Towards Targeted Reliability Oceans 2025 Theme 8 WP8.4

Slides:



Advertisements
Similar presentations
COUNTER: improving usage statistics Peter Shepherd Director COUNTER December 2006.
Advertisements

1 Reducing Climate-Related Disasters and Adapting to Climate Change Meeting of European National Platforms and HFA Focal Points Paris,
Key Stage 3 National Strategy
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Medon Project Deliverables June Ocean Lab Exhibition.
The e-Science Institute Dr Anna Kenway, Deputy Director September 2005.
Curriculum Development on a Post-Graduate Certificate of Education Pam Thompson and Rachel Higdon De Montfort University
Integrated Design for Production to Ensure Sustainability in Marine Transportation Matthew J. Streeter- Faculty of Engineering and.
The Design Process, Evolution and Deployment of the Rapid-MOC Moorings in the Atlantic at 26.5ºN Darren Rayner and Rob McLachlan National Oceanography.
SeaCycler AST2 Surface Piercing Profiler Technology.
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
MANAGING PRESSURES IN AN ACUTE SETTING Grant Archibald Director Emergency Care & Medical Services 10 TH JUNE 2011.
USD – Computer for the Educator, Level II Ernie Lewis.
The Science Of Marine Biology
Reclaiming Social Work in Aberdeen
Flexible Assessment, Tools and Resources for PLAR Get Ready! Go! Presenter: Deb Blower, PLAR Facilitator Red River College of Applied Arts, Science and.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
National Seminar on Engineering Education February 25-26, 2005 I I Sc Bangalore M. Tech Programs - Curriculum and Related Issues Prof. M. C. Deo I I T.
Better risk management in support of regulatory quality Incorporating risk assessment tools in RIA to prepare better rules Charles-Henri Montin Senior.
Exploring Beneath an Antarctic Ice Shelf with the Autosub3 AUV Stephen McPhail, Maaten Furlong, Miles Pebody, James Perrett, Peter Stevenson, Andy Webb,
National Oceanography Centre, Southampton European Way, Southampton SO14 3ZH, UK Tel: National Marine Facilities Sea Systems.
MARINE STRATEGY FRAMEWORK DIRECTIVE (MSFD) STRUCTURE OF PRESENTATION Summary of MSFD Requirements; EU project management arrangements; Descriptors of most.
Tsunamis Detection The Mission  Tsunamis Detection can help to minimize loss of life and property from future tsunamis. Mission Introduction Mechanism.
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
Frequently Asked Questions (FAQ) prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9.
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
Opportunity Engineering Harry Larsen The Boeing Company SCEA 2000 Conference.
Annie Griffith December 2007 December 2007 Gemini OSU - UKLC Update.
Achieving Better Reliability With Software Reliability Engineering Russel D’Souza Russel D’Souza.
March 13, 2001CSci Clark University1 CSci 250 Software Design & Development Lecture #15 Tuesday, March 13, 2001.
Laboratory Data Integrity Ashraf Mozayani, PharmD, PhD Texas Southern University Barbara Jordan-Mickey Leland School of Public Affairs Forensic Science.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Marine Autonomous and Robotic Systems Facility at NOC 20 th March David White 20 th March
If you don’t know where you’re going, any road will take you there.
Framing an Issue Once you are aware that a problem exists, you can begin to analyze it. Issues share some basic characteristics.
S7: Audit Planning. Session Objectives To explain the need for planning To explain the need for planning To outline the essential elements of planning.
The role of gliders in sustained observations of the ocean Deliverable 4.1 or WP 4.
Audit Planning. Session Objectives To explain the need for planning To outline the essential elements of planning process To finalise the audit approach.
USRG meeting, University of Southampton, March 19th Alkali ne batteri es 60kW /hr The tracks of all of the 8 Autosub3 missions carried out.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
Introducing the most comprehensive ICT based self evaluation framework available. Designed around the section 5 Ofsted framework, the i-sef is a powerful.
Plymouth Health Community NICE Guidance Implementation Group Workshop Two: Debriding agents and specialist wound care clinics. Pressure ulcer risk assessment.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
From Strategy to Implementation: Implications for NREN Product Management. TNC 2005 Ann Harding HEAnet NOC Manager.
Developing online activities for postgraduate students in computing Centre for Open Learning of Mathematics, Science, Computing and Technology (COLMSCT)
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
Shaping a Health Statistics Vision for the 21 st Century 2002 NCHS Data Users Conference 16 July 2002 Daniel J. Friedman, PhD Massachusetts Department.
Science Team Objectives K. Jezek and J. Richter-Menge Science Team Co-leads.
ME 4054W: Design Projects RISK MANAGEMENT. 2 Lecture Topics What is risk? Types of risk Risk assessment and management techniques.
SAFETY MANAGEMENT SYSTEM IN TURKISH STATE RAILWAYS (TCDD)
IPY International Polar Year Progress report to STG 2.
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
Action planning and evaluation How to apply workshop learning and action points to deepen that learning further Identify and plan next steps for post-
SIO 218A Observational techniques in physical oceanography Goals/methods: Learn currently used methods and instruments Understand principles of observation/technique.
Failure Modes and Effects Analysis (FMEA)
Wet Demonstrator Objectives. 2 A Brief History Functional Requirements First DraftJuly 2014 Wet Demonstrator Scope First DraftJuly 2014 Singapore Workshop.
OPERATIONAL RELIABILITY WORKING GROUP
FMEA.
Failure mode and effect analysis
GE 6757 TOTAL QUALITY MANAGEMENT
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
Open access in REF – Planning Workshop
Exploring Beneath an Antarctic Ice Shelf with the Autosub3 AUV
Quality Risk Management ICH Q9 Frequently Asked Questions (FAQ)
Failure Mode and Effect Analysis
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
Review and comparison of the modeling approaches and risk analysis methods for complex ship system. Author: Sunil Basnet.
Date and venue: 23 September, MSFD PCG, DG Environment, Brussels
Presentation transcript:

Towards Targeted Reliability Oceans 2025 Theme 8 WP8.4 Gwyn Griffiths and Mario Brito National Oceanography Centre, Southampton 2008 Moorings Workshop Is there common ground between people working on moorings and those working on improving the reliability of Autonomous Underwater Vehicles?

Fimbul Ice Sheet, Antarctica Nick Millard

Inquiry following loss of Autosub2 “The Board has recognised the competence and commitment of the NOC AUV team; they have a high level of understanding of the importance of reliability and have employed sound reliability principles to influence their design decisions. However, they have not employed any formal systems reliability analysis methods. The Board believe this to be a major shortfall.”

Recommendations following loss of Autosub2 NERC (or representatives) should define risk acceptance criteria AUV development team should implement formal risk and reliability management systems AUV development team should provide evidence of reliability achievement Full report available: Strut, J. (editor), 2006. Report of the inquiry into the loss of Autosub2 under the Fimbulisen. NOCS Research and Consultancy Report: pdf at http://eprints.soton.ac.uk/41098/

Synopsis Introduction to Targeted Reliability in a marine science context Risk Management Process-AUV being used with Autosub Informing the process Detailed engineering and operational fault logs Engineering and statistical follow-up The use of Expert Judgement Moorings What might a Risk Management Process look like? Example issues

Risk Management Process-AUV Start e.g. P(loss)<20%

Campaign requirements, Dr Jenkins (BAS) for Pine Island Glacier, Antarctica Feb. 2009 60 km open water missions to 200, 600, 1000 m depths, close to ice front. 3 x 60 km sub-ice-shelf missions to 600 m depth, in outer half of cavity. 3 x 120 km sub-ice-shelf missions to 1000 m depth, to the "minimum headroom" limit of the cavity Minimum Desired Sea ice may well be present in the area, beneath which Autosub3 would need to travel to reach the ice front.

How might we predict probability of loss? * Part A - Gather fault history, document human error and all incidents with the AUV Part B - Set out the key features and risks of the operating environment We postulate that combining Parts A and B cannot be done through scientific methods. Addressing Part A alone has been controversial. * Estimated as cause of ~60% of US military UAV faults/incidents by Tvaryanas et al. (2005)

Part A: Example Autosub3 fault log entries

Autosub Engineering mitigation examples Replace wet-mateable connectors with penetrators - prior experience of intermittent connection under pressure. Autosub2 mission 313 Amundsen Sea

Part B. Eliciting Expert Judgement Set out the Issues Select the Experts Clearly Define the Issues Train the Experts Elicit the Judgements Analyze and Aggregate the Results Complete Analysis and Write-up Otway, H. and von Winterfeldt, D., 1992. Expert judgement in risk analysis and management: Process, context, and pitfalls. Risk Analysis, 12(1): 83–93.

EEJ example for the fault history of Autosub3 Ten AUV practitioners from Australia, Canada, USA from academia, research, commercial, military backgrounds. Given the set of facts on all faults and incidents with Autosub3 throughout its life to date we seek to predict the probability of loss of the vehicle in four operating environments: > Open water > Coastal > Sea ice present > Under an ice sheet In the course of evaluating each fault log entry, the expert is asked to assess the following question: “What is the probability of loss of the vehicle in the given environment X given fault/incident Y?”

Your estimates for Autosub3 Mission 384 Weights 1-5

Experts’ estimates for Autosub3 Mission 384 Weights 1-5

Cumulative frequency statistics Open Water Coastal Sea Ice Shelf Ice Upper Q. .026 .037 .17 .40 Median .018 .020 .088 Lower Q. .0085 .0083 .045 .072

Autosub Statistical (procedural) example Only two missions beyond 250km, one of which failed, hence large step. Operating procedure for under ice: Each mission has ‘open water’ 25km segment before committing under ice. Kaplan-Meier method for estimating probability of survival with distance for all Autosub3 missions to date. Prevalence of faults leading to ‘infant mortality’ using GG’s judgement.

Estimated probability of loss Minimum mission set, no sea ice in front of glacier P(loss) = 9% Minimum mission set + 30km of sea ice in front of glacier P(loss) = 16% Desired mission set with no sea ice in front of glacier P(loss) = 24% Desired mission set + 30km of sea ice in front of glacier P(loss) = 30% Based on Autosub3 history to end of March 2007. Will be updated after Terschelling June 2008 proving trials.

Risk and Reliability: A new service to the NERC marine science community Part of Oceans2025 Technology Work Package on Risk and Reliability Mario Brito - (awaiting) PhD in software reliability Access to engineering specialists in the Underwater Systems Lab. Early discussions on PAP mooring-related problems have already taken place. For no-fee consultations on risk and reliability issues for NERC marine science, contact either: Mario Brito (m.brito@noc.soton.ac.uk) or Gwyn Griffiths (gxg@noc.soton.ac.uk). http://www.noc.soton.ac.uk/OED/gxg/risk.html

Example - Flooded Glider, April 2008 Establish root cause of glider partially flooding with ~4 litres of water while on a tethered dockside post incident-free 3-month deployment. Depth 0 to 7 m 1 min Pressure reduction 9.5 to 6.0 in Hg

Systematic Fault Tree Analysis CTD Establish actual cause or assign probabilities. Do NOT jump to conclusions! Stern tube Leak ‘O’ rings Chance events Pressure port Ammonite flooded Vacuum plug Failure routes Pressure tubes separated Li battery vented Tie-rod cross threaded Pressure tubes not fully butted Tapered ring in wrong order

The root cause: Assembly error Courtesy Peter Stevenson For no-fee consultations on risk and reliability issues, contact either: Mario Brito (mpb2o07 @noc.soton.ac.uk) or Gwyn Griffiths (gxg@noc.soton.ac.uk).

Glass buoyancy failure: WHOI VEX Mooring Array in ca Glass buoyancy failure: WHOI VEX Mooring Array in ca. 5000m Western Atlantic. Where can I find quantitative: Failure rates? Any difference in failure rates between brands e.g. Benthos, Vitrovex? The major causes of failure? What’s worse and why, time at depth or depth cycling?

Acoustic release failure: WHOI VEX Mooring Array in ca Acoustic release failure: WHOI VEX Mooring Array in ca. 5000m Western Atlantic. Batch of EG&G releases had improperly machined release mechanisms. Below 2000m, compression was such that the mechanism would never release. Example of a common mode, human error. Recovery using Isis ROV, April 2003.

Work programme for 2008 Analyze and write up Autosub3 Expert Judgement Work with Autosub3 team on 2008 trials and risk management for 2009 Antarctic cruise How do we incorporate quantitatively sea ice and vessel characteristics? Paper for IPY Conference, St. Petersburg July 2008. Work with Autosub6000 team on Markov chain approach to stages of reliability and risk. The reliability of deep ocean glass spheres. Factors affecting the reliability of the PAP moorings Related to EuroSITES project and Oceans 2025 - propose to instrument a test mooring to establish in situ performance. Discuss way forward for interaction with Rapid-Watch with NERC/Coordinator/Scientists

Conclusions From open literature searches, AUV community lags the UAV community in analysis of incident and fault data. We should be more proactive, e.g. use of wikis, blogs, list servers … Recording fault and incident data, and sharing outcomes is important for the community as a whole Controversy still surrounds attempts to model statistically AUV faults, and more so, and the use of expert judgement to estimate probability of loss from fault history. We need to do more to engage with ocean engineers working on moorings, landers etc.