SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.

Slides:



Advertisements
Similar presentations
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Advertisements

SuperB Detector Summary SuperB Miniworkshop, Oxford 18/19 th May 2011
07 October 2004 Hayet KEBBATI -1- Data Flow Reduction and Signal Sparsification in MAPS Hayet KEBBATI (GSI/IReS)
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
R&D status of FPCCD VTX and its cooling system Yasuhiro Sugimoto for FPCCD VTX group 1.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
Vienna Fast Simulation LDT Munich, Germany, 17 March 2008 M. Regler, M. Valentan Demonstration and optimization studies by the Vienna Fast Simulation Tool.
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
CLIC_ILD vertex detector modules and stave Layout Mathieu Benoit 15/03/12 mini workshop on engineering aspects of the CLIC vertex detectors 1.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
UK Activities on pixels. Adrian Bevan 1, Jamie Crooks 2, Andrew Lintern 2, Andy Nichols 2, Marcel Stanitzki 2, Renato Turchetta 2, Fergus Wilson 2. 1 Queen.
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
Blair Ratcliff, SLACUS R&D Meeting, Sept. 3, 2008 Blair Ratcliff SLAC Detector R&D: Overview and Opportunities Detector Overview (some old news!). Present.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size; ~6mm x 6mm Full.
SUMMARY AND DISCUSSION SAVERIO D’AURIA. SUMMARY Expertise from various experiments and from people with different background We tried to factorize what.
Status Report of the SVT external layers Lorenzo Vitale University and INFN Trieste.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
G. RizzoSVT Meeting – April, SVT Update SVT bi-weekly Meeting - April, Giuliana Rizzo Universita’ & INFN Pisa Group Organization & WBS.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Low Mass, Radiation Hard Vertex Detectors R. Lipton, Fermilab Future experiments will require pixelated vertex detectors with radiation hardness superior.
Vertical Integration Workshop, Schloss Ringberg, April 6 –9, 2008 V. Re1 Valerio Re INFN Pavia and University of Bergamo on behalf of the SuperB collaboration.
Pixel detector/Readout for SuperB T.Kawasaki Niigata-U.
G. RizzoSVT Status – SuperB Workshop, SLAC Oct SVT- Status Update on R&D activities for TDR X SuperB General Meeting Workshop SLAC – Oct. 6-9,
Draft of 3 year CMOS Strip Programme Need to advise WG3 on likely resource requirement Draft Outline provided at Valencia Discuss and improve basis for.
The SuperB Silicon Vertex Tracker Abstract : The SuperB project aims to build an asymmetric e+ - e- collider capable of reaching.
Detector Goals and General Syst. System Parallel Joint Parallel DGWG Mechanical Integ. TDR Organization System Summaries WORKSHOP Structure-Detector +
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
G. RizzoSVT - SuperB Workshop – Paris 16 Feb SVT Plans for TDR Activities since Elba Meeting Plans for TDR preparation Giuliana Rizzo Universita’
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Update on & SVT readout chip requirements
SVT – SuperB Workshop – Annecy March 2010
Valerio Re Università di Bergamo and INFN, Pavia, Italy
Dima Maneuski, Advances in rad-hard MAPS 2016, Birmingham
Valerio Re INFN Pavia and University of Bergamo
Giuliana Rizzo INFN and University, Pisa on behalf of SVT-SuperB group
Silicon eyes for radio-labeled biological samples
SVT Parallel-SuperB Workshop Perugia, June
SVT subchapters & editors
Technical Design for the Mu3e Detector
Preliminary thoughts on SVT services
BaBar Silicon Tracker Perspective
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
INFN Pavia and University of Bergamo
Hybrid Pixel R&D and Interconnect Technologies
SVT front-end electronics
ETD/Online Report D. Breton, U. Marconi, S. Luitz
SVT Mechanics Baseline SuperB SVT configuration
Workshop Goals for the Detector Groups
Characterization of the APSEL4D MAPS chip
LHCC Upgrade Session, 12 March 2013
Update on SVT activities
TK Upgrade report.
The SuperB Silicon Vertex Tracker
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
SVT detector electronics
SVT detector electronics
SVT- Status Update on R&D activities for TDR
Dual readout calorimeter for CepC
The LHCb VErtex LOcator
ETD parallel session March 18th 2010
SVT detector electronics
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information be obtained? What simulation tools are needed? What specific R&D is needed? What are the time scales for the decisions. If options are open, how can they be resolved and on what time scale? The most important issue is the baseline option for Layer0. Is the CMOS MAPS option mature enough to be proposed as baseline in 2-3 years TDR timescale? Technological advances are fast and thing are evolving in a time scale of 1-2 years so we should continue the strong ongoing R&D on this option Fast readout architecture on a full size pixel matrix (1-2 cm2) Radiation tolerance Background simulation set the scale on previous issues. In case MAPS are not considered mature by the time of TDR we need to have a solid option based on hybrid pixel, a mature and viable option that anyway requires some R&D to reduce the pitch and material budget to reach the SuperB requirements. NOT YET STARTED!!! Need to evaluate how far from the requirements (50x50 um pixel pitch, total material ~ 0.5-0.8 % X0) we can get with hybrid pixel Need to reevaluate if the expected performance with the best hybrid pixel design we can get are acceptable G. Rizzo SuperB Workshop – ELBA 2008

SVT Design Design of the SVT support structure and the best way to have the Layer0 easily accessible for replacement. Important interplay with IR design. For the external layers the technology is not an issue. For the TDR need to have a detailed design reoptimizing the geometry for SuperB (several issues raised yesterday no support tube, radial coverage, number of layers) and using the experience of BABAR (arch/wedge detectors in L4-5 were very difficult to be aligned…can we do better?). Need to evaluate the best front-end chip among the ones “on the market” G. Rizzo SuperB Workshop – ELBA 2008

Manpower How many physicists are involved now? Some of the physicist from SLIM5 are involved and interest is growing fast… The group is well motivated but we need more people/groups involved in this R&D hot phase. How many are needed? When? First guess: about 6 FTE starting a.s.a.p. Support for R&D, technical and design personnel? Very important the support from mechanical and electronic engineer. First guess about 9 FTE needed only ~ 4 FTE involved now. G. Rizzo SuperB Workshop – ELBA 2008

backup G. Rizzo SuperB Workshop – ELBA 2008

1) Scope of the R&D required (on L0) Striplets option: mature technology, less robust against background occupancy. This option become marginal with background rate higher than what stated on CDR ~ 5 MHz/cm2 (Toucheck??) With present back. estimate moderate R&D needed on module interconnection/mechanics/FE chip (FSSR2) CMOS MAPS options: new & more challenging technology, more robust against background occupancy. Extensive R&D needed Fast readout architecture Sensor optimization Radiation hardness Several mechanical issues: sensor thinning, module design, power dissipation, light cooling Hibrid Pixel Option needs to be evaluated more deeply: An example: Alice hybrid pixel module ~ 1% X0 Evaluate room for material reduction with the latest technology improvements Make a fair performance comparison with previous 2 L0 CDR options (in both cases module material ~ 0.5% X0) G. Rizzo SuperB Workshop – ELBA 2008

CMOS MAPS R&D goals TDR time scale: build a prototype multichip MAPS module suitable for application in Layer 0. Demonstrate the ability to build a working detector with this technology. Present R&D on DNW MAPS very encouraging Need to demonstrate fast readout architecture implementation is possible with this technology (R=5MHz/cm2, continous beam structure) Crosstalk due to digital line crossing the pixel seems cured but still some effects are present (power distribution? ) Scalability of the readout architecture to large matrix (Area ~1 cm2) 256 pixel matrix produced: test started. - 4k pixel matrix in production Nov. ’07 Issues for larger matrix: power distribution, output rate. efficiency of the readout Explore alternative architecture: data driven vs triggered architecture. Pixel cell optimization to improve S/N, charge collection efficiency, power dissipation. S/N = 1524, Power=30 mW/ch in chips just received Evaluate different technology (IBM 130 nm triple well) Radiation tolerance: tests performed on CMOS MAPS from other groups indicate adequate rad. hardness for SuperB. Some effects are design/process dependent needs to be investigated on our DNW MAPS. Irradiation program just started Optimize pixel cell for radiation hardness G. Rizzo SuperB Workshop – ELBA 2008

Mechanics & Module design R&D MAPS module proposed (AlN support + minichannel with cold liquid) Two MAPS layers (up/down) placed on the mechanical support forming a ladder. Each chip: 12.8mm x 12.8mm. Total Layer0 thickness: 0.5 % X0 0.1 % (Si) + 0.3 % (Supp+Cooling) + 0.1 % (bus/Cu) MAPS power dissipation is large (in the active area!) Power = 50 μW/cell = 2 W/cm2 Power dissipation drives the mechanical problem FEA for MAPS module proposed indicates power evacuation possible with a support/cooling thickness ~ 0.3% X0: Extensive R&D activity on microcooling See F. Bosi’s talk at the SVT parallel session. Need to demonstrate feasibilty with meas. on mechanical prototype Thermoidraulic Testbench in prep. for accurate thermic measurements Mechanincal activity also to optimize the design of the striplets option. G. Rizzo SuperB Workshop – ELBA 2008