS Willmott Dixon – Ellmer Construction Month 6 – Audit and Review 7 April 2008.
Safety Auditors Conference 2005 A Practical Approach…….
Material Adopted From: “The Internal Auditing Pocket Guide” --- J.P. Russell.
Professional Truck Driver Institute Driven by Excellence Measured by Quality March 19, 2015.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Introduction This presentation is intended as an introduction to the audit process for employees of entities being audited by MACD. Please refer to the.
VETERANS BENEFITS ADMINISTRATION Compliance Surveys October 6, 2015.
Compliance Survey Visits Theresa A. Gibson, Program Specialist Melanie A. Moynahan, L.M.S.W., Program Specialist Houston Field Personnel.
A QUALITY IMPROVEMENT TOOL
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
TOTAL QUALITY MANAGEMENT
HunterDouglas VPP TRAINING.
Preparing for your HIPPY Accreditation visit Accreditation 101.
Preparing your accreditation documents Accreditation 104.
Preparing for an Audit Roy De Lauder CPPM, CF NOVA Chapter General Dynamics Advanced Information Systems.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
The FTA Drug & Alcohol Audit Process George Gilpatrick & Michael Redington.
Planning meetingCertification audit, stage 1 Pre-audit (optional) Document review Prior to every certification audit a planning meeting is conducted where.
Good Agricultural Practices And Good Handling Practices Audit Verification Program (GAP/GHP)
Training Objectives Upon conclusion of this training, you will know the following: Why compliance surveys are conducted When compliance surveys are conducted.
Introduction The purpose of this session is to:
Registration Audit Escort & Managers Information
CONDUCTING OF GMP INSPECTION
PREPARATION FOR GMP INSPECTION
Introduction to Internal Audits
Setting up an Internal Audit Program
Audit Planning & Service Method Geotek Global Certification Pvt. Ltd.
DHL Delivery Processes
Witness Assessment AS9104/2A
Internal Audit Training
Employee Presentation #2
Honeywell Aerospace Kruti Tanna October 30, 2018
Presentation transcript:

Preparation for the SSPC QP Audit How do I prepare for my upcoming audit?

Are you on the same level? Does your Management Rep in charge of maintaining your QP quality system truly understand the QP standard and how it applies to your business? Has the Rep communicated with your field/shop personnel and office staff on what the SSPC auditor will be looking for during an audit, especially what information needs to be at a field job site? The SSPC web site will tell you what information is required to be available on site for the auditor Review previous SSPC audits and your own internal audits to ensure understanding of the SSPC auditor’s approach to the items on the QP evaluation checklist. Prepared for an unannounced visit? They do happen!

SSPC Auditor Has the auditor been at your facility/job sites before? Yes- Then the auditor has some familiarity with the operation and all the auditor needs is a refresher when on-site prior to the commencement of the audit. N0- Then the auditor needs a strong subject matter expert of the operations of the facility to provide a comprehensive tour to indoctrinate the auditor. Ask for I.D. if auditor is unknown to you.

Preparing the Facility/Job Site Ensure Management and field or shop personnel are aware of the QP audit plan. Establish points of contact related to the audit plan so the auditor will be directed as to who to audit. The auditees need to be available Everyone in a facility/job site is open to being audited however ensure that the one’s “targeted” are the ones that fall under the scope of the audit plan. Ensure that the selected auditees are aware of the objective evidence they are to have available to present to the auditor when requested as outlined in the audit plan. Important-ensure that there’s an office or spot in the field trailer that the auditor can work out of to ensure privacy to work effectively on the audit report.

Presenting Pre-Information The auditor (prior to the opening meeting) will need the following documentation: Latest copy of the Quality/Safety/EC plan for the project(s) audited Any Corrective Actions that were issued as a result of a prior audit that had not been forwarded already.

Opening Meeting Ensure that all senior management/key personnel are available Introduce the auditor to the team. Even though this is not the first time the auditor might be at your facility, the auditor still needs to put a face with a name. An opening meeting typically should not take more than 15-30 minutes.

Audit Your Management Representative should escort the auditor the entire time except when the auditor asks to speak to someone privately. Following the audit plan and meeting with the prior identified auditees. As the rep you should be holding a copy of the audit plan to ensure that you are not drifting off from the initial plan. This is with the understanding that if the auditor notices a possible non-conformity to the standard then the auditor has the right to follow that specific trail to verify yes or no.

Closing/Exit Meeting Once the Audit Plan has been followed and all areas have been audited, ensure that you have scheduled the closing meeting in advance so that the auditor has time to prepare and present findings, if any. The auditor normally needs approximately 30 mins-1 hour to prepare for the closing or exit interview meeting.

Closing Meeting (Cont.) Ensure at a minimum that the personnel that were at the opening meeting attend the closing meeting. Allow the Auditor to review the report to its conclusion. If there are any discrepancies discuss after the Auditor has finished reviewing the findings. Understand that if a disagreement with a finding is noted ensure that objective evidence is available to nullify the finding. Sign the exit meeting form/deficiency schedule

Conclusion A complete understanding of the Standard audited to is necessary. A complete understanding of Your Business is needed on both sides. This is teamwork to the Nth degree. As the recipient of a Certification you will profit by meeting customer requirements, ensure expanded business, operate more productively Establish a connection with the SSPC that ensures understanding for all upcoming QP audits.