AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB

Slides:



Advertisements
Similar presentations
January 11, Data Format for MICE Trackers Tracker Data Readout Basics Preliminary Tracker Data Format and Suitability for VME Data Transfers. Questions.
Advertisements

Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference, August 20, 2007.
Windows Server 2008 R2 Oct 2009 Windows Server 2003
Jan 2016 Solar Lunar Data.
Tracker TriP-t Test Stand
Muon Recording Studies and Progress for the MICE Tracker
Q1 Jan Feb Mar ENTER TEXT HERE Notes

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
<Location> – <Project Name>, Sponsor: <name>



Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat

North Carolina Piedmont Region Consortium Timeline
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com

Step 3 Step 2 Step 1 Put your text here Put your text here
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat
2018 Advantage Program Timeline Guide

Electricity Cost and Use – FY 2016 and FY 2017

2014 Advantage Program Timeline Guide *** Progress Visits ***
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com


2017 Advantage Program Timeline Guide
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2

TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline

2013 Safety Group Advantage Program Timeline
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Change Management E2E Roadmap
2016 Advantage Program Timeline Guide
Presentation transcript:

AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB memory banks storing charge and time data Firmware Progress AFE IIt VLSB Hardware Progress DFPGA directs DFPGA and AFPGA data flow bitmaps from TriP-t chips bitmaps directing zero-suppression charge and time data AFPGA controls ADC and TriP-t operation AFE IIt Terry Hart, Tracker Phone Meeting, May 16, 2007

AFE IIt Firmware Progress since April phone meeting Current plans Worked out, coded, and simulated operation of bidirectional data bus Protocol of data transfers on bidirectional bus Operation of event buffer and pipeline Successful test of data bus at 53.104 MHz Worked out data format and operation modes Current plans Working out protocol for keeping data streams within AFE IIt boards synchronized Terry Hart, Tracker Phone Meeting, May 16, 2007

VLSB Firmware Direct Memory Access Block Transfers Code found which accomplished this Fast Clear of VLSB memory banks Should be done with simple code modifications Advance memory address only when receiving data (not when receiving zeros) Initial code written which needs to be tested May require Aldec design tool Terry Hart, Tracker Phone Meeting, May 16, 2007

AFE IIt Hardware Matching boards to production cryostats Currently, 8 boards almost ready for 2 cryostats Malcolm wrote document listing necessary hardware modifications and firmware uploads Hardware modifications include soldering surface mount components Kwame Bowie currently uploads firmware as boards become ready. Spare boards to be sent to RAL for repairs Accounting of boards at FNAL, RAL, and Imperial made. Terry Hart, Tracker Phone Meeting, May 16, 2007

VLSB Hardware Determined that VLSB boards don’t need to be redesigned for MICE modifications Have 11 boards, need about 13 more Existing MOU needs to be followed up to make VLSB modules Terry Hart, Tracker Phone Meeting, May 16, 2007

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec TriP-t/ADC Control Firmware Hardware tests DFPGA/AFPGA I/O Bus Board test at 53.104 MHz Board test at 55 MHz Simulations at different frequencies Data transfer protocol AFPGA Firmware Write firmware controlling bitmap transfers Test pipeline/buffer operation Test mode development DFPGA Firmware Make 4-level trigger buffer Data format Event aggregation VLSB Firmware Data block transfer Fast clear of memory banks Suppress writing zeros to memory Done Done Done

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec TriP-t/ADC Control Firmware Hardware tests DFPGA/AFPGA I/O Bus Board test at 53.104 MHz Board test at 55 MHz Simulations at different frequencies Data transfer protocol AFPGA Firmware Write firmware controlling bitmap transfers Test pipeline/buffer operation Test mode development DFPGA Firmware Make 4-level trigger buffer Data format VLSB Firmware Event aggregation (VLSB) Data block transfer Fast clear of memory banks Suppress writing zeros to memory VLSB Board Manufacture (13 boards) AFE IIt Board Preparation Repairs for MICE Firmware and hardware modifications Board characterization in cryostats Ship cryos/boards to RAL Done Done Done Conservative simulations indicate this is marginal Conservative simulations this is marginal Done Done Standalone routine written Feedback loop testing previous version Done, sort of Low to middle priority Done Should be quick, how to tell when clear is done Initial code written, needs to be tested Follow up on existing MOU Ongoing Ongoing Ongoing