Introduction Jason Tarrant – Integration Engineering Step IV Removal

Slides:



Advertisements
Similar presentations
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Advertisements

MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
1 Technical Co-ordination, Phase One The shared post of PM/TC has worked quite well Six months ago there was much for us to learn:  Revised the WBS 
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
1 MICE Hydrogen system Working group mtg – 01/09/14.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Resource Loaded Schedule and Budget Profile
Update on PANDA solenoid design
Status of the MICE Construction Project
IT-4189 Supply and installation of a cryogenic distribution system
RF Layout 3pi/2 for Discussion
MICE Partial Return Yoke Mechanical Design
Step IV PRY Preparation - Contents
UK Financial Plan & Risks
MICE CM31 Schedule summary
The 11T cryo-assembly: summary of design and integration aspects
Experimental equipment Edgar L. Black February 17, 2019
Presentation transcript:

Introduction Jason Tarrant – Integration Engineering Step IV Removal Cooling Demo Preparation Cooling Demo Installation March 2016

Most change in this region Dismantle Step IV Most change in this region

Preparation PRY Base design Removal of these panels for RF access Change to only 3 leg + trimming of current parts New ~As-is (but 3 leg) As-is New Changes As-is

RF devices removed on moving platforms Preparation Partial Return Yoke (PRY) – RF Access Recent decision to remove this upper middle panel for major south side experimental access to increase safety RF devices removed on moving platforms

Additional ramp cut for PRY bases & Tracker Cryo units Preparation Concrete ramp cutting S W E N Beam Direction Additional ramp cut for PRY bases & Tracker Cryo units SSU & PRY not changing

Preparation False Floor & Sub Structure Sub floor supports to be changed for compatibility with PRY interfaces (& current underlying services in this area)

Cuts & supports for RF Amplifiers & Coax Preparation North Mezzanine Changes Cuts & supports for RF Amplifiers & Coax

Hinged front edge to be removed Sub-structure & services changes Preparation South Mezzanine Changes Holes for RF H2 removed Hinged front edge to be removed Sub-structure & services changes

Preparation Moving Platform Baseplates (G Stokes, N Collomb) New New Altered New New Moved As-is

Sub floor plates, levelled & fixed Preparation False Floor & Sub Structure Sub floor plates, levelled & fixed

Preparation Moving Platform Install fitting & dry run (G Stokes, N Collomb) Moved New New New Moved As-is

Preparation Services management fixings Preparations for services management for: Magnet power & instrumentation (DL) High pressure compressor hoses (P Barclay) RF Coax (A Muir) Vacuum (M Tucker, P Barclay) Etc…

Preparation RF – X-Ray Shielding Review & Actions MICE-ISIS RF Working Group: M Keelan, T Stanley, K Ronald, A Moss… = Review of x-ray shielding requirements - Document - Design - Agree etc.

Preparation Deep Clean

Installation Moving Platform Install (G Stokes, N Collomb)

Installation MICE Cooling Demo Experiment Compensating bellows?

Secondary absorber (N Collomb) Installation MICE Cooling Demo Experiment – New devices & components Primary Absorber RF Device (A DeMello, T Loew, A Lambert) Secondary absorber (N Collomb)

Installation Partial Return Yoke (PRY) – H Witte, S Plate

Installation RF System

Magnet cables, compressors hoses etc. Installation …& other Services Vacuum Magnet cables, compressors hoses etc.

Installation PRY North Side Access Platform

Layout, Design, Review, Tender Manufacture, Acceptance Schedule Schedule Longer Lead Items e.g. Primary Absorber Vessel (not standard m/c contractor = longer tender?) PRY Bases (large no. of components ready to go from mid -2016) Layout, Design, Review, Tender Manufacture, Acceptance Prep Step IV running Install Step IV running Integration Engineering – Working Schedule

Design

Conclusion Engineering changes from Step IV to Cooling Demo Majority of engineering changes based on existing Step IV systems e.g.: Most services, PRY, PRY interfaces, Moving platforms ... ‘New’ work mostly related to RF system, e.g.: RF devices, RF coax routing, Amplifiers, X-Ray shielding… A lot of work already completed for Cooling Demo engineering All of the above ‘owned’ and design progressing well (most detailed / released, incl. analysis & even manufacture e.g. PRY support wedge system) System interactions being managed (Integration Engineering) Long lead items being identified for more immediate work, e.g. Absorber vessel (outstanding vacuum interactions) PRY interfaces (outstanding vacuum interactions & RF access) Both these = drawings complete, final analysis / review being undertaken