Michael Sullivan and John Seeman SLAC National Accelerator Laboratory

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Page 1 PEP-II D&D Planning & Costing Exercises John Seeman Accelerator Systems Division SLAC National Accelerator Laboratory.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
B Factory D&D Review: March 23, 2009 Page 1 Overview of re-use requests and related issues D. MacFarlane Deputy Director, PPA.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Summary of Accelerator parallel sessions M.Biagini on behalf of 23 speakers SuperB09, LAL, Feb. 16 th 2009.
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
SABER Longitudinal Tracking Studies P. Emma, K. Bane Mar. 1, 2006
Positron Sources of Next generation B-factories (SuperKEKB, SuperB)
Test of Optical Stochastic Cooling in CESR
John T. Seeman DOE PEP-II Operations Review April 26, 2006
CesrTA Status Report Mark Palmer July 8, 2009.
Accelerator R&D for the Super-B Factory
SuperB Injection, RF stations, Vibration and Operations
Potential Use of PEP-II Magnets by Project X
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Super-B Overview John Seeman Accelerator Systems Division
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
Status of Project Guy Wormser LAL Orsay Tsukuba, March 24,
Electron Source Configuration
SuperB RF and Other Components
SuperB Accelerator Overview and Status
LAL meeting on e+ studies, Oct. 2010
MEIC Cost Estimate Overview
Accelerator R&D Results from the B-factory
CLIC damping rings working plan towards the CDR
J. Seeman Assistant Director for PPA/LCLS
FACET Accelerator Overview
Linac/BC1 Commissioning P
AC Power for a Super-B Factory
Summary of Washington DOE Review
FACET Accelerator Overview
Super-B Accelerator Overview
Super-B Factory in a “4400m” Tunnel
Polarization at the Super-B Factory
Cost Algorithm for a Super-B Factory
The Lepton colliders Data Base
J. Seeman Perugia Super-B Meeting June 2009
Electron Collider Ring Magnets Preliminary Summary
Feasibility of Reusing PEP-II Hardware for MEIC Electron Ring
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
First Look at Error Sensitivity in MEIC
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
MEIC Alternative Design Part V
Possibility of MEIC Arc Cell Using PEP-II Dipole
MEIC R&D Meeting, JLab, August 20, 2014
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Presentation transcript:

Michael Sullivan and John Seeman SLAC National Accelerator Laboratory PEP-II Hardware Michael Sullivan and John Seeman SLAC National Accelerator Laboratory Feb 15, 2009 Super-B Orsay Meeting

Super-B Arc cells layout M. Biagini Cell #1 Cell #1 LER HER Cell #2 Cell #2 Feb 15, 2009 Super-B Orsay Meeting

Super-B Layout with Polarization Jan 2008 (Wienands) Feb 15, 2009 Super-B Orsay Meeting

Lattice layout, PEP-II magnets reuse Lmag (m) 0.45 5.4 PEP HER - 194 PEP LER SBF HER 130 SBF LER 224 18 SBF Total 148 Needed 30 Total length 1800 m 280 m 20 m Dipoles Available Needed Quads Lmag (m) 0.56 0.73 0.43 0.7 0.4 PEP HER 202 82 - PEP LER 353 SBF HER 165 108 2 SBF LER 88 SBF Total 253 216 4 Needed 51* 134 Lmag (m) 0.25 0.5 PEP HER/LER 188 - SBF Total 372 4 Needed 184 Sexts All PEP-II magnets are reused. Dimensions and fields are properly sized. Feb 15, 2009 Super-B Orsay Meeting

Super-B components requested by INFN from SLAC (June 2008) A) North and South Damping ring components and injection/extraction lines B) Linac accelerator RF distribution waveguide (~72) C) Linac accelerating 3 m sections (~72) D) Linac klystrons (~36) E) Linac klystron modulators (~36) F) Linac QA and QB quadrupoles (23+13) G) Linac dipole correctors (~40) H) Linac polarized gun system & associated three spin rotators with cryo-systems (~1+3) I) Linac e+ target and capture area (~1+spares) J) LER and HER dipoles and quadrupoles (~1022) K) Dipole steering correctors (~836) L) Magnet mechanical supports (~1000) M) Vacuum chambers (~~650) N) RF stations (complete) (~15) O) Feedback systems (~4) P) Diagnostics (~120) Q) Injection hardware (LER and HER) R) Temperature monitors (~2000) S) Power supplies (~800) Feb 15, 2009 Super-B Orsay Meeting

Other Requests of PEP-II Components LCLS at SLAC: Loss monitors SPEAR-3 at SLAC; Bergos BPM electronics Project-X at FNAL: 100 HER dipoles and vacuum chambers Some quadrupoles 12 GeV energy upgrade at JLAB: “A dozen” quadrupoles BEPC-II at IHEP: Two longitudinal feedback kickers CesrTA at Cornell: Electron cloud dipole chicane and chambers Feb 15, 2009 Super-B Orsay Meeting

Priorities as set by the US DOE Office of Science Presently operating or soon to be operating US accelerators. LCLS, CesrTA Future US domestic accelerators. LCLS II, LCLS III, Project-X, PEP-X, JLAB energy upgrade Future US contributions to international accelerator programs. Super-B, BEPC-II Other international accelerator programs. X-FEL Dismantlement and disposal Feb 15, 2009 Super-B Orsay Meeting

SLAC Response to Super-B Components of INFN Request (September 2008) A) North and South Damping ring components and injection/extraction lines FACET B) Linac accelerator RF distribution waveguide (~72)  PEP-X C) Linac accelerating 3 m sections (~72) PEP-X D) Linac klystrons (~36)  PEP-X E) Linac klystron modulators (~36)  PEP-X F) Linac QA and QB quadrupoles (23+13)  PEP-X G) Linac dipole correctors (~40)  PEP-X H) Linac polarized gun system & associated three spin rotators with cryo-systems (~1+3)  Super-B I) Linac e+ target and capture area (~1+spares)  Super-B J) LER and HER dipoles and quadrupoles (~1022)  Super-B and Project-X K) Dipole steering correctors (~836)  Super-B L) Magnet mechanical supports (~1000)  Super-B and Project-X M) Vacuum chambers (~~650)  Super-B N) RF stations (complete) (~15)  Super-B and PEP-X O) Feedback systems (~4)  Super-B and BEPC-II P) Diagnostics (~120)  Super-B, LCLS, SPEAR-3 Q) Injection hardware (LER and HER)  Super-B R) Temperature monitors (~2000)  Super-B S) Power supplies (~800)  Super-B and some SLAC spares Feb 15, 2009 Super-B Orsay Meeting

Near term actions Cost estimation: removal of components from the PEP-II tunnel. packaging the components into shipping containers (steel shipping boxes) transportation costs to Italy Storage costs in Italy Two to four Italian engineers are coming to SLAC in late February (week of Feb 23) to discuss the task and shipping arrangements. DOE formal review of PEP-II Minimum Maintenance state (MMS) and Disposal and Dispersal (D&D) March 23-24, 2009 at SLAC. Feb 15, 2009 Super-B Orsay Meeting

PEP-II Hardware Conclusions The present Super-B design uses many of the PEP-II components. By weight and numbers, most of the Super-B requests can be fulfilled if the project goes ahead. If other projects do not go ahead, then Super-B could get additional components, primarily injection components. Engineers are studying removal, shipping, planning and costing. DOE review of PEP-II MMS and D&D in late March 2009. Feb 15, 2009 Super-B Orsay Meeting