GGUS Partnership between FZK and ASCC

Slides:



Advertisements
Similar presentations
The Biosafety Clearing-House of the Cartagena Protocol on Biosafety Tutorial – BCH Resources.
Advertisements

Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
Request Management Mirror-. A random three day sample of Incidents revealed that about 86% of the registered Incidents were legitimate Requests Many other.
CLIENT SERVICE, IT(IL) BEST PRACTICES & REQUEST TRACKER ON A FEDERATED IT CAMPUS CLICK CLICK
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Helmut Dres, Institute For Scientific Computing – GDB Meeting Global Grid User Support.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Wofgang Thöne, Institute For Scientific Computing – EGEE-Meeting August 2004 Welcome to the User.
Alcatel Customized Training Site David Otero University of San Diego MSIT 526 Dr. Carl Rebman.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Community Help Desk Live Technical Support. Manitoba MOA: 2000 Establish 440 new CAP Sites Identify 50 Community Resource Networks (CRN) Work with existing.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
Clarity Educational Community Get the Results You Need When You Need Them Transitioning to CA PPM On Demand Presented by: Joshua.
Riccardo Bruno INFN.CT Sevilla, Sep 2007 The GENIUS Grid portal.
RLS Tier-1 Deployment James Casey, PPARC-LCG Fellow, CERN 10 th GridPP Meeting, CERN, 3 rd June 2004.
INFSO-RI Enabling Grids for E-sciencE GLOBAL GRID USER SUPPORT THE MODEL AND EXPERIENCE IN LCG/EGEE Gilles Mathieu(1), Torsten Antoni(2),
Tunis International Centre for Environmental Technologies Small Seminar on Networking Technology Information Centers UNFCCC secretariat offices Bonn, Germany.
Monitoring in EGEE EGEE/SEEGRID Summer School 2006, Budapest Judit Novak, CERN Piotr Nyczyk, CERN Valentin Vidic, CERN/RBI.
Coordinating the TeraGrid’s User Interface Areas Dave Hart, Amit Majumdar, Tony Rimovsky, Sergiu Sanielevici.
JSPG: User-level Accounting Data Policy David Kelsey, CCLRC/RAL, UK LCG GDB Meeting, Rome, 5 April 2006.
RI User Support in DEISA/PRACE EEF meeting 2 November 2010, Geneva Jules Wolfrat/Axel Berg SARA.
Empowering people-centric IT Unified device management Access and information protection Desktop Virtualization Hybrid Identity.
EGEE is a project funded by the European Union under contract IST User support in EGEE Alistair Mills Torsten Antoni EGEE-3 Conference 20 April.
Password? CLASP Project FOCUS Meeting, 12 October 2000 Denise Heagerty, IT/IS.
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
GGUS at PEB – –- page 1 LCG Klaus-Peter Mickel, GridKa Karlsruhe LCG-PEB-Meeting ( ) The Global Grid User Support Model (Report of GDB.
Proposal of interface between GUS + Call Center and Experiments GDB Meeting – Klaus-Peter Mickel GridKa Karlsruhe.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Torsten.
EGEE is a project funded by the European Union under contract IST Support in EGEE Ron Trompert SARA NEROC Meeting, 28 October
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Regional Dashboard Cyril L’Orphelin - CNRS/IN2P3.
Module 1: Overview of Microsoft Office SharePoint Server 2007.
Tier3 monitoring. Initial issues. Danila Oleynik. Artem Petrosyan. JINR.
LCG GDB LCG User Support 8 February 2005 – n o 1 LCG/EGEE User Support Flavia Donno LCG/INFN-Pisa
JD Edwards Support & Tools Gillian Boshell Product Service Advisor, Oracle Australia.
Operations model Maite Barroso, CERN On behalf of EGEE operations WLCG Service Workshop 11/02/2006.
© CGI Group Inc. PrimePortal & #define Annika Maltesson, Project Krister Sundkvist,
Active Directory Domain Services (AD DS). Identity and Access (IDA) – An IDA infrastructure should: Store information about users, groups, computers and.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks What all NGIs need to do: Helpdesk / User.
SharePoint and Active Directory Update March 18, 2010.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
Scuola Grid - Martina Franca, Thursday 08 November Il Sistema di Supporto INFNGrid & GGUS ( Global Grid User.
Antonio Fuentes RedIRIS Barcelona, 15 Abril 2008 The GENIUS Grid portal.
INFN-Grid WS, Bari, 2004/10/15 Andrea Caltroni, INFN-Padova Marco Verlato, INFN-Padova Andrea Ferraro, INFN-CNAF Bologna EGEE User Support Report.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Operations Portal OTAG September, 21th 2011 Cyril L’Orphelin – CCIN2P3/CNRS.
L’Oreal USA RSA Access Manager and Federated Identity Manager Kick-Off Meeting March 21 st, 2011.
CERN WLCG Grid Storage Systems Deployment Flavia Donno, CERN 6 November 2007 Organization of Storage Support through GGUS Flavia Donno CERN/IT-GD CERN.
Portals and CRM: what, When, Why, and How
GGUS New features and roadmap
Il Sistema di Supporto INFNGrid & GGUS (Global Grid User Support )
Grid.It Grid Managers Tutorial
Regional Operations Centres Core infrastructure Centres
EGEE is a project funded by the European Union
GGUS webportal – future plans
Ian Bird GDB Meeting CERN 9 September 2003
POW MND section.
EGEE/LCG Operation Workshop
Database Readiness Workshop Intro & Goals
Brief overview on GridICE and Ticketing System
ATLAS support in LCG.
Employee Self-Service
IT Partners Conference Oliver Thomas 19 April 2005
Operations & Coordination Tools
The CCIN2P3 and its role in EGEE/LCG
Nordic ROC Organization
LCG Operations Centres
Knowledge Centre Platform
LCG Operations Workshop, e-IRG Workshop
Leigh Grundhoefer Indiana University
Enterprise Program Management Office
CLASP Project AAI Workshop, Nov 2000 Denise Heagerty, CERN
WordPress Unit Web Coordinators
Presentation transcript:

GGUS Partnership between FZK and ASCC Rainer Kupsch & Wolfgang Thöne, FZK and Eric Yen & Min Tsai, ASCC GDB Meeting, FZK 8 March 2004

Progress for the partnership between FZK and ASCC 1st meeting on 5 March, 2004 Easiest first and hardest identified 2 options for ASCC Option 1: Whole Remedy administration at FZK No cost and low administration for ASCC Access for ASCC via Remedy Client or Web mid tier New Server HW and additional Licenses needed for FZK Good failover possible, with distributed server and clustered database Option 2: Administration of Remedy Server, Mid Tier, and Oracle database at ASCC as well New HW and Licenses (Remedy, Database) for ASCC Harmonizing of Remedy and Oracle versions at both locations Good failover Identify the works to be done in next 4 weeks and will be followed up by VTC on a regular bases Review Remedy trouble ticketing system (ASCC) Survey solution for single global point of contact (phone, email, portal) Propose initial handover procedures Specify those information needed to be shared among GOC, ESUS, CUS, and GGUS

Centralized Helpdesk Build and maintain a centralized and universal database for LCG issues Provide a centralized information source for further analysis Offer possible extensions to the GGUS problem management tools to meet the needs of other support groups Provide an experiment specific collection of problems and solutions with extended features like cross experiment search

Types of Problems Experiment specific problem GRID related Not easily qualified by GGUS GRID related Account Backup/Archive Batch System Certification Connection to… Environment Environment File Access GRID Tools Interactive Problem Login Problem Password Programming Other

Duties of GGUS Be a contact for the GRID users for all kind of problems Provide a web portal for: Submitting problem reports Status information that are of interest for a user User FAQ Current news Coordination of user problem reports (tickets) between ESUS, GOC, local operations, and CUS Develop a knowledge base for user problems Build a collection of all problems which are experiment specific

Collaboration Concept Define parts and portions that can be assigned within the team Assignment based on skills and workload No finger pointing, be responsible Responsibility must also mean the right to do and to decide Harmonized interfaces Consider GDB recommendations

Responsibilities Core responsibilities Issues Develop and maintain the ARS System Maintain the workflows Implement a knowledge base Maintain the Portal Web server platform ARS Interface Develop and maintain the user authorization and authentication Build and maintain the FAQ, link collection and the documentation Develop a global news collection or maintenance tool Issues SLA the 3rd GGUS

Milestone ASCC Extend support time to 15hrs on working days Incorporate feedback of ESUS representatives to do Extend collaboration with GOC for status information and enhancing the GGUS portal, based on ESUS (and CUS) needs  meeting: 09 March Prepare and discuss final concept for collaboration between ESUS and GGUS  February/March Start implementing final concept  April/May ASCC Finalize handover procedures between two GGUS centers Integrate tools and workflows in 1 month, expect to be operational till May Collect requirements and understand expectations of Asia LHC experimental users in April/May (including Taiwan, China, Japan, etc.) Extend support time to 15hrs on working days

Issues Collaboration among GGUS, GOC, ESUS, CUS Partnership discussion between GGUS and GOC on 9 March User info from each CA site may need to be accessible by GGUS Data and application model between GGUS sites (Germany, Taiwan, US) Scalable business and operational model

Prospect of GGUS Build and maintain a knowledge base of all Grid relevant problems and solutions, to help users solve most of their problems on their own Take advantage of Grid infrastructure for GGUS in the future Information replication, failover, problem diagnosis information collection, etc. Current Goal: Build and maintain a centralized database of all Grid relevant methods and tools Portal and KB are distributed but synchronized (mirrored) twice a day in the 3 GGUS sites User can access the fastest available GGUS Fail over guaranteed Complete information will be collected for problem diagnosis Both server side and client side logs are collected