PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.

Slides:



Advertisements
Similar presentations
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Advertisements

State Milestones Subsidized Insurance Workgroup High Level Timeline 2011 Jan 2011 Feb 2011 Mar 2011 Apr 2011 May 2011 Jun 2011 Jul 2011 Aug 2011 Sept 2011.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Baseline Reconsultation Timeline Timeline (1) Aug SepOctNov Dec 14/8 Workshop 1: History & Timeline 17/8 Workshop 2: Methodology Brainstorm.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Non Leap YearLeap Year DateDay NumberMod 7Day NumberMod 7 13-Jan Feb Mar Apr May Jun Jul
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
Industry Dialogue on xoserve Services 14 th September 2007.
European Developments Transmission Workgroup 3 rd May 2012.
Jan 2016 Solar Lunar Data.
Timeline Roadmap Template
EU Implementation Programme
Transmission Planning Code
Transmission Workgroup 4th October 2012
Appendix C New Administration General Assembly Session
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun

CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
RC Ohio Valley Region Strategic and Annual Planning Process January – September 2016 Notes Fr John says greeting and reflects on 75 anniversary and then.
UNC Trader User – Licence obligations
Due Dates subject to change. Watch for dashboard updates.
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
September 8, 2016 Request Approval of the Determinations to be Submitted to Rules Review Commission for Subchapter 15A NCAC 02E (Periodic Review of Existing.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Capacity Methodology Statements: Impact of Mod 452
GOMACTech-04 Technical Program Committee Timeline
NTS Entry Charging Review Update
PBIS Update December 2005.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
2018 Advantage Program Timeline Guide
Exit Capacity Substitution and Revision
DSC ChMC CSS update 6th July 2018
Draft Capacity & Connection Plan
Update on Exit Capacity Substitution and Revision
3 step process Step 1: Agency determination
FAY Dates School Year Traditional Fall 4x4 Spring 4x
Capacity Methodologies Review 2019
Transmission Planning Code Review
General Plan Amendment & Zone Change Timeline
PARCA Timeline.
Draft Mod: Update of default System Marginal Prices
Revised Tender Timescale for DN Interruption Arrangements
Gas Customer Forum DN Interruption Update - Introduction
Mark Freeman 29th January 2007
Options for the Development of a Demand Side Response Mechanism

Generic Revenue Driver Methodology
Transmission Workstream DN Interruption Update - Introduction
NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017
Transmission Workgroup July 2012
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Revised Tender Timescale for DN Interruption Arrangements
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
Budget Planning Calendar
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2013 Safety Group Advantage Program Timeline
PBIS Update January 2006.
XRN Nov 19 Release - Status Update
Capacity Access Review
2016 Advantage Program Timeline Guide
Presentation transcript:

PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman

Previous Timeline Shared with Industry July Aug Sept Oct Nov Dec Jan Feb Mar Apr Draft Workgroup Report Ofgem decision on Mod Panel decision on Consultation Consultation Period Final Workgroup Report Panel decision on Mod This was a very high level timeline It did not include updates to, and consultation of, Methodology Statements and the Generic Revenue Driver Methodology It also did not include the 56 day period of appeal of proposed Licence changes NG NTS & Ofgem undertake Licence Drafting Licence Change Consultation Period Ofgem Direct Changes to Licence

Draft Revised Timeline for discussion July Aug Sept Oct Nov Dec Jan Feb Mar Apr Customer Seminar Draft Workgroup Report Ofgem decision on Mod Panel decision on Consultation Consultation Period Final Workgroup Report Panel decision on Mod NG NTS & Ofgem undertake Licence Drafting Licence Change Consultation Period Ofgem Direct Changes to Licence 56 day period of appeal of proposed Licence changes Methodology Statements Consultation Period NG NTS request Ofgem consent for a derogation on Licence condition for independent examination of methodology statement changes NG NTS consider responses & make necessary updates Ofgem period of approval NG NTS request Ofgem consent for a derogation on Licence condition for independent examination of Generic Revenue Driver Methodology changes Generic Revenue Driver Methodology Statement Consultation Period NG NTS consider responses & make necessary updates Ofgem period of approval

Draft Revised Timeline Comments Extended period for Ofgem decision on Mod as falls over Christmas period July Aug Sept Oct Nov Dec Jan Feb Mar Apr Customer Seminar Draft Workgroup Report Licence and Methodology Statement Consultations undertaken together following mod decision Ofgem decision on Mod Panel decision on Consultation Consultation Period Final Workgroup Report Panel decision on Mod Licence Drafting to be completed before Christmas NG NTS & Ofgem undertake Licence Drafting Licence Change Consultation Period Ofgem Direct Changes to Licence 56 day period of appeal of proposed Licence changes Methodology Statements Consultation Period NG NTS request Ofgem consent for a derogation on Licence condition for independent examination of methodology statement changes NG NTS consider responses & make necessary updates Ofgem period of approval If independent examinations are required, this is likely to extend the timescales for approval of Methodology Statements and GRDM NG NTS request Ofgem consent for a derogation on Licence condition for independent examination of Generic Revenue Driver Methodology changes Generic Revenue Driver Methodology Statement Consultation Period NG NTS consider responses & make necessary updates Ofgem period of approval

Implications of Changes Draft Workgroup Report to be submitted one month later (now September) This results in Ofgem’s Mod decision being communicated in January rather than December (extended timescales included to account for Christmas period) Licence Drafting has been removed from the critical path but has been replaced by the 56 day period of appeal of licence changes The Licence and Methodology Statement Consultations occur in parallel following Mod Approval The Implementation of Mod, Licence changes, revised Methodology Statements, revised GRDM & revised Charging Statement to be at the end of April, rather than at the start.