ACP Inspector Certification Homework (oops, not homework) Solutions

Slides:



Advertisements
Similar presentations
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Advertisements

2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Caltrans Changes SECTION 39 “Hot Mix Asphalt”
Conversion of Petroleum Contaminated Soil into Asphalt-Treated Road Base U.S. Army Corps of Engineers, Alaska District.
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
PRESENTATION TO 34 TH ANNUAL AIRPORTS CONFERENCE 3/02/11 By: Casimir J. Bognacki, PE, FACI Chief of Materials Engineering.
Uniform Paving Platform Regional Asphalt Seminar, Blacksburg, VA March 12, 2015 David P. Shiells, P.E. District Materials Engineer.
Pavement Design Terms and Concepts
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
DESIGNING STONE TOE PROTECTION. IS STP THE RIGHT SOLUTION? IS THE CHANNEL BED STABLE? IS THE BANKFULL WIDTH IN BEND LESS THAT 130% OF BANKFULL WIDTH.
Mix Design Concrete School
Profile elevations Sometimes the profile is too steep to illustrate on our profile sheet so we have to break the profile. This partial profile illustrates.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
Prepared by Marcia C. Belcher Construction Engineering Technology
Asphalt Quality Assurance Program
Exam 3 Material Formulas, Proportions, Linear Inequalities
Calculating board Feet linear feet square feet
Quality Control Testing
Success with Alternatives to Paving Mr. Chuck Fromelt Day County Highway Superintendent Webster, South Dakota.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Pavement Maintenance II
Warm Mix for a Cold Climate Update on Colorado DOT’s 2007 WMA Project on I Rocky Mountain Asphalt Conference and Equipment Show.
You will learn to solve problems that involve the perimeters and areas of rectangles and parallelograms.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Calculations On completion of this unit the Learner should be able to demonstrate an understanding of: The formula used to calculate: Areas Volumes Ratios.
Developing a Mixture-Based Specification for Flexible Base.
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
Asphalt Roadway Daily Report of Quality Control (Form No ) A step by step guide.
Measurement: Changing Customary Units
Density Problems. Directions:  Write your answers on the white board.  I need to see your calculations!  Make sure you have the correct units of measurement.
3 - 1 Holding The Contractor to 105% of the Target Spread Rate!
Volume: Descriptions, Calculations & Industrial Applications
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
6-4 Solving Polynomial Equations. Objectives Solving Equations by Graphing Solving Equations by Factoring.
Estimating Concrete Construction and Material Cost
Density Essential Question: How do you calculate density when you have the appropriate data?
Location of Exponent An An exponent is the small number high and to the right of a regular or base number. 3 4 Base Exponent.
5 ft 3ft 5ft 3ft Always write your answer with the unit of measurement.
SATMathVideos.Net Water is pumped into an tank at 20 gallons per minute. The tank has a length of 10 feet and a width of 5 feet. If the tank starts empty,
Choosing the Right Asphalt Mix Clark S. Morrison, PE State Pavement Design Engineer February 23-24, 2015.
Extending Performance with Proper Asphalt Compaction
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
Alabama Asphalt Pavement Association
Florida APT Update.
Gary Murphy Pavement Management Fredericksburg District
David P. Shiells, P.E. District Materials Engineer
Thin Hot Mix Asphalt Overlays PennDOT Research Findings
Exponents.
Research Implementation WHRP Flexible Group
8.2 Problem Solving in Geometry with Proportions
Exponents.
Panel discussion Date.
Section 8.1 Ratio and Proportion
Section 8.1 Ratio and Proportion
PAVEMENTS CEE 320 Steve Muench.
Longitudinal Joint Construction – Why Straightness Matters
Paramix mid-term meeting in Barcelona November 13, 2002
Introduction to Pavement Design
8.2 Problem Solving in Geometry with Proportions
FBE05 – Mathematics and Statistics
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Section 5.8 Solving Equations by Factoring
Pavement Structural Analysis
ESTIMATING EARTHWORK Prof Awad S. Hanna.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Missouri Stringless Paving: I-35 Unbonded Concrete Overlay
Presentation transcript:

ACP Inspector Certification Homework (oops, not homework) Solutions January 2007 ACP Inspector Certification Homework (oops, not homework) Solutions

PG 64-22 or PG 64-28 may be substituted for the grade of asphalt cement specified in the Contract for guardrail flares, mailbox turnouts, and road approaches. 2.Pavement legends may be left in place in areas where an overlay greater than 2” is being placed. True – 00745.11 (a) – Asphalt Cement, Additives, and Aggregate Treatment, Page 658. False – 00745.42 – Preparation of Underlying Surfaces, Page 669.

3.When leveling irregular surfaces, the compacted thickness of intermittent areas of 1,000 sf or less should not be more than 4 inches. 4.Compaction of thin pavements to a specified density is not required for leveling, patches or where the dense graded pavement is less than 2 inches. True – 00745.46 (c) – Hauling, Depositing and Placing, Page 670. True – 00745.49 (c) – Compaction QC (Thin Pavement), Page 674.

5.For a mix designated as 2.0” Level 2, ½” Dense Graded HMAC, the Level 2 applies to the smoothness requirements for the project. False – See Student Manual or 00745.02 Definitions page 653

6. Using the paving example presented in class, determine the Post Bid Mass calculation for a pavement thickness of 3.0”.

Post Bid V olume Calculations For the following calculations, use the cross section and mix design provided. Calculate the volume for one side of the section and then multiply it by two to determine the total HMAC volume. 2.6 52 Length (miles) = _________ Width (ft) = ____________________ Length (ft) = Length (miles) x 5280 ft/mile= ___________________ Surface Area (sq ft) = L x W = _____________________________ Lift Thickness of HMAC (in) = _________________________________ Volume (cu ft) = SA x T/12 = _____________________________ 13,728 13,728 x 52.0 = 713,856 3.0 713,856 x 3/12 = 178,464

Post Bid Mass Calculations 2.417 Gmm (Rice value) from JMF = _____________________ Min Compaction per Specification = _________________ Expected Compaction = Min Compaction + 1% = ______ Mix Unit Wt. (lbs/cu ft) = Gmm x 62.4 lbs/cu ft x Expected Compaction/100 = ______________________ Est. Mix Quantity (tons) = V x Mix Wt./2000 = _____________________________________________ 92% 93% 2.417 x 62.4 x 93/100 = 140.3 178,464 x 140.3/2000 = 12,519.25

7. Tack – Understanding Dilution 1:1 As Manufactured Add Water Diluted 1:1 1/3 Asphalt 2/3 Water Residual AC = 0.67/2 = 0.33 1/3 Water 1 Water + = 2/3 Asphalt Residual AC = 0.67

7. Tack – Understanding Dilution 1:1 – Example Using Volume As Manufactured Add Water Diluted 1:1 100 gal Asphalt 200 gal Water Residual AC = 100/300 = 0.33 50 gal Water + = 150 gal Water 100 gal Asphalt Residual AC = 100/150 = 0.67

7. Tack – Understanding Dilution 1:1 Contractor is applying diluted tack at 1:1. What should the application rate be to wind up with a residual asphalt application of 0.05 gal/sq yd? Application rate: Residual AC Needed/Residual AC in Tack Application rate: 0.05/0.67 = 0.07 gal/sy

8. Determine the Expected Yield (Mass) for the pavement section below: Actual Gmm = 2.559 Actual % Compaction = 92.0 % Plan Lift Thickness = 3.0 in Paved Width = See below Section Length = See below

AREA CALCULATION AREA 1 = (3435-2100) * 12 = 16,020 sq. ft. TOTAL AREA = 1335 + 920 = 16,940 sq. ft.

Expected Yield (Mass) Calculations Area (sq. ft.) = __________________ Lift Thickness for HMAC (in) = ___________________________________ Volume (cu ft) = L x W x T/12 = _________________________________ MAMD (lbs/cu ft) (Gmm x 62.4 lbs/pcf) = __________________________ %Compaction from CDT = ______________________________________ Mix Unit Wt. (lbs/cu ft) = MAMD x %C/100 = ______________________ Expected Yield (tons) = V x Mix Wt./2000 = _______________________ 16,940 3 16,940 x 3/12 = 4235.00 2.559 x 62.4 = 159.682 92.0 159.682 x 92.0/100 =146.907 311.08

I will use an average width= Total Area/Total Length 9. Complete the attached Material Delivery and Yield Check Sheet which is based on the pavement section shown in Problem 8. Does the Load Yield calculated meet the tolerance required when compared to the theoretical yield? I will use an average width= Total Area/Total Length 16,940 sqft / 1,335 ft = 12.69 ft average width

QUESTIONS/COMMENTS