WP Coordinaten XFEL RF Operation

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
[Presentation Title] – Edit this footer by clicking on “View” tab,  “Slide Master” button  this slide’s layout [Date] Changing... Leading... Learning...
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
Wendy Balmer Indiana Uni Template 1.
Indiana U Wendy Lynn Balmer Ex 1.
Areal RF Station A. Vardanyan
MicroTCA Development and Status
Strategy and Status of Reference Cavities for European XFEL
First operation of the XFEL linac with the 2K cryogenic system
Serial testing of XFEL cryomodules: results of the cryogenic heat load measurements  T Böckmann1, Y Bozhko1, W Gay2, P Halczynski2, B Petersen1, S Putselyk3,
Bernd Steffen, DESY
Preparation for DESY Meeting
Power Couplers, HOM Couplers and Tuners for the XFEL
First and Last Name Title of Presentation Place, Date
TESLA Type Cavity HOM Coupler Multipacting
WP-X XFEL Project Progress Report (2016-3)
(Selected) Project Management Processes at the XFEL
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
E-XFEL Status and First Beam Results
ICEC/IMC 2016 Sergiy Putselyk DESY MKS
WP-X XFEL Project Progress Report (2014-3)
Hosting Orsay Walid KAABI
352MHz Klystron Control for the 3MeV Linac test stand
XFEL Vacuum System Commissioning
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Biology at Advanced Laser Light Sources
WP02 PRR: Master Oscillator and RF Reference Distribution
Racks Coordination 09 September 2011 E. Negodin
WP02 PRR: Master Oscillator and RF Reference Distribution
Rihua Zeng RF Group, Accelerator Division, ESS ERIC Oct 29, 2015
Racks Coordination 16 September 2011 E. Negodin
09 Juni 2015 L1 Inbetriebnahme Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide.
High speed LWL connections for WP02
for X-ray Optics and Beam Transport
Findings in RF Power Couplers after operation on cavities in PXFEL2
Accelerator Module Test Facility
Commissioning and First Cooldown of XFEL Linac
WP02 PRR: Master Oscillator and RF Reference Distribution
LLRF Functionality Stefan Simrock How to edit the title slide
MS Project Web Access to WP Plan
WP02 PRR: Master Oscillator and RF Reference Distribution
Installation XFEL Tunnel WP 34
XFEL Cryo Operation DESY Betriebsseminar Grömitz
Markus Hüning 3rd XFEL Collaboration Meeting
Link Diagnostic Electronics
Yuhui Li How to edit the title slide
How to edit the title slide
presented by Elmar Vogel
LLRF and Beam-based Longitudinal Feedback Readiness
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
Hard X-ray self-seeding for XFELs: towards coherent FEL pulses
Denis Kostin, MHF-SL, DESY.
Cryomodule Performance in FLASH and XFEL
TTC Meeting, July , Saclay, France.
RF introduction Anders Sunesson RF group leader
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

WP Coordinaten XFEL RF Operation XFEL WP1 HIGH LEVEL RF requirements, operational interfaces, Installation & commissioning How to edit the title slide Upper area: Title of your talk, max. 2 rows of the defined size (55 pt) Lower area (subtitle): Conference/meeting/workshop, location, date, your name and affiliation, max. 4 rows of the defined size (32 pt) Change the partner logos or add others in the last row.

The High Power RF System for XFEL Injector Tunnel Modulator Hall Outline The High Power RF System for XFEL Injector Tunnel Modulator Hall Installation Commissioning Requirements Conclusion Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

The High Power RF for XFEL 25 RF Stations in the accelerator Linac L1...L3 2 (4) RF Stations in the Injector Building One RF Station consists of MBK with Connection Module Pulse Transformer, Electronic Rack Waveguide Distribution Water Distribution Modulator (in the Modulator Hall XHM) Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

The High Power RF for XFEL / Injector (XTIN) Two injectors 6. and 7. floor (at the beginning 7. Floor) Each injector requires two RF Stations ( Gun and 1. Module) The High Level RF is located on the 3. Floor (four Stations, at the beginning two) Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

The High Power RF for XFEL / Injector (XTIN) RF Stations in the Injector building Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

The High Power RF for XFEL / XTL RF Station in the XTL Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

The High Power RF for XFEL / XTL Complete section of one RF station (XTL/L1) Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

The High Power RF for XFEL / XHM Modulators in the XHM Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

The other RF components will be tested and stored before installation Modulators will be installed directly in the Modulator Mall after delivery The other RF components will be tested and stored before installation All klystrons will be tested on the klystron test stand Hall 2 Some of the pulse transformers will be tested in Hall 2 Wave guides will be tested and assembled in the WATF Cryo modules will be completed with the WG structure and the cabling before installation in the XFEL Racks will be assembled in HERA Hall West and tested in Hall 2 Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

Installation / Time Schedule Modulators will be delivered and installed directly to the Modulator Hall (September 2012 - April 2014). Injector Installation form February 2013 to Mai 2013 XTL Installation from May 2013 to March 2015 One RF Station per month Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

Commisioning Modulator Hall XHM Modulators will be tested on loads before connecting to the pulse transformers (MKK) Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

Klystron needs immediately high voltage for the ion pumps Commisioning Injector and XTL After completing a RF Station commissioning of this station can be done Klystron needs immediately high voltage for the ion pumps Klystron RF output will be connected to loads Test of auxiliaries, interlocks, cabling etc. Switch on filament Test with high voltage pulse Test with RF pulse Commissioning with a shift crew in the evening or at night Warning lamps during high voltage and RF Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

Cooling water for the klystrons, loads etc. Requirements Modulator Cooling water for the klystrons, loads etc. Cooling water (20 deg.) for the cooling units in the racks Electrical power Ethernet Software Master Oscillator with a timing System Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1

The infrastructure is complete available Conclusion After a complete installation of a RF High Power Station the commissioning of this station can be done if: The infrastructure is complete available There is no conflict with other business in the LINAC The safety is guarantied Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 01.12.2011, DESY Richard Wagner, MHFp, WP1