Move date to here rather than above and, for English version, in format: July 19, 2010 Adjust text alignment right Please pick up fields on BE for “Low*” and “High*” with 1 ‘*’ Insert “© Steel Business Briefing 2010”
Should be populated with current MTD price (i. e Should be populated with current MTD price (i.e. average for July-10 to date). Label as ‘Jul-MTD’. Should be populated with current QTD price (ie. average for Q3-2010 to date). Label column as ‘Q3 QTD’. Move all other data one column to the left, leaving room to include Q3’09.
Incorrect data. Do not recognise where this data has come from Incorrect data. Do not recognise where this data has come from. Should be populated with data for most recent 2 weeks entered on BE under: Data entry/China Port Vessel Wait.
Incorrect chart. Should be line graph showing TSI 62% Fe spot price for past 12 months.
[ ] to be populated from BE/Data Entry/Iron Ore Normalisation Data/62% Fe Fines Coefficient (Latest data entered [ ] to be populated from BE/Data Entry/Iron Ore Normalisation Data/58% Fe Fines Coefficient (Latest data entered
Please create the necessary fields in the BE for a 4th set of contact details to be added (we need to add the USA details) under Email-Media Settings-Edit-Contacts. Reduce width of these boxes and insert 4th box in the same row.