DR Under FCM – Update Metering Configurations – Summary Registration Timeline and Examples FCM DR Asset Data Conversion Update Lemuel Gonzalez, Manager.

Slides:



Advertisements
Similar presentations
1 IDX. 2 What you will learn: What IDX is Why its important How to use it Tips and tricks Introduction Q & A.
Advertisements

Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Slide 1 FastFacts Feature Presentation March 11th, 2008 We are using audio during this session, so please dial in to our conference line… Phone number:
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
UNITED NATIONS Shipment Details Report – January 2006.
ISO New England Demand Resource Measurement & Verification Standards Manual Overview April 11, 2007 NAESB Development of DSM/EE Business Practices Washington,
REQ Enrollment in Demand Response Programs Process Flow Engineering Firm Retail Customer Demand Response Service Provider (DRSP) Distribution Company.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Notification of Digital requirements for the Draft Plan – Damascus, August Regional Information Meeting and Workshop related to the RRC-06.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
Addition Facts
ZMQS ZMQS
Grants 3.0 Departmental Administrator Review January 22, 2014.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
1 NatQuery 3/05 An End-User Perspective On Using NatQuery To Extract Data From ADABAS Presented by Treehouse Software, Inc.
Integrify 5.0 Tutorial : Creating a New Process
Presenter:Dr. Maureen White Developer: Dr. Chuck Wiseley 12/9/10 1.
1 SLIDE Insurance Company Regulation Division Insurance Market Regulation Division Medical Professional Liability Insurance Claim Reports Online Claim.
Using Family Connection Online Resource for Planning & Advising.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
How To Use Google Forms to Create A Test Quick Easy Self-Graded!! Instant Reports.
Page 1 of 30 To the Create Assignment Request Online Training Course An assignment request is created by an assignor to initiate the electronic assignment.
ABC Technology Project
Summary of Proposed Market Rules For Transition Period Price-Responsive Demand and Active Demand Resources in the Forward Capacity Market Henry Yoshimura,
AEMCPAGE Relaunch 1 June 2009.
1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
“The Honeywell Web-based Corrective Action Solution”
ECATS RCCA CAMP PROCESS ENHANCEMENTS
1 ITSS This overview deck contains two sections. Please use the links below to navigate –How to Register for ITSS Application AccessHow to Register for.
1Office for the Coordination of Humanitarian Affairs (OCHA) CAP (Consolidated Appeal Process) Section Online Project System (OPS) for Consolidated / Flash.
VOORBLAD.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
New England Developments in Demand Response and Smart Grid 2010 National Town Meeting on Demand Response and Smart Grid Henry Yoshimura, Director, Demand.
Services Course Outlook Live Participant Guide.
© 2010 Cisco and/or its affiliates. All rights reserved.Presentation_IDCisco Confidential CISCO LEARNING CREDITS MANAGEMENT TOOL CLP ADMINISTRATOR – USER.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Squares and Square Root WALK. Solve each problem REVIEW:
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
August 2005HP Restricted 1 Tier-2 Partner Order Lifecycle.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
SEPTEMBER 12, 2012 | MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Hourly Offer and Intraday.
Addition 1’s to 20.
25 seconds left…...
School Census Summer 2010 Headlines 1 Jim Haywood Product Manager for Statutory Returns Version 1.0.
Week 1.
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
Sedex: Registration and Account Set Up Instructions
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
We will resume in: 25 Minutes.
How to Fill out a PAR for a New Standard Revised 8 July 2010.
Calendario 2008 MON TUE WED THU FRI SAT SUN January.
How Cells Obtain Energy from Food
Section 1: Process to create EAS Interface File  DoD Batch and Timecard Status Report  DoD Employee Missing Payroll Data Report  Distribute Labor Cost.
2014 Medicare Enrollment Applications Agent Guide to Changes and Notes from Enrollment.
Windfall Web Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
12-CRS-0106 REVISED 8 FEB 2013 PRESENTS Payment Functionality.
Presentation transcript:

DR Under FCM – Update Metering Configurations – Summary Registration Timeline and Examples FCM DR Asset Data Conversion Update Lemuel Gonzalez, Manager Lindsay Perry, Associate Analyst Resource Registration & Performance Auditing DRITWG | January 12, 2010

FCM DR Metering Configurations - Summary Asset Registration Timelines FCM DR Asset Data Conversion Update Agenda 2 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

FCM DR Metering Configurations 3 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

Metering Configurations were discussed in more detail at the January 6, 2010 DRWG meeting. The presentation is available at: – ne.com/committees/comm_wkgrps/mrkts_comm/dr_wkgrp/mtrls/ 2010/jan62010/drwg_ms_ ppthttp:// ne.com/committees/comm_wkgrps/mrkts_comm/dr_wkgrp/mtrls/ 2010/jan62010/drwg_ms_ ppt Today’s presentation covers the over all object/data model overview and a summary of the metering configurations Metering Configurations DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 4

Terms Used In This Presentation CFE –Communication Front End (ISO side, servers that support the communication with Market Participants, or their agents) Customer Baseline (CB) –An estimate of an Asset’s electricity consumption had it not responded to a RTDR or RTEG event. DDE –Demand Designated Entity DG Output (DG) –The metered output of a Distributed Generator less any parasitic loads. Facility –A location where service is provided to an end-use metered customer. Facility Metered Load (FML) –Electricity consumed at a Facility that is purchased from the grid. 5 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

Terms Used In This Presentation DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 6 Hourly Reduction (HR) –The reduction in the Asset’s electricity consumption resulting from responding to a RTDR or RTEG event, or in the case of passive assets the average demand reduction across the performance/event hours. Metering Configuration (MC) RTDR / RTEG Asset –One or more measures/facilities located at a single PNode, reporting data as a single set of values and assigned a unique Asset ID by the ISO RTU –Remote Terminal Unit (field devices owned by the Market Participants or DDE that communicate with the CFE system servers) Total Facility Load (TFL) –Total Facility Load is the total electricity consumed at a facility inclusive of that purchased from the grid and that produced on-site from a Distributed Generator. TFL = FML + DG

Demand Resources Hierarchy Overview 7 Facilities Jim’s Laundry Mary’s Widgets Fred’s Salvage ABC Supply Measures RTDR Measure 1 RTDR Measure 2 RTDR Measure 3 RTEG Measure 1 RTEG Measure 2 RTEG Measure 3 Assets Asset 1 RTDR Asset 5 RTEG Demand Resources DR A RTDR Asset 4 RTEG Asset 3 RTEG Asset 2 RTDR DR B RTEG DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

ISO Uses Reported Data As Follows: Ref No Metering Configuration Applicable DR Types Participant Reports: Hourly Reduction Logic CB Based On: 1 DG Output Directly Metered RTDR, RTEG, OP, SP DG & FML (if pushback possible) HR = DGNo CB 2 Load Reduction - No DG at the Asset RTDRFMLHR = CB - FMLFML 3 DG Used to Reduce Load at the Asset RTEGFMLHR = CB - FMLFML 4 Load Reduction - DG Used to Reduce Load at Another On-Site Asset RTDRDG & FMLHR = CB - TFLTFL 5 DG Used to Reduce Load at the Asset - DG at Another On-Site Asset RTEGDG & FMLHR = CB - TFLTFL 6 Load Reduction Pursuant to M&V Plan OP, SP monthly performance values HR = avg MPV across performance hours No CB Certain RTDR reduction reported as if it were generation HR = DGNo CB Metering Configuration - Summary DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 8

Asset Registration Timelines 9 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

Inform Lead Market Participants and DDEs of the proposed timelines As the timelines will display: –The Lead Market Participants need time to submit the registrations –The ISO needs time to review new registration and changes –The DDE needs time to accommodate changes to the communication model each month to reflect registration changes Purpose for discussing the timelines DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 10

Measure State Chart 11 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England ISO

Asset State Chart 12 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England All measures under an asset must be approved before an asset can be “Ready to Respond.” Note: Meter Installed & Operational (MIO), and a CB built when needed, need to be satisfied prior to R2R. ISO LP ISO LP ISO LP (MIO)

Asset Registration Timeline New Assets: –Must allow the ISO 7 full business days to review submittal, as is the practice today (though in practice our turnaround is quicker) –Must be approved, and have a baseline built when needed, before the data snapshot is taken to construct the communication model Baseline Data –Window for submitting data starts as early as five business days prior to the registration submittal (CB needed by T-8, e.g., 8/24/2010) 8/31/2010 (Tue)8/1/2010 (Sun) 8/10/2010 (Tue): New Asset Submitted to CAMS 8/25/2010 (Wed) 0:00 (T-7): Final snapshot of Data Model Taken 8/15/2010 (Sun): Deadline to Submit New Assets for 9/1/2010, submittals beyond this date are not guaranteed to be ready for 9/1/2010 8/3/2010 (Tue) – 8/23/2010 (Mon): Window to submit baseline data with a requested operational date of 9/1/ DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

Registration Timeline Examples 8/31/2010 (Tue)8/1/2010 (Sun) 8/25/2010 (Wed) 0:00 (T-7): Final snapshot of Data Model Taken 8/9/2010 (Mon) – 8/13/2010 (Fri): Current Baseline Data Submitted 8/14/2010 (Sat): New Asset Submitted to CAMS 8/25/2010 (Wed) 0:00 (T-7): Final snapshot of Data Model Taken 8/9/2010 (Mon) – 8/13/2010 (Fri): Historical Baseline Data Submitted Preferred Timeline “Last Minute” Timeline 8/24/2010 (Mon): Asset Approved By ISO 8/15/2010 (Sun): Deadline to Submit New Assets for 9/1/ DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 8/31/2010 (Tue)8/1/2010 (Sun) 8/9/2010 (Mon): New Asset Submitted to CAMS 8/14/2010 0:00 (Sat): Baseline Built 8/17/2010 (Tue): Asset Approved by ISO 8/15/2010 (Sun): Deadline to Submit New Assets for 9/1/2010 8/15/2010 (Sun): Baseline Built

Registration Timeline Examples (cont.) 8/23/2010 (Mon): New Asset Submitted to CAMS Late Timeline In this example, the ISO is given less than two business days to review the asset in order for it to be R2R by 9/1/2010. Asset’s ready to respond date will be postponed until 10/1/2010 since the asset was approved on 8/27/ DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 8/25/2010 (Wed) 0:00 (T-7): Final Cut of Data Model Taken 8/16/2010 (Mon) – 8/20/2010 (Fri): Historical Baseline Data Submitted 8/27/2010 (Tue): Asset Approved By ISO 8/31/2010 (Tue)8/1/2010 (Sun) 8/16/2010 (Mon): Deadline to Submit New Assets for 9/1/2010 8/24/2010 (Tue): Baseline Built

Forward Capacity Market DR Asset Data Conversion Update 16 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

Administrative Reminder All forms have been sent. Forms are due back to ISO Customer Support from EPs by January 31, Follow up questions regarding the form may be directed to ISO Customer Support. ISO Customer Support contact information is as follows: – EPs unable to provide required information in a timely manner risk delaying conversion of their LRP assets for the start of the first Capacity Commitment Period on June 1, DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 17

Timeline Reminder (Continued) Dec 9, 2010: Demand Asset data conversion form distributed Current CAMS CAMS under FCM TBD: CAMS under FCM deployed – Current CAMS may be used for registration for Transition Period months June 1, 2010: First FCM Commitment Period begins – current CAMS becomes “read- only” Jan 31, 2010: Demand Asset data conversion form due ABC DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 18

19 Timeline (Continued) Before form is returned to the ISO (A) Between form returned and deployment CAMS under FCM (B) Once CAMS under FCM is deployed (C) Make updates to existing LRP assets for FCM Update XLS Form, and CAMS also if it applies to the Transition Period. ISO Customer Support with the request (HEAT ticket). For extensive revisions, submit request to ISO for an updated XLS. Update CAMS if it also applies to the Transition Period. TP-only Assets: Current CAMS may be used. FCM –only Assets: Use CAMS under FCM. Both: May need to update both systems. Register New Asset (incl. un- retiring) for Transition Period Continue to use Current CAMS, plus fill out the revised Additional Information sheet and to ISO Customer Support. Note: FCM related fields are only needed for LRP assets you want the ISO to cutover to FCM. Current CAMS may be used for Transition Period only. Register New FCM Assets Continue to use Current CAMS, plus fill out the revised Additional Info. sheet and ISO CS. Use CAMS under FCM. Where to register new assets and edit asset data DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

MW Allowed to Be Pushed Back field on the “Passive Assets” tab of the form is missing. Please put this value in the Notes/Comments field. If an asset’s DR Type is “RTDR” and the Reduction Method is “Start Generation” the form gives you three options for the Metering Configuration field. The ONLY valid option for this combination is “DG Output Directly Metered.” Please disregard the other options. MCs with “DG” in their names still apply to RTEG assets. EGs are Distributed Generation. Corrections and General Comments DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 20

Please review the January 6, 2010 presentation if you are interested in more detail regarding commonly asked questions on the asset cutover effort. The presentation is available at: – ne.com/committees/comm_wkgrps/mrkts_comm/dr_wkgrp/mtrls/ 2010/jan62010/drwg_ms_ ppthttp:// ne.com/committees/comm_wkgrps/mrkts_comm/dr_wkgrp/mtrls/ 2010/jan62010/drwg_ms_ ppt For more on commonly asked questions DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 21

22 Questions DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

SundayMondayTuesdayWednesdayThursdayFridaySaturday August 2010 For reference to use with the registration timelines 23 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England