NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.

Slides:



Advertisements
Similar presentations
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
Electromagnetic Compatibility of a Low Voltage Power Supply for the ATLAS Tile Calorimeter Front-End Electronics G. BLANCHOT CERN, CH-1211 Geneva.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Performance of SPIROC chips in SKIROC mode
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
QUPID Readout and Application in Future Noble Liquid Detectors Kevin Lung, UCLA TIPP 2011 June 11, 2011.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
Meeting from Mai 10th at ETHZ ArgonTube electronics Charge amplifier or linear amplifer ? Front end module Max Hess.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
2007 detectors study at CERN 1.SiPM time resolution 2.MAPD S60 3.Blue sensitive MAPD 4.New 16ch board 5.New HV.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
BMBF-JINR PANDA Meeting, Dubna, November 15, 2013 G.Alexeev (for muon group) Status of Project and Related Topics * Report to the Muon Review Panel ( CERN,
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
STATUS of BIG PROTOTYPES A. Piskun (for Dubna group) Protvino, 7 June 2011 _________________________________________________ Full Scale Prototype Range.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
L. Benussi On Behalf of LNF crew
Test beam straw prototype production status
Pid session TDC-based electronics for the CRT
Scintillator testing in Prague (update from Aussois)
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
LED notched fibre system short HBU0 party with QMB6
CTA-LST meeting February 2015
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Large Area Endplate Prototype for the LC TPC
T1 Electronic status Conclusions Electronics Cards:
Status of upgrade works at Clermont-Ferrand
Quad TPX3 chipboard PCB Cooling block Cooling block Cooling block TPX3
Large CMS GEM with APV & SRS electronics
VeLo Analog Line Status
VELO readout On detector electronics Off detector electronics to DAQ
Development of Gas Electron Multiplier Detectors for Muon Tomography
UCSB Short-term Testing Plan
BESIII EMC electronics
UK CMS Oversight Committee Mtg
PID meeting Mechanical implementation Electronics architecture
ZDD status BESIII Collaboration Meeting, September 2012
DAQ and visualization software
Presentation transcript:

NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow

NA61 PSD is now fully quipped with new electronics - tested on temperature regulation and control stability – OK - tested on data acquisition readout - OK 24 June 2014 2

New cooling system, FEE, HV and control system for one module Electronics of one PSD module after upgrade Readout module (old one) New electronics 3

Schematic view of slow control and temperature control readout system for NA61 PSD HVSys, Dubna flat cable HV control box HVSys HVSys HVSys . . . HVSys LAN TEC TEC TEC TEC RS485 network (twisted pair) USB USB to RS485 Converter PSD readout PC USB to RS485 Converter (We will have 2 RS485 networks X 22 channels each) The system has been tested for stability - OK 24 June 2014 4

First tests of DAQ have shown large noise levels.. one event pedestal spectrum MIP is here - the source is: DAQ concentrator boards - the reason: no common ground after change to new HV power scheme - to fix: make common ground between new and old electronic modules. 24 June 2014 5

But.. we have another noise source: TEC-1091 controller. TEC OFF TEC ON effect on pedestal one event one event TEC OFF TEC ON effect on MIP-like signal one event one event 24 June 2014 6

TEC-1091 effect on pedestal and MIP-like signal TEC OFF pedestal MIP-like TEC ON Why do we not see a significant effect? The answer is: just by chance: signal calculation pedestal calculation ~110 “ticks” 100 “ticks” 24 June 2014 7

Possible solution to avoid noise from TEC-1091 controller: cover TEC PCB with shield (we have used a copper foil) TEC OFF pedestal spectra TEC ON one event one event TEC ON + shield on TEC TEC OFF TEC ON TEC ON + Shield one event 24 June 2014 8

Another possible solution to avoid noise from TEC-1091 controller: use sine fit to calculate pedestal level: - disadvantage: too slow (only for offline analysis) pedestal spectra MIP-like spectra 0-19 ch pedestal sine fit pedestal 0-19 ch pedestal sine fit pedestal 24 June 2014 9

Cooling system test results (48 hours) Room temperature Temperature in one module at different times New MAPDs cooling system based on the Peltier elements provide stable given temperature in each module Temperature of all 44 modules at given time 10

1) the new electronics has been mounted and tested: Conclusions: 1) the new electronics has been mounted and tested: - noise from concentrator boards have been eliminated with common ground - TEC-1091 controller noise has been studied: a) period of noise signal = range of pedestal ↔ signal => minimum noise effect b) offline sine fit for pedestal => minimum noise effect MIP-like signal is visible in (a) and (b) as well 2) slow control and temperature control systems have been tested and show no problems 24 June 2014 11