Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Giuseppe Roselli (CMS-RPC) Università degli Studi di Bari – INFN RPC Efficiency with Track Reconstruction Giuseppe Roselli.
Muon Data Quality and Performance A. Belloni - G. Zevi Della Porta for the ATLAS Harvard Group DOE Site Visit
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
Calibration for different trigger sources (DT,CSC,RPC) S.Bolognesi for the Torino group (with a big help from M. Dalla Valle) DT Cosmic Analysis meeting.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, CERN June 18, 2005.
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
US Test beam data analysis & validation of OSCAR/ORCA Tim Cox, UC Davis Nikolai Terentiev*, CMU CMS Physics Week Fermilab Apr , 2005.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
CSC Digitization Rick Wilkinson 1. CSC design and readout Large chambers Wires groups:5 cm wide Cathode strips: 8-16 mm wide 3.3 m wire-group hits every.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Data Quality Monitoring of the CMS Tracker
RPC Readiness for Data-taking RPC Collaboration 1.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
HCAL DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova for the HCAL DPG October 20, 2011.
HCAL General Meeting: DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova Frank Chlebana HCAL General Meeting Apr 21, 2011.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Data Quality Monitoring for the CMS Resistive Plate Chamber Detector Anna Cimmino etc etc etc Università degli Studi di Napoli “ Federico II ” & INFN of.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
1 SDD offline status Francesco Prino INFN sezione di Torino ALICE offline week – March 15th 2010.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
USCMS Physics, May 2001Darin Acosta1 Status Report of PRS/  D.Acosta University of Florida Current U.S. activities PRS/  Activities New PRS organization.
Notes in preparation by the Torino group Sara BolognesiDT Cosmic Meeting 01/11/2007  MTCC note:  calibration section  DQM section  Internal note about.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
January 2009 offline detector review - 2 nd go 1 ● Offline – Geometry – Material budget – Simulation – Raw data – OCDB parameters – Reconstruction ● Calibration.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
Calorimeter Status Electronics Installation and Commissioning
P. Paolucci G. Pugliese M.Tytgat
RPC Data Certification
RPC – status / results Blanco On behalf of HADES RPC Group
Online Monitoring : Detector and Performance check
Marian Ivanov TPC status report.
Calibration Status of the art – the first tTrig calculated from data
CMS muon detectors and muon system performance
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
for the transition region on behalf of the RPC upgrade group
CMS Preshower: Startup procedures: Reconstruction & calibration
Status of Full Simulation for Muon Trigger at SLHC
DT Local Reconstruction on CRAFT data
HCAL Commissioning and Related Activities
Slice Test: Preliminary Data Analysis The Ohio State University
CSC Digi & RecHit Validation
Commissioning of the ALICE-PHOS trigger
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
DQM for the RPC subdetector
11th Pisa meeting on advanced detectors
(On Behalf of CMS Muon Group)
Resistive Plate Chambers performance with Cosmic Rays
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis) Mario Pelliccioni (INFN Torino) for Muon IB, CMS Week, CERN, 28-Feb-2012

Outline Common issues DPG Status CSC DT RPC Conclusions

Common Issues We went through CMS DQM & AlCaDB reviews in January, without trouble. - DQM review encompassed Data Certification too. - AlCaDB review encompassed general Database usage & ‘Calibration’ conditions data for offline (DT/CSC), RPCMonitor Stream (RPC). Muon DPG Paper ongoing, meeting with ARC this week. 2012 MWGR, first results good sync among our Muon Detectors. A lot of software changes were made, (SLC5, CMSSW_5_X_X). From DPG side everything is fine. DT vs RPC DT vs CSC CSC vs RPC

CSC DPG 2012 STATUS Updating Bad Chambers (used in Simulation) and Bad Channels (used in Rechit-building) conditions data files, ready for 2012 Sim & Reco. New DQM plot to monitor L1A mismatches within CSC electronics, for diagnosis of the r/o efficiency problem uncovered at high L1A rates in 2011. - CSC readout experts have made great progress towards curing this problem. Starting to investigate CSC data rates (via LCT multiplicities) as function of trigger. Measured LCT and Segment efficiencies in 2011 data using ZMM Tag & Probe, confirms inefficiency in CSC r/o for L1A rates > ~70kHz, but not in LCTs. Release Validation continues smoothly as CMSSW is developed for 2012. Reviewed Data Certification workflows and integration with CSC DQM Shifts. - Intend to use Run Registry 3 to feed CSC expert shifter comments into Data Certification. MWGR runs show CSC system and entire online to offline chain is working fine after all hardware upgrades and CMSSW version upgrades over winter shutdown. - Online switched to SLC5 - Offline switched to CMSSW_5_X - CSC rechit container members simplified. - Gas-gain corrections applied in order to supply an ‘energy loss’ in rechit. - Anode zero suppression operational online (firmware) & offline (Raw data Unpacker).

CSC rechit global positions Run 185163 B=0 CSC+RPC Cosmics Trigger [MWGR 15 Feb 2012] in Offline DQM Standard asymmetry -z > +z for cosmics due to shaft, & top > bottom

CSC rechit global positions Run 185984 B=0 CSC+DT+RPC bottom-only Cosmics Trigger [MWGR 23/24 Feb 2012] in Offline DQM Standard asymmetry -z > +z for cosmics, due to shaft & bottom > top due to trigger - All looks good and confirms CSC system is operating ~normally after shutdown.

CSC local reco #Rechits/Event #Rechits/Event log scale 6 = 1 CSC Run 185163 B=0 Cosmics [MWGR 15 Feb 2012] Blue points are Run 158335 CRAFT Cosmics [Feb 2011] #Rechits/Event #Rechits/Event log scale 6 = 1 CSC 12 = 2 CSCs 18 = 3 CSCs Segment Global φ Segment Global θ Segment Time log scale Segment Time 2 ns bins -200ns +200ns -200ns +200ns

DT DPG 2011 Status Studies on DT performance as a function of luminosity show our trigger/local reco efficiency is unaffected by different beam conditions For the 2012 data taking, we added in our DQM the monitoring of our calibration constants (time pedestals and drift velocity). This will allow to reduce latency between changes in conditions and a new calibration. Added a delta-rays rejection algorithm into our local reconstruction code. Delta-rays always arrive earlier to the wire → a χ2 cut improves the temporal and spacial resolution We also checked with the last part of 2011 data that our MC conditions still reproduce well our resolution in data DTLT efficiency Local reconstruction efficiency Background rates (single hit within a layer) Increased linearly with luminosity in 2011. Of course, still much below our TDR studies MB4

DT DPG Status 2012 cosmics Using MWGR2 cosmics, detector seems in good shape Number of hits per segment for horizontal layers similar to collision muons Local reconstruction efficiency Average BX expected for bottom triggering

RPC DPG 2012 Status RPCMonitor Dedicated HLT Stream for RPCDPG Studies. HV Scan 2011 Successfull all the Working Point for every Chamber are known. Automatic High Voltage correction due to pressure changes in place and working (PVSS). The correlation with pressure is gone Runs without automatic pressure correction, Runs with automatic pressure correction. With Pressure correction Without Pressure correction April 2011 October 2011

RPC Monitor Stream Detailed efficiency Maps Efficiency resolution 1cm^2. Tool to establish correlations between efficiency and gas leaks, and other problems. Chambers off are represented in white. Blue and yellow lines are lower efficiency regions due to masked/dead strips. The joints in between double gaps can be seen in yellow as well. Little squares in the corners are just ROOT legends, not an inefficient region.

RPC DPG other detector Parameters Apart from the Event (Reco RPC Hits), other parameters are monitored Run By Run by shifters at CMS Center. Like Temperature, Current and Background. DQM, WBM, Noise tool, and Efficiency offline. For 2012 HV Scan 2012 to be performed with early LHC data. RPCMonitor Stream is being tuned. Upgrade for the efficiency tool is ongoing (segment extrapolation with associated STA muons) Intrinsic Noise Rate Background Noise Tool Current Temperature WBM WBM

Relative Efficiency for muon identification with and without rpc hits 1313 Ratio vs. Eta Ratio vs. pT CMS Preliminary CMS Preliminary ε(globalMuonNoRPC) ε(globalMuonRPC) R = Muon RPC STA object under construction.

Conclusions MWGR everything is operating smoothly In 2011 Muon DPG collaboration increased (Muon DPG Paper, Muon DPG meetings on demand) Each group has specific holes in manpower for core tasks DT Calibration CSC Prompt Feedback We lack commitment for several day to day tasks so that we can count on timely support when necessary.