Moving Towards a Very High Speed Europe Eicta Position on Next Generation Access (NGA) I2010 meeting – Brdo – May 13 th & 14 th 2008 Jean Pierre Lartigue.

Slides:



Advertisements
Similar presentations
FTTH European Panorama: Status & Dynamics
Advertisements

Why does ERA Need to Flourish
Strengthening innovation in chemical clusters
OECD International Futures Programme 1 OECD Futures Project The Commercialisation of Space and the Development of Space Infrastructure: The Role of Public.
1 International CEO Forum IV Dr. Ravi Ratnayake Director Poverty and Development Division UNESCAP 17 December 2007, Bangkok REGIONAL INFRASTRUCTURE DEVELOPMENT:
Slide title In CAPITALS 50 pt Slide subtitle 32 pt European R&D.
Regional and national initiatives in support of European Technology Platforms Dr. Fiona Williams Chairman, eMobility steering board
Auvergne Regional Council Brussels RegioStars Awards 2010 Bridging the broadband gap in Auvergne: towards a 100% coverage.
Investing EU funds in Next Generation Access (NGA) Infrastructures OPEN DAYS Workshop: October 12 th 2011 Ken Ducatel DG Information Society and Media.
Hervé Dupuy Deputy Head of Unit Broadband Unit (DG CONNECT.B5)
E-Strategies and ICT Infrastructure Policies and Regulations ITU-WTO Workshop Geneva Dec Mostafa Terrab, infoDev.
Geneva, Switzerland, 22 September 2012 FTTx in Japan: Past, Present, and Prospects for the Future Ken-Ichi Suzuki, NTT Access Network Service Systems Laboratories,
February Joint Project of the ITU Telecommunication Development Bureau and Ministry of Infrastructure, Republic of Poland
Regional Forum for Europe Broadband: A Pillar of Social and Economic Development 6-7 September 2012 Sheraton Hotel, Tirana Sofie Maddens Toscano ITU Expert.
ITU Regional Development Forum - Warsaw 7 May The Radio Spectrum Policy Programme & the Spectrum Inventory Pearse ODonohue Head of Radio Spectrum.
Pacific Regional Digital Strategy II Suella Hansen & Noelle Jones Presentation for APT 28 April 2010.
Socio-economic effects of FTTH/FTTx in Sweden Crister Mattsson Acreo, Stockholm.
CoE/ARB Workshop On Infrastructure Sharing and LLU Session 4 Infrastructure Sharing Drivers and Blocks By: Isabelle Gross Khartoum – Sudan, 27 – 29 March.
Report on Inclusive Growth Pillar work
Review of Type II Interconnection Policy Press Conference 6 July 2004.
1 Understanding which market scenarios are best served by active Ethernet point-to-point (EP2P) and which are best served by point-to-multipoint PON architectures.
1 FITCE 2008 London September 23th, 2008 Next Generation Access Networks: Perspectives and regulatory options.
Matjaž Pogačnik, MBA ENGAGE Donegal workshop Letterkenny, February 12 th 2013.
Introducing Piers Daniell Managing Director
© British Telecommunications plc Next Generation Broadband Ian Shanks Head of Scottish Affairs BT Scotland.
How Governments Have Made Broadband Network Rollout Possible CANTO Conference & Exhibition 22 nd – 25 th July, 2012 – Miami Andrew Gorton Group Head of.
G Acchioni: DG Information Society and Media, Unit: Lisbon Strategy and i2010Page (1) A Digital Agenda for Europe A flagship initiative of EU2020 Strategy.
Enhancing ICT development and connectivity in Africa Erik Habers Head of Cooperation EU Delegation Nairobi.
Public Private Partnership Regulatory Aspects Christoph Legutko Global Public Policy CEE Intel Corporation November
Linking ICT with climate action for a low-carbon economy Johan Wibergh Executive Vice President, Networks Ericsson.
Botswana Policy Statement at the WSIS+10 Honourable Nonofo E. Molefhi Minister of Transport and Communications.
Digital Highlands and Islands Stuart Robertson Head of Broadband and Digital Highlands and Islands Enterprise.
09/10/2009SFERA Annual Conference 2009 Presentation of Council Main Results Rafael Mompo European University of Madrid (Laureate International Universities.
Digital Agenda Overview Anna Katarzyna Nietyksza, EESC.
The role of wireline access technologies to bridge the digital divide BB for All Cluster workshop “How to bridge the digital divide ?”
Dave Carter Head of the Manchester Digital Development Agency Innovation Creativity Knowledge.
Delivering Town Centre and wider NGA through use of a CCTV fibre optic network: the case of Colchester, Essex Jim Leask Senior Enterprise Officer Workshop.
Towards a Connected Continent: How to achieve a European Single Market for Telecommunications? Speeding up NGN ubiquity: a pillar for digital growth Athens,
Enhancing Access To, and use and Quality of, Information and Communication Technologies.
Presentation of the workshop results to the plenary session A) Strengthening rural entrepreneurship by connecting the local production with other economic.
Fibre broadband: the legacy starts today Bill Murphy Managing Director, Next Generation Access BT Group.
New Media Summit Digital Agenda, Beograd, September 2011 Challenges for the Development of Information Society in the Republic of Slovenia Mojca Jarc,
©Ofcom A regulatory perspective on FTTx deployments Chinyelu Onwurah, Head of Telecoms Technology, Ofcom 19 th June 2007 FTTx Summit.
Ireland’s Broadband Performance and Policy Actions January 2010.
National Technical University of Athens School of Electrical & Computer Engineering Government’s Intervention in NGA: The Challenges for an Information.
Regulatory issues raised by access upgrade investment: where we are in the UK debate Richard Budd Senior Regulatory, Economist, BT 16 September 2008
Importance and development of broadband access in Lithuania Paulius Vaina Communications Regulatory Authority of the Republic of Lithuania ITU Regional.
Connectivity as raw material of Digital Economy 'Challenges for telecoms in the new Internet ecosystem' BEREC-EMERG-REGULATEL-EaPeReg Summit Barcelona,
Fibre rollouts Briefing on the work currently underway 5 March 2009.
Pennine Lancashire Digital Strategy _____________________________ Steven Cochrane Head of Strategy, PLACE.
UK Broadband Regulatory Framework David Clarkson 16 th November 2011 NextGen 11 Conference, Bristol, November.
Cost sharing models of NGN rollout in rural or remote areas BEREC-EaPeReg-REGULATEL-EMERG Summit Barcelona, 2-3 July 2015.
PRIORITIES FOR eu FUNDING 2014 – 2020 IN ICT SECTOR
Lessons from a Broadband Society
1 Broadband Delivery UK NextGen10 Robert Sullivan, CEO 23 rd November 2010.
The ICT Sector in Zambia Presented by: Ministry of Communications and Transport Overview & Investment Perspective.
Transparent and predictable development of BB ASTEL Conference 2010 Sofia, 27 April 2010.
PAKAMILE PONGWANA South Africa’s International and National Competitiveness 3-4 February 2015.
Broadband for All through Universal Service? 17 June 2010, Lisbon.
Broadband Developments Stuart Robertson Competitive Locations Highlands and Islands Enterprise.
Frederic Maduraud European Commission DG Information Society OECD Workshop on Broadband Seoul, June 2002 “Exploiting the Broadband.
Community Broadband Delivering Next Gen Infrastructure.
European Commission Information Society Directorate-General «Regional aspects; International Co-operation» Regional priorities.
Municipal Networks: Competitive? Or Complementary? Brenda van Gelder Director, Virginia Tech eCorridors April 18, 2005.
Finnish NGA state-aid scheme Antti Kohtala Ministry of Transport and Communications Finland Digital Agenda Assembly, Brussels, 16th June 2011.
Inês Nolasco Senior Regulatory Affairs Manager European Competitive Telecommunications Association.
State aid for broadband Internet development in Lithuania TAIEX Multi-beneficiary Workshop on TAIEX Assistance within Chapter 10 – Information society.
Broadband Workshop Facilitating Broadband Investment French regulatory framework Bertrand Vandeputte ARCEP European Commission – DG INFSO March 23rd, 2011.
Regulation of NGA networks – the EU experience
Broadband market in Latvia
Presentation transcript:

Moving Towards a Very High Speed Europe Eicta Position on Next Generation Access (NGA) I2010 meeting – Brdo – May 13 th & 14 th 2008 Jean Pierre Lartigue - EICTA on

1. Predictions for the Future 2. Importance of NGA 3. Political push for a Very High Speed Europe 4. Removing Obstacles to Investment : Civil works and passive infrastructure sharing 5. Digital divide, Avoiding the gap: Public policy actions

1. Predictions for the Future

Consumers Growing Needs Require a Bold Approach to Very High Speed Broadband Access Future broadband - Policy approach to next generation access - OFCOM Sept 2007

2. Importance of NGA

Starting point for FTTx: The Bandwidth Equation ADSL - CO ~12 Mbps VDSL – CO ~50 Mbps FTTN - VDSL ~50 Mbps FTTB - VDSL ~100 Mbps FTTH - MDU 100 Mbps+ FTTH - SDU 100 Mbps+ Drivers: upfront CAPEX, competition, time-to-market

Two Resulting Paths to Mass Market Fibre Copper-Centric VDSL2: 30 Mlines in Mlines in 11 Fibre-centric FTTH: 12 Mlines in Mlines in 11 DSLAM (ADSL) FTTH/B >100 Mbps 25 Mbps 3-5 Mbps 100% 85% Reha b Greenfield Coverage VDSL2 50 Mbps ADSL2+ Fixed Wireless DSLAM (ADSL) FTTH/B >100 Mbps 25 Mbps 3-5 Mbps 100% 85% Reha b Greenfield ADSL2+ Fixed Wireless Coverage

Various Strategies Observed to Mix VDSL and FTTH FTTH & FTTN FTTH/B FTTH CO VDSL2 & FTTH FTTH FTTN VDSL2 Greenfield VDSL2 FTTH FTTH only FTTB/VDSL2 & FTTH

3. Political Push for a Very High Speed Europe: The Cases of UK and France

Example of National Initiative: UK Very High Speed Broadband Projects Case Analysis South Yorkshire Digital Region Four local UK authorities in South Yorkshire region created Digital Region project Create BB infrastructure to spur economic regeneration and bridge Digital Divide The project will sell wholesale access to ISPs using FTTC with speeds up to 50MBit/s Provide NGA to homes (i.e 1.3M citizens) and businesses across region Case Analysis BT and Ebbsfleet trial BT Openreach: fibre local access at Ebbsfleet Valley in North Kent in a new build zone The trial is intended to gauge what demand exists for very high speed broadband Connect homes, 6M feet of commercial space and 3 M ft of retail, leisure and community facilities with speeds of up to 100 Mbit/s This will be offered on a wholesale basis to all UK Communications providers

Example of National initiative: French Very High Speed Forum Recommendations Aim: 4M subscribers by 2012 with measures to reduce costs 1. Reduce the cost of wiring buildings Measure 1: Ensure the pre-wiring of new buildings Measure 2: Facilitate operators access to existing buildings Measure 3: Ensure that « in-building » wiring is shared among between operators 2. Reduce civil engineering costs Measure 4: Regulate duct offers Measure 5: Facilitate operator access to existing ducts (electricity, telecoms, sewers…) Measure 6: Promote VHS BB for businesses with the creation of a Very high-speed business area label Measure 7: Allow favorable (public domain) fees for empty or shared ducts Measure 8: Improve knowledge of existing ducts by public domain managers 3 - Ensure access for all Measure 9: Ensure that part of the digital dividend benefits to rural areas 4 - Reinforce R&D and the development of usages Measure 10: Reinforce R&D and development of innovative VHS BB service with competitive clusters Measure 11: Set up one or more large- scale experimental platforms, supporting pilot VHS pilot services

4. Removing Obstacles to Investment : Improving cost of civil works and Passive infrastructure sharing

A Mix of Market and Policy approaches will be needed SUBURB-1 Risky business case RURAL-1 No business case CAPITAL Positive business case RURAL-2 RURAL-3 URBA N MARKET DRIVEN Fast service take rate Mass market dense area Natural competition POLICY DRIVEN Underserved BB area High cost/subscriber No private FTTH URBA N Alternative private fibre networks in many European Capitals Open community networks required in underserved areas

Public funding is key to achieve 100% coverage Optional: Dark fiber roll-out Private Sector Labeling / Pre- cabling Access to public infrastructure Public Sector Optional: IP Wholesale Dark fiber roll- out and renting Labeling / Pre- cabling Build of Primary infra Market Driven e.g. Tier 1 cities Risk Driven e.g. Tier 2 & suburban Policy Driven e.g. rural Investment (%) Area types Retail, Service applications, Network Retail, service applications Network & IP Wholesale Retail, Service applications, Network, infra resources Access to public infrastructure 100% Total Pay back~4 years~8 years> 20 years Civil work~600 /subs~1200/subs~4000 /subs

Several practices of sharing in progress Market DrivenPolicy Driven FFP CO Sharing Dark Fiber in the Building Fiber Flexibility Point Building Private Wholesaler Local community as IP Wholesaler CO SPxSP2SP1 Building owners Public Private Risk Driven Joined re-use of ducts or dark fibre CO Ducts / fiber Private

National public coordination must be promoted And already active in several Member States Government Ministries of Industry, Housing, civil Works, Economy,… Telecom Industry Local Communities Municipal network managers Market experts Network operators incumbent and CLECs

Need to Reduce Passive Infrastructure Costs 5%20%10% 15% Passives Total 50 % Trench Sharing Ducting Aerial Local Coherence: Investors Coverage Reference Agenda Civil Works Optimised Civil Engineering IMPACT FACTORS

5. Digital Divide – Avoiding the Gap: Public Policy Actions

Recommendations on Public Policy Actions European institutions should invite Member States to adopt pro- active policies aimed at spurring NGA investment and preventing the Digital Divide through: 1- Creation of Next Generation Access Forums Must address deployment in suburban and rural areas 2- Establishment of national Very High Speed Broadband Strategies Need broadband coverage to 30% European population by 2010 and 40% European population with Very High Speed by Close involvement of local communities in the definition of Very High Speed broadband strategies Public Funds should be encouraged to support local investment in ICT infrastructure open to all players

Recommendations on Public Policy Actions cont 4- Confirmation of technology and architectural neutrality Fibre paradigm is different from copper and need flexible approaches according to investment requirements 5- European institutions need to play an active role by supporting local communities in above mentioned actions EICTA invites them to create public forums addressing best practices for NGA deployment in urban, sub-urban and rural areas