ECEN 460 Power System Operation and Control

Slides:



Advertisements
Similar presentations
Announcements Homework 6 is due on Thursday (Oct 18)
Advertisements

EE 369 POWER SYSTEM ANALYSIS
Announcements Be reading Chapter 6, also Chapter 2.4 (Network Equations). HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6 but does not need.
ECE 333 Renewable Energy Systems Lecture 14: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 333 Renewable Energy Systems Lecture 13: Per Unit, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
I/O Curve The IO curve plots fuel input (in MBtu/hr) versus net MW output.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
EE 369 POWER SYSTEM ANALYSIS
Lecture 16 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Announcements Be reading Chapter 7
Lecture 5 Power System Operation, Transmission Lines Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
EE 369 POWER SYSTEM ANALYSIS
EE 369 POWER SYSTEM ANALYSIS
ECE 476 Power System Analysis Lecture 6: Power System Operations, Transmission Line Parameters Prof. Tom Overbye Dept. of Electrical and Computer Engineering.
Announcements Homework 7 is 6.46, 6.49, 6.52, 11.19, 11.21, 11.27; due date is Thursday October 30 Potential spring courses: ECE 431 and ECE 398RES (Renewable.
Announcements Homework #4 is due now Homework 5 is due on Oct 4
ECE 476 Power System Analysis Lecture 11: Ybus, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 476 Power System Analysis Lecture 15: Power Flow Sensitivities, Economic Dispatch Prof. Tom Overbye Dept. of Electrical and Computer Engineering University.
Lecture 13 Newton-Raphson Power Flow Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
ECE 476 Power System Analysis Lecture 17: OPF, Symmetrical Faults Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
Lecture 17 Optimal Power Flow, LMPs Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Lecture 11 Power Flow Professor Tom Overbye Special Guest Appearance by Professor Sauer! Department of Electrical and Computer Engineering ECE 476 POWER.
ECE 476 Power System Analysis Lecture 12: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 476 Power System Analysis Lecture 14: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Lecture 16 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Announcements Homework 8 is 11.19, 11.21, 11.26, 11.27, due now
ECE 476 Power System Analysis Lecture 18: LMP Markets, Symmetrical Faults and Components Prof. Tom Overbye Dept. of Electrical and Computer Engineering.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Lecture 15 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
0 Balanced 3 Phase (  ) Systems A balanced 3 phase (  ) system has three voltage sources with equal magnitude, but with an angle shift of 120  equal.
Lecture 14 Power Flow Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Announcements Please read Chapter 7 HW 6 is due today
Announcements Please read Chapters 7 and 8
Announcements Please read Chapter 6
Reading and Homework For lecture 3 please be reading Chapters 1 and 2
Announcements Homework 7 is 6.46, 6.49, 6.52, 11.19, 11.21, 11.27; due date is October 30 Potential spring courses: ECE 431 and ECE 398RES (Renewable Electric.
Announcements Homework 7 is due now.
ECE 476 Power System Analysis
ECE 476 POWER SYSTEM ANALYSIS
ECE 476 POWER SYSTEM ANALYSIS
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECE 476 Power System Analysis
ECE 476 Power System Analysis
ECEN 460 Power System Operation and Control
ME 312 PPE POWER SYSTEM ANALYSIS
ECE 476 POWER SYSTEM ANALYSIS
ECEN 460 Power System Operation and Control
ECE 476 POWER SYSTEM ANALYSIS
ECE 476 POWER SYSTEM ANALYSIS
ECEN 460 Power System Operation and Control
ECE 476 POWER SYSTEM ANALYSIS
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
EE 369 POWER SYSTEM ANALYSIS Lecture 15 Economic Dispatch Tom Overbye and Ross Baldick 1.
LMP calculations Congestion evaluation
DEC System Voltage Planning - June 2018
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 615 Methods of Electric Power Systems Analysis
ECEN 615 Methods of Electric Power Systems Analysis
ECEN 615 Methods of Electric Power Systems Analysis
ECEN 460 Power System Operation and Control
Presentation transcript:

ECEN 460 Power System Operation and Control Lecture 16: Economic Dispatch, Optimal Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering Texas A&M University overbye@tamu.edu

Announcements Finish reading Chapter 6 Homework 6 is 6.58, 6.59, 6.60, 6.62, 6.63; it is due on Tuesday Oct 31

Generator MW Limits Generators have limits on the minimum and maximum amount of power they can produce Often times the minimum limit is not zero. This represents a limit on the generator’s operation with the desired fuel type Because of varying system economics usually many generators in a system are operated at their maximum MW limits. 2

Lambda-Iteration with Gen Limits 3

Lambda-Iteration Gen Limit Example 4

Lambda-Iteration Limit Example,cont’d 5

Back of Envelope Values Often times incremental costs can be approximated by a constant value: $/MWhr = fuelcost * heatrate + variable O&M Typical heatrate for a coal plant is 10, modern combustion turbine is 10, combined cycle plant is 7 to 8, older combustion turbine 15. Fuel costs ($/MBtu) are quite variable, with current values around 1.5 for coal, 4 for natural gas, 0.5 for nuclear, probably 10 for fuel oil. Hydro, solar and wind costs tend to be quite low, but for this sources the fuel is free but limited 6

Inclusion of Transmission Losses The losses on the transmission system are a function of the generation dispatch. In general, using generators closer to the load results in lower losses This impact on losses should be included when doing the economic dispatch Losses can be included by slightly rewriting the Lagrangian: 7

Impact of Transmission Losses 8

Impact of Transmission Losses The penalty factor at the slack bus is always unity! 9

Impact of Transmission Losses 10

Calculation of Penalty Factors 11

Two Bus Penalty Factor Example 12

Example 6.22 13

Lab Seven Introduction: 37 Bus Lab seven covers economic dispatch and contingency analysis for the two systems from lab six 14

Lab Seven Introduction: 2000 Bus 15

Optimal Power Flow (OPF) OPF functionally combines the power flow with economic dispatch Minimize cost function, such as operating cost, taking into account realistic equality and inequality constraints Equality constraints bus real and reactive power balance generator voltage setpoints area MW interchange 16

OPF, cont’d Inequality constraints Available Controls transmission line/transformer/interface flow limits generator MW limits generator reactive power capability curves bus voltage magnitudes (not yet implemented in Simulator OPF) Available Controls generator MW outputs transformer taps and phase angles 17

Two Example OPF Solution Methods Non-linear approach using Newton’s method handles marginal losses well, but is relatively slow and has problems determining binding constraints Linear Programming fast and efficient in determining binding constraints, but can have difficulty with marginal losses. used in PowerWorld Simulator 18

LP OPF Solution Method Solution iterates between solving a full ac power flow solution enforces real/reactive power balance at each bus enforces generator reactive limits system controls are assumed fixed takes into account non-linearities solving a primal LP changes system controls to enforce linearized constraints while minimizing cost 19

Two Bus with Unconstrained Line With no overloads the OPF matches the economic dispatch Transmission line is not overloaded Marginal cost of supplying power to each bus (locational marginal costs) 20

Two Bus with Constrained Line With the line loaded to its limit, additional load at Bus A must be supplied locally, causing the marginal costs to diverge. 21

Three Bus (B3) Example Consider a three bus case (bus 1 is system slack), with all buses connected through 0.1 pu reactance lines, each with a 100 MVA limit Let the generator marginal costs be Bus 1: 10 $ / MWhr; Range = 0 to 400 MW Bus 2: 12 $ / MWhr; Range = 0 to 400 MW Bus 3: 20 $ / MWhr; Range = 0 to 400 MW Assume a single 180 MW load at bus 2 22

B3 with Line Limits NOT Enforced Line from Bus 1 to Bus 3 is over- loaded; all buses have same marginal cost 23

B3 with Line Limits Enforced LP OPF redispatches to remove violation. Bus marginal costs are now different. 24

Verify Bus 3 Marginal Cost One additional MW of load at bus 3 raised total cost by 14 $/hr, as G2 went up by 2 MW and G1 went down by 1MW 25

Why is bus 3 LMP = $14 /MWh All lines have equal impedance. Power flow in a simple network distributes inversely to impedance of path. For bus 1 to supply 1 MW to bus 3, 2/3 MW would take direct path from 1 to 3, while 1/3 MW would “loop around” from 1 to 2 to 3. Likewise, for bus 2 to supply 1 MW to bus 3, 2/3MW would go from 2 to 3, while 1/3 MW would go from 2 to 1to 3. 26

Why is bus 3 LMP $ 14 / MWh, cont’d With the line from 1 to 3 limited, no additional power flows are allowed on it. To supply 1 more MW to bus 3 we need Pg1 + Pg2 = 1 MW 2/3 Pg1 + 1/3 Pg2 = 0; (no more flow on 1-3) Solving requires we up Pg2 by 2 MW and drop Pg1 by 1 MW -- a net increase of $14. 27

Both lines into Bus 3 Congested For bus 3 loads above 200 MW, the load must be supplied locally. Then what if the bus 3 generator opens? 28

Example 6_23 Optimal Power Flow 29