Materiel Development Decision (MDD) to Milestone A (MS A)

Slides:



Advertisements
Similar presentations
C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
Advertisements

MODIFICATION 5/ N N Y PROGRAM TO BE MODIFIED STILL IN PRODUCTION 6/ Y SEPARATE ACQUISITION EFFORT 5/ N TOTAL COST OF MODIFICATION >= MAIS or MDAP 5/, 8/
NDIA 15 th Annual SE Conference October 2012 | Page-1 Distribution Statement A – Approved for public release by OSR on 10/09/2012, SR Case # 13-S-0078.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
1 Incremental Commitment Model as Applied to DoD Acquisition Insights from a Business Process Model of DoD Acquisition Policy and SE Guidance Dr. Judith.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
CLR 252 Developing KPPs Note from SME:
Systems Engineering and Parts Management
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Joint Capabilities Integration and Development System (JCIDS) Nov 2010
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
Business, Cost Estimating & Financial Management Considerations
PRODUCTION/ DEPLOYMENT
Presidential Direction
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Today’s Summary Tab 4 Tab 6 Tab 2 Tabs 3 and 5 Defense Acquisition
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
DT&E Strategy and the Developmental Evaluation Framework (DEF) Concept & Program Implementation 5 June 2014.
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
Requirements Management Certification Training Mandate
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
DAE CAE PEO PM OIPT Acquisition Category (FY14 $) ACAT ID
Milestone A to Milestone B Requirements Management Activities
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
JTAMS MILESTONE A ANALYSIS
Milestone A to Milestone B Requirements Management Activities
Cumulative IOT&E Results Through FY 2008
New Space Systems Acquisition Policy
ISA 201 Intermediate Information Systems Acquisition
DoDI Approved 8 December 2008
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
Product Support Considerations
The Department of Defense Acquisition Process
Presentation transcript:

Materiel Development Decision (MDD) to Milestone A (MS A) Tom Fritz thomas.fritz@dau.mil 703 805 4583

Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis (MSA) phase Explain the inputs to a Materiel Development Decision (MDD) Explain the outputs from MDD -- decisions and approvals Summarize the purpose and major activities that take place during the Materiel Solutions Analysis (MSA) phase and the links between those activities Explain the Milestone A decisions and approvals

Materiel Development Decision (MDD) Full Rate Prod Decision Review Joint Concepts Capabilities - Based Assessment MS C MS B President SECDEF CJCS CCMDs and other DoD Components Strategic Guidance Incremental Development MS A Technology Development Engineering & Manufacturing Development Production & Deployment Materiel Solution Analysis Technology Opportunities & Resources ICD O&S User Needs MDD CDD CPD Post CDR Assessment Pre-EMD Review Draft AoA review and Portfolio Assessment AoA report PDR review MDD is mandatory for all programs. For DAB oversight programs (ACAT 1D, ACAT 1AM, and selected): Joint Staff presents JROC Recommendations DoD Component presents the ICD, including: Preliminary CONOPS Description of Needed Capability Operational Risk Basis for determining that non-materiel approaches will not sufficiently mitigate capability gap How is MDD conducted for Service and Agency programs – IC, II, III ..?

Materiel Development Decision (MDD) Inputs and Outputs Full Rate Prod Decision Review Joint Concepts Capabilities - Based Assessment MS C MS B President SECDEF CJCS CCMDs and other DoD Components Strategic Guidance Incremental Development MS A Technology Development Engineering & Manufacturing Development Production & Deployment Materiel Solution Analysis Technology Opportunities & Resources ICD O&S User Needs MDD CDD CPD Post CDR Assessment Pre-EMD Review Draft AoA review and Portfolio Assessment AoA report PDR review Outputs: Approval to enter the acquisition process Acquisition Decision Memorandum Identifies acquisition phase of entry and initial review milestone Designates lead DoD Component Directs initiation of AoA Milestone Decision Authority (link) Inputs: Initial Capabilities Document (ICD) Approved AoA Study Guidance & AoA Study Plan (DAU Guidebook and AT&L memo Apr 2010) Evidence IAW DTM 10-017

DTM 10-017 - Development Planning to Inform MDD Reviews and Support AoAs Components shall provide evidence at the MDD Review that will facilitate the Milestone Decision Authority (MDA) determination that: Candidate materiel solution approaches have potential to effectively address capability gap(s), desired operational attributes, and associated dependencies Range of technically feasible solutions exist – generated from across the entire solution space, as demonstrated by early prototypes, models, or data Consideration has been given to near-term opportunities to provide a rapid interim response Plan to staff and fund analytic, engineering, and programmatic activities supports the proposed milestone entry requirements DTM 10-017, September 13, 2010 extended to 12/31/2012

Pre-MDD Activities - Summary ICD validated (approved for entry into KM/DS, assigned a Joint Staffing Designator (JSD), staffed, reviewed, certifications approved, and validated at JSD level) ICD recommends type of materiel approach(es) preferred Analysis of Alternatives (AoA) AoA Study Guidance & AoA Study Plan approved prior to MDD Sponsor works with Director, Cost Assessment and Program Evaluation (DCAPE) on AoA Study Guidance & AoA Study Plan (JROC Interest programs only – Component process for others) Sponsor works with MDA’s staff to ensure other additional information is provided to enable the desired MDD outcomes in the MDD ADM

MDD to Milestone A Materiel Solution Analysis Full Rate Prod Decision Review Joint Concepts Capabilities - Based Assessment MS C MS B President SECDEF CJCS CCMDs and other DoD Components Strategic Guidance Incremental Development MS A Technology Development Engineering & Manufacturing Development Production & Deployment Materiel Solution Analysis Technology Opportunities & Resources ICD O&S User Needs MDD CDD CPD Post CDR Assessment Pre-EMD Review Draft AoA review and Portfolio Assessment AoA report PDR review

MDD to Milestone A Requirements Management Activities Materiel Solution Analysis (DoDI 5000 Link) Materiel Development Decision A ICD Contract(s) A AoA Report Contract B Final RFP Tech Dvlp Phase Contract C Draft CDD ASR ASR – Alternative Systems Review Purpose: Assess potential materiel solutions Major Activity: AoA Requirements Management Activities Apply ICD and supporting analysis to guide: Conduct of AoA (sponsor supports AoA Report briefing for FCB) Writing of : Test & Evaluation Strategy (TES), Technology Development Strategy (TDS) , System Engineering Plan Initial estimates for: Affordability Targets, Cost, and PPBE documents Develop: Draft CDD – “required” to support MS A and TD phase but not submitted to JCIDS for validation – content may be defined in JCIDS update Reliability, Availability, Maintainability Cost Rational (RAM-C) Report (linked to Draft CDD and referenced in validated CDD)

Reliability Analysis, Planning, Tracking, and Reporting Program Managers (PMs) shall formulate a comprehensive reliability and maintainability (R&M) program with reliability growth strategy as an integral part of the systems engineering process For JROC Interest programs (except Information Systems) Component develops initial RAM-C Report as part of the AoA process. Attached to the Systems Engineering Plan (SEP) for MS A, updated for MS B and MS C PM develops reliability growth curves (RGS) for SEP at MS A, updated in the TEMP beginning at MS B. Programs other than JROC Interest develop RAM-C Reports as determined by DoD Component or PM See, DoD Reliability, Availability, Maintainability, and Cost Rationale Report Manual, June 1, 2009 and AT&L DTM 11-003 RAM-C Report Executive Summary attached to (or Referenced in) CDD & CPD

MDA approves: (usually contained in a single ADM) Milestone A MDA approves: (usually contained in a single ADM) Materiel solution Affordability Targets (per DAB Templates for Milestones A, B and C) Technology Development Strategy (TDS), DAG 2.2 Release of final RFP and source selection for TD phase. Exit criteria for next phase - Technology Development Milestone A Certification, Title 10 section 2366a Tailored guidance to complete Materiel Solution Analysis activities or structure TD activities Full Funding defined with MS B Notes: A favorable Milestone A decision does not mean a new acquisition program has been initiated. Exception - ship building programs may be initiated at Milestone A. MAIS programs begin tracking funds first obligated. 2366a includes 25% cost increase / schedule delay notification for certified MDAPs.

ACAT I Program Certification for MS A WSARA 2009 & NDAA 2012 Revisions MEMORANDUM FOR THE RECORD SUBJECT: Milestone A Program Certification As required by Section 2366a of Title 10, United States Code, I have consulted with the Joint Requirements Oversight Council (JROC) on matters related to program requirements and military needs for the (name of program) and certify that: (1) the program fulfills an approved initial capabilities document; (2) the program is being executed by an entity with a relevant core competency function as identified by the Secretary of Defense; (3) [include only if the system duplicates a capability already provided by an existing system] the duplication of capability provided by this system is necessary and appropriate. (4) That a determination of applicability of core depot-level maintenance and repair capabilities requirements has been made; (5) an analysis of alternatives has been performed consistent with the study guidance developed by the Director of Cost Assessment and Program Evaluation; (6) a cost estimate for the program has been submitted, with the concurrence of the Director of Cost Assessment and Program Evaluation, and the level of resources required to develop, procure, and sustain the program is consistent with the priority level assigned by the JROC; and, WSARA Changes highlighted in bold red; NDAA 2012 changes in bold blue italics

AoA Plan AoA and AoA report Linkage: ICD, AoA, draft CDD, & Contract for Technology Development (TD) Strategic Direction Joint Operations Concepts CONOPS Feedback from field Cost Estimate & $$ TD CBA Capability attributes AoA Plan MOEs/ MOPs Preliminary SPECIFICATIONS to support RFP for TD Phase prototyping KPPs/ KSAs Materiel Solution Analysis Phase Materiel Development Decision Draft CDD ICD Milestone A Contract AoA and AoA report Test & Evaluation Strategy (TES) Technology Development Strategy (TDS) System Engineering Plan Contract A Final RFP for TD Phase 11

Back Up Information

Oversight & Review DAE CAE PEO IPT’s assist in oversight & review DAB USD(AT&L) Defense Acquisition Executive Acquisition Category DAE Makes Decisions Signs ADM ACAT ID DAB-Defense Acquisition Board ITAB-Information Technology Acquisition Board $365M RDT&E or $2.19B Procurement (FY2000 Constant $) DAB ITAB ACAT IAM $378M Life Cycle Cost or $126M Total Prog. Cost or $32M Prog. Cost in any single year (FY2000 Constant $) OIPTs Overarching IPT’s (OIPT’s) Issue resolution Component Acquisition Executive (Asst Secretary) ACAT IC/IAC Configuration Steering Boards Makes ACAT IC, IAC & II Decisions Signs ADM CAE ACAT II Working-Level IPT’s (WIPT’s) $140M RDT&E or $660M Procurement (FY2000 Constant $) Component HQ Review Issue resolution Program Level IPT’s Program Executive Officer (General Officer/SES Civilian) ACAT III PEO Makes ACAT III/IV Decisions Signs ADM No Fiscal Criteria IPT’s assist in oversight & review Program Manager (Col/LtCol/Civilian Equivalent) ACAT IV PM Navy USMC Return Note: Some PMs report directly to CAE.

Technical Reviews for RMs, Drawn from DAG Chapter 4.2.8 thru 4.2.17