Replacement of Vechicle Bridge over Spring Creek Centre County, PA

Slides:



Advertisements
Similar presentations
PHYSICS 1401 JEFFERY DING ALAN JONES
Advertisements

Physics of Bridges Mr. Hoa STEM 2014.
6 Structures © Goodheart-Willcox Co., Inc Permission granted to reproduce for educational use only.
Introduction to Structural Engineering
By : Prof.Dr.\Nabil Mahmoud
The Effect of Bridge Design on Weight Bearing Capacity
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
TODAY ADD LEGO rubric to end of your lab write-up for LEGO NXT
Let’s Learn About Bridges
Popsicle Bridges. The Challenge Attention aspiring engineers! The state of Michigan needs your help. The Mackinaw Bridge is beginning to deteriorate and.
Bridge Report By Jenny. Gina. Eunji. Matt Team 5.
Hawaii Section PGF 2014 STUDENT OUTREACH Popsicle Stick Bridge Competition September 22, 2014 Glenn Miyasato ASCE Hawaii Section.
There are more than 500,000 bridges in the United States!
Office of Highway Safety Bridge Load Rating Dan Walsh.
There are many types of bridges including:
Spaghetti Bridges The Pasta Sensations! Take a look at some designs…….
Bridge Design and Construction
BRIDGE AND ROV GROUP 4. Alex Paige Collin Palmer Sifat Syed Marc Hermann.
BRIDGE BUILDING.
World’s Tallest Tower Case Study #1 Northern Highlands Regional High School Applied Technology Department Real World Engineering List Design/Build Engineering.
MESA DAY BRIDGES. MESA BRIDGES Forces at Work Forces in a Bridge Building Better Bridges Rules Testing Procedures Materials Suppliers.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
I. Truss Bridge Gussets Background
HOORRRAAAAYYYYYY GOAL... ? FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...
1 Virtis/Opis Technical Update Virtis Opis BRIDGEWare Users Group Meeting 2010 Nashville, Tennessee.
Project Constraints Maximum Expected Traffic Load: 2 twenty-ton, 2-axle trucks per week Channel Size: app. 6 ft wide x 5.5 ft deep Available Reinforcement.
Tom Canfield Engineering Technologies and Design POE Medina County Career Center 1/3/2011.
BRIDGE BREAKDOWN: EVALUATING THE ARCOLA BRIDGE ANNA GEORGE GRADE 12 METHACTON HIGH SCHOOL 3 RD YEAR AT PJAS.
ENGR 211 Bridge Design Project
The four basic types of structures are :
Introduction to Towers. What is a tower? A man-made structure, higher than its diameter, generally used for observation, storage, or electronic transmission.
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Armadillo.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 The Bleeding.
bio- -mimicry A mass or weight supported by something.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Money.
Group members- Maria Reyes Cynthia Herrera Junior Guiterrez POPSICLE STICK BRIDGE TEAM BUILDING CHALLENGE (PHYSICS B PROJECT #1)
Bridge Building Challenge Materials: 24 ft. of 3/32” balsa wood and one bottle of Elmer’s glue, scissors NO OTHER MATERIALS MAY BE USED Specifications:
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
Structural Loads.
1 PennDOT Truss Gusset Plate Analysis and Ratings Spreadsheet Overview Karim Naji Assistant Structural Engineer FHWA PA Division
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 G4 Design.
Engineering Structures
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section Girls 1.
BRIDGES CAD 449. Design It is the essence of engineering! “… the process of devising a system, component or process to meet desired needs. It is a decision-making.
8 th Grade Applied Technology Mr. Giannone. In this unit we will study structures and the forces that affect them.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design: EDGSN 100 Section 002 Team Ultra-Truss.
Replacement of Vehicle Bridge over Spring Creek
Posting Bridges for Specialized Single-Unit Trucks
Replacement of Vehicle Bridge over Spring Creek
Design Project #1 Prof. Berezniak Presented to: Spring 2017
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek Centre County, PA
Replacement of Vehicle Bridge over Spring Creek
Tim Wyckoff David Cenidoza Sachin Narvekar Felix Liu Weston Wells
Ben, Jonathan, Mason, Kambriea Design Team 1
Replacement of Vehicle Bridge over Spring Creek
POPSICLE STICK BRIDGE PROJECT
Stick Together & Civil Structures
Rafael Moran San Diego State University MSP
Bridge Project: Team Truss-Arch
Introduction to Engineering Design
Bridge Report Team Total Domination. Bridge Report Team Total Domination.
Design Brief Liam and Dorsa.
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
Engineering Technology Program
Replacement of Vehicle Bridge over Spring Creek
Let’s Learn About Bridges
Presentation transcript:

Replacement of Vechicle Bridge over Spring Creek Centre County, PA Design Project #1 Replacement of Vechicle Bridge over Spring Creek Centre County, PA Introduction to Engneering Design EDGSN 100 Section #001 Team “Four Horsemen” Design Team 2 Jinzhen Hu Zixuan Feng Zeynep Okul Praakriti Bhatnagar Presented to: Prof. Berezniak 2017

Statement of the Problem A 100 year flood event destroyed the existing Bridge. The bridge is vital for providing access to the medical center for the regional residents. Two problems: Disruption of daily usage for the regional residents & Disruption of direct access of first-responder vehicles to the residents.

Project Objective PennDOT Engineering District 2-0 has implemented a fast-track project to expedite the design and building of a new vehicle bridge over Spring Creek.

Required Design Criteria The bridge will be built on standard abutments, and have no pier. It will have the ability to take the load of two AASHTO H20 - 44 trucks, one in each lane. It will be 20 meters above the ground, and the deck will span 40 meters across one end to the other. The deck will be 0.223 meters thick and be made of medium strength concrete as the preferred material.

The Technical Approach Phase 1: Economic Efficiency We used Engineering Encounters Bridge Design 2016 (EEBD 2016) for the estimation design. 1.The software applied a load to the bridge to determine if the design could withstand the expected load upon the bridge. 2.The software was able to display the estimated cost report, the load test results and showed bridge member details. This data was used to analyze the results and help to determine which bridge was the most structurally efficient.

The Technical Approach Phase 2: Structural Efficiency Prototype Warren and Howe truss bridges were constructed by each design team using a maximum of 60 Popsicle sticks, white elmer’s glue, and hot glue for the struts and floor beams. The constructed prototypes had the following dimensions: 13.5 inches in length, 4.5 inches in width, and 4 inches in height. Each prototype bridge was load tested using a suspended mass from the center of the prototype, and more mass was added until the stress was too great and the bridge failed.

The Results Phase 1: Economic Efficiency Final Cost of the Howe Truss Bridge Design : $ 234,909.66 Final Cost of the Warren Truss Bridge Design : $ 195,327.93

The Results Phase 2: Structural Efficiency Final Load Test of the Howe Bridge : 51 lb Actual Weight of the Howe Bridge : 0.181 lb Final Load Test of the Warren Bridge: 71 lb Actual Wight of the Wareen Bridge: 0.196 lb 281 361

The Best Solution $ 234,909.66 $ 195,327.93 281 361 Due to the significant differences between the structural efficiency and the economic efficiency, Warren Truss bridge should be the best solution of our design group.

Our Conclusions PennDOT Engineering District 2-0 has implemented a fast-track project to expedite the design and building of a new vehicle bridge over Spring Creek. Designing and building this new bridge over Spring Creek was important for the local residents of the area to have a direct route to Nittany Medical Center. Based on the results of structural efficiency and economic efficiency, the Warren Truss Bridge is the better option compared to a Howe Truss Bridge.

Our Recommendations The next step to complete the final bridge design is to put our design to action. The bridge should be built as soon as possible in order to benefit the local residents and resume usual traffic.

In Closing We would like to thank PennDOT 2-0 for sponsoring this project. Thank you for giving us this opportunity to design this bridge. Not only do bridges connect places, they connect people.