WP Coordinaten XFEL RF Operation XFEL WP1 HIGH LEVEL RF requirements, operational interfaces, Installation & commissioning How to edit the title slide Upper area: Title of your talk, max. 2 rows of the defined size (55 pt) Lower area (subtitle): Conference/meeting/workshop, location, date, your name and affiliation, max. 4 rows of the defined size (32 pt) Change the partner logos or add others in the last row.
The High Power RF System for XFEL Injector Tunnel Modulator Hall Outline The High Power RF System for XFEL Injector Tunnel Modulator Hall Installation Commissioning Requirements Conclusion Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
The High Power RF for XFEL 25 RF Stations in the accelerator Linac L1...L3 2 (4) RF Stations in the Injector Building One RF Station consists of MBK with Connection Module Pulse Transformer, Electronic Rack Waveguide Distribution Water Distribution Modulator (in the Modulator Hall XHM) Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
The High Power RF for XFEL / Injector (XTIN) Two injectors 6. and 7. floor (at the beginning 7. Floor) Each injector requires two RF Stations ( Gun and 1. Module) The High Level RF is located on the 3. Floor (four Stations, at the beginning two) Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
The High Power RF for XFEL / Injector (XTIN) RF Stations in the Injector building Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
The High Power RF for XFEL / XTL RF Station in the XTL Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
The High Power RF for XFEL / XTL Complete section of one RF station (XTL/L1) Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
The High Power RF for XFEL / XHM Modulators in the XHM Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
The other RF components will be tested and stored before installation Modulators will be installed directly in the Modulator Mall after delivery The other RF components will be tested and stored before installation All klystrons will be tested on the klystron test stand Hall 2 Some of the pulse transformers will be tested in Hall 2 Wave guides will be tested and assembled in the WATF Cryo modules will be completed with the WG structure and the cabling before installation in the XFEL Racks will be assembled in HERA Hall West and tested in Hall 2 Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
Installation / Time Schedule Modulators will be delivered and installed directly to the Modulator Hall (September 2012 - April 2014). Injector Installation form February 2013 to Mai 2013 XTL Installation from May 2013 to March 2015 One RF Station per month Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
Commisioning Modulator Hall XHM Modulators will be tested on loads before connecting to the pulse transformers (MKK) Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
Klystron needs immediately high voltage for the ion pumps Commisioning Injector and XTL After completing a RF Station commissioning of this station can be done Klystron needs immediately high voltage for the ion pumps Klystron RF output will be connected to loads Test of auxiliaries, interlocks, cabling etc. Switch on filament Test with high voltage pulse Test with RF pulse Commissioning with a shift crew in the evening or at night Warning lamps during high voltage and RF Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
Cooling water for the klystrons, loads etc. Requirements Modulator Cooling water for the klystrons, loads etc. Cooling water (20 deg.) for the cooling units in the racks Electrical power Ethernet Software Master Oscillator with a timing System Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1
The infrastructure is complete available Conclusion After a complete installation of a RF High Power Station the commissioning of this station can be done if: The infrastructure is complete available There is no conflict with other business in the LINAC The safety is guarantied Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1