Construction Approach and Productivity Issues

Slides:



Advertisements
Similar presentations
Operational Material. A 7-sheet Survey Questionnaire Resource Inputs and Basic Headings Outline Overall Validation Process Timetable Overall Methodology.
Advertisements

Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CONTRACT COSTING Contract costing is that form specific order costing which applies where the work is undertaken according to customer’s requirements and.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Communication campaign r. 2 Third parties & other sensitive relations Link with the projectLegal situations Carry out the projects (core tasks) 1. Beneficiary.
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Preparing a Post Bid Report Preparing a Post Bid Report NYS OGS Design & Construction Group Cost Control.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
WELCOME! Small Business Boot Camp 3 What are Rates, Build Ups, Pricing and Cost Centers?
Utah Association of Special Districts Procurement Training April 29 and April 30 at Central Utah Water Conservancy District.
Resource-Related Billing
Structure and Responsibility
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Regional Coordinators Meeting September 28-30, 2009 Washington DC Machinery & Equipment: Using Exchange Rates as PPPs for M&E.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Menu Pricing reflect the overall cost of running the operation These prices the costs needed to purchase, prepare and service it as well as labor rent.
Collaborative SIG Presentation: Projects to Profit Fundamentals
Nuts and Bolts of Government Accounting
Contract Management Reporting System Guidelines
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Contract Training Class I
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
Construction “Meet & Greet” Tuesday, July 24, 2012 Purchasing / Facilities Management.
Chapter 13 Estimates for Remodeling Work
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Measurement and Payment
Regional Coordination Agencies Meeting ICP 2015 – Updates to Machinery and Equipment Goods Washington DC, May 27 – 29, 2015.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
Technical Assistance Office 1 Contract, Reports and errors to avoid! GRANT AGREEMENT 2005 Comenius coordinators’ meeting, 17/10/2005 Maryline Fiaschi,
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOT 7 – CAPITAL WORKS.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
Session III:Global Core List survey materials for regional PPP updates Government Compensation 2 nd Regional Coordinating Agencies meeting May 27-29, 2015.
2 nd Regional Coordinating Agencies meeting May 27-29, 2015 Washington, DC Session V: Discussions on the future ICP integration into work programs and.
DOING BUSINESS WITH THE NATIONAL PARK SERVICE 1.
Maximizing synergies in regional and global post-2011 activities Requirements and challenges for linking regional PPP updates 2 nd Regional Coordinating.
5 th Regional Coordinator’s Meeting October 5-6, 2011 Washington DC Global Office.
Business for Health Business Skills for Private Medical Practices
Quality Assurance Procedures for Estimating Purchasing Power Parities
RECONCILIATION OF COST & FINAL ACCOUNTS
Global Core List survey materials for regional PPP updates
Session I: Global core lists and survey forms
Consumer Price Indexes
Status Report on ICP Methodological Development
OMI - THAMES WATER, INC ANNUAL SETTLEMENT STATEMENT CONTRACT YEAR 3
Costing and Project Evaluation
Job Order Contracting (JOC)
(Additional materials)
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
9/18/2018 Bids CONTRACTING Khamis…..
TOPIC-7- PROJECT CASH FLOW
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Classroom Enclosure – Phase II Bonnie Beard Agriculture Center
CIVL 493 CONSTRUCTION MANAGEMENT
TOPIC-7- PROJECT CASH FLOW
International Comparison Program 2011
Estimating – Overhead, Profit, Margins, & Markups workshop
ARCH 435 PROJECT MANAGEMENT
Communication campaign
United Nations Voluntary Fund on Disability (UNVFD)
Basic Principles of Estimating
Accounting for Construction Projects
Advancd Measurement and Contract Administration
ICTAD Formula Method for Price Fluctuation Price Fluctuation.
Presentation transcript:

Construction Approach and Productivity Issues Session II: Interim Technical Agenda Meeting of ICP Regional Coordinating Agencies Washington, D.C., USA October 30, 2015

Quick: Recap ICP 2011 Prices for 55 items (materials, labor, equipment): USED Different mix for each BH Resource mixes (materials, labor, equipment): USED To break-down BH expenditures Contractors’ mark-ups: NOT USED Professional fees: NOT USED Productive adjustment: NOT USED

Resource mixes (ICP 2011 formulation) What proportion of overall construction project value is taken by the main inputs to construction work (materials and products, labor and equipment) in the following types of projects? Other inputs - general site costs, head office overheads, profit, etc. - should be spread across the main inputs. Please indicate approximate percentage values.

Contractors’ mark-ups (ICP 2011 formulation) What percentages should typically be added to contractors' input costs to arrive at contractors' bid prices or construction purchaser prices? Please indicate approximate percentage values.

Professional fees (ICP 2011 formulation) What percentage additions should be allowed for both pre and post-contract services on different types of work? Professional fees will typically comprise pre- and post-contract services, including architectural and engineering design, technical supervision, project management and other specialist services, but national rules and practices must be taken into account. Please enter the total amount as a percentage of the contractor's cost (which will include the contractor's mark-up described above). The intention is to arrive at the end-user or purchaser price for construction work.

Discussion Is information requested clear for: Resource mixes; Contractors’ mark-ups; and Profession fees? Should the list of labor items contain an item for professional labor? How should the contractors’ mark-ups and profession fees be applied in practice: On prices; On PPPs; or Something else?