Magnet Safety System for NA61/Shine

Slides:



Advertisements
Similar presentations
Using an FPGA to Control the Protection of National Security and Sailor Lives at Sea Brenda G. Martinez, Undergraduate Student K.L. Butler-Purry, Ph.D.,
Advertisements

André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Trigger-less and reconfigurable data acquisition system for J-PET
Hall D Solenoid Controls. Rockwell Software Overview RSLogix5000 (PLC Programming) RSLinx Classic (Rockwell software/hardware interface) FactoryTalk (GUI.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
PH/DT MCP & MNO NEW MAGNET SAFETY SYSTEM HARDWARE Sylvain Ravat PH-DT Xavier Pons PH-DT.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
SCADA and Telemetry Presented By:.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Running EPICS on NI CompactRIO Initial Experience Eric Björklund (LA-UR )
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Experience Running Embedded EPICS on NI CompactRIO Eric Björklund Dolores Baros Scott Baily.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
1. EPICS IOC on CompactRIO EPICS Collaboration Meeting Fall 2011.
1. LabVIEW and EPICS Workshop EPICS Collaboration Meeting Fall 2011.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
Software development Control system of the new IGBT EE switch.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
January 2010 – GEO-ISC KickOff meeting Christian Gräf, AEI 10 m Prototype Team State-of-the-art digital control: Introducing LIGO CDS.
Using COTS Hardware with EPICS Through LabVIEW – A Status Report EPICS Collaboration Meeting Fall 2011.
PLC based Interlock Workshop CIS Team February 2016 ITER Central Interlock System Fast Interlock Controller.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Combining safety and conventional interfaces for interlock PLCs
Software for Testing the New Injector BLM Electronics
Status & Plans for WA105 Control System
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
SCADA for Remote Industrial Plant
Haiwell PLC Modules Introduce
CV PVSS project architecture
Control and data acquisition system of the KTX device
Smart Ethernet I/O P2P and GCL Introduction
Controlling a large CPU farm using industrial tools
R&D of neutrino beam production for future (Multi-)MW proton facility:
the CERN Electrical network protection system
Gif++ Annual meeting 28/06/2017
Beam dump on LHC beams dumped on 08:20:04 by SIS, following a failing BLM HV check in IR7.
DarkSide-50 Distributed Control System Towards DarkSide-20k
2500 Series® Compact System Components
LHC BLM system: system overview
Development of built-in diagnostics in the RADE framework (EN2746)
2500 Series® Compact System Components
Status of Fast Controller EPICS Supports for ITER Project
The IFR Online Detector Control at the BaBar experiment at SLAC
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
COntrol, Data Access and Communication System for ITER
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
RF Local Protection System
Experiment Control System
EPICS: Experimental Physics and Industrial Control System
LHC BLM Software audit June 2008.
Operation of Target Safety System (TSS)
GasGard 100 Control System
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

Magnet Safety System for NA61/Shine Sylvain Ravat On Behalf of EP/DT-DI

NA61/Shine collaboration meeting - 19/09/2016 Introduction To protect VERTEX1&2, EP/DT-DI has been asked to replace the former quench detection system by MSS2 (Magnet Safety System 2). MSS2 is an upgrade of the safety system which protects LHC experiments. Based on proven National Instruments technology already used in the LHC collimators, Totem and ALFA position safety and interlock systems Already used on several magnets: COMPASS and M1 at Prevessin Site LHCb Dipole ALICE Dipole and Solenoid Atlas Central Solenoid Foreseen installations during EYETS 2016/2017: Atlas Toroids CMS Solenoid NA61/Shine collaboration meeting - 19/09/2016

MSS2 System Architecture Overview (1) HOST COMPUTER (annunciator + MDS) RT controller FPGA Ethernet (TN) DMA MSS2 CORE is cRIO which is autonomous Host PC provides an interface to MSS2, but it is not directly involved in magnet security C modules AI, DI, DO I/O’s NA61/Shine collaboration meeting - 19/09/2016

MSS2 System Architecture Overview (2) FPGA CORE Design : Parallel Acquisition loops for AI’s (period=200us) and DI’s (period=200us) Analog Processing : LO and HI alarms handling + Low pass Filter for each channel StateChart which determine MSS2 state -> IDLE, Slow Dump, Fast Dump DO’s generation based on logical equations implying MSS2 state, DI’s, Alarms... T = 200us T = 200us Design is made to be very flexible regarding amount of I/O’s and States handling in order to provide generic safety system NA61/Shine collaboration meeting - 19/09/2016

NA61/Shine collaboration meeting - 19/09/2016 MSS2 Typical Rack VAC receives and treats analog signals and sends results to MAC Crate CompactRIO IO Cards MAC receives digital and analog signals , cRIO FGPA will combine these signals and take actions to protect the magnets APC sends FPGA orders to dependent system such as magnet power supply, cryogenic plant… MAC Crate NA61/Shine collaboration meeting - 19/09/2016

MSS2 electronic cards Analog Input Card used in VAC crate Digital Input Card used in MAC crate NA61/Shine collaboration meeting - 19/09/2016

NA61/Shine collaboration meeting - 19/09/2016 MSS2 tools Annunciator A tool to find the causes of an abnormal magnet stop, Records MSS events at a rate of 5kHz, A User Interface accessible from WINCCOA SCADA system. Magnet Diagnostic System A tool to monitor all analog signals read by MSS2, Acquisition of a maximum of 80 analog signals at a rate of 5kHz, Make a post mortem file corresponding to 30s before and 5mn after a quench event, Archive and display analog signals at a rate of 1Hz. NA61/Shine collaboration meeting - 19/09/2016

Vertex 1&2 Protection signals MSS2 configuration by Magnet: 1 SQD, 1 Temperature TVO type and 1 Voltage for each current lead 3 joint voltage measurements 3 bridges ( combination of 2 voltages for each) 1 DCCT copy from power supply rack 2 Digital Output signal for FAST dump Current leads VCL VCL SQD SQD TVO TVO Joints Top Coil Bottom Coil 1 1 3/7 4/7 Bridges 3/7 4/7 MSS2 signals for VERTEX 1&2 NA61/Shine collaboration meeting - 19/09/2016

Hardware Installation NA61 Ctrl Room Cryogenic zone Voltages VERTEX 1 VERTEX 2 Temperatures + SQD Quench signal to Cryo NA61/Shine collaboration meeting - 19/09/2016

WINCCOA User Interfaces : Annunciator Records events with 200 us resolution. Online, direct analysis. Possibility to analyze older events with offline mode. MCS WINCCOA Dataserver OPCUA Client OWS TN MSS2 MAC Crate Publish MSS2 events via an OPCUA server NA61/Shine collaboration meeting - 19/09/2016

WINCCOA User Interfaces : MDS Inside MSS2 cRIO controller. Slow Acquisition at 33 Hz. Fast Acquisition file at 5kHz. WINCCOA Database WINCCOA Dataserver OCPUA Client OWS TN MSS2 MAC Crate Publish Analog measurements via an OPCUA server. NA61/Shine collaboration meeting - 19/09/2016

NA61/Shine collaboration meeting - 19/09/2016 Conclusion MSS2 is working from the beginning of July 2016. Transfer WINCCOA Application from local Windows PC in NA61 Control Room to a Linux Dataserver in CCC. EPICS server to communicate with EPICS client of NA61 DCS Test on technical network with Argonne EPICS Client on several machines. NA61/Shine collaboration meeting - 19/09/2016