Denver Fire Alarm Test FUNDAMENTAL, POWER SUPPLIES, CIRCUITS, INSPECTIONS, TESTING and MAINTENANCE.
Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
Denver Fire Alarm Test Preparation Speed Drill © Ted Smitty Smith 2013.
NFPA 72 - National Fire Alarm Code Chapter 4 - Notification Appliances
NFPA 72 and NFPA 101 Supervised Automatic Sprinkler System Overview
Fired And Unfired Pressure Vessels
State Fire Marshal Question and Answer Session with the Louisiana Automatic Fire Alarm Association March 19, 1999.
Aspirated Smoke Detection
LOUISIANA DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS
2015 Update to OBC September 17, 2014.
Ted “Smitty” Smith  I have included in the following slides some key sections from each of the codes you will primarily encounter on the test. I recommend.
Basic Fire & Life Safety for Radiation Safety Professionals Robert Emery, DrPH, CHP, CIH, CSP, RBP, CHMM, CPP, ARM Vice President for Safety, Health, Environment,
© Siemens Industry, Inc Confidential / Drive Your Business Forward Ignite the Power of New Products and Partnerships Siemens Fire Partner Summit.
Four Learning Objectives Understand Smoke Control Theory Understand Design Methods Know Your Role in Commissioning Tests Be Familiar with Hardware, Test.
High-Rise Hotels New Codes General Fire Safety Information Ted Erb Fire Prevention Officer Bellevue Fire Department April
N.F.P.A. 13R Justin Bohlmann FIR-204.
Elevators & Fire Alarm Systems: Understanding Interface Requirements Presented by: Antonio Torres- North Central Regional Sales Manager.
Cancer Center Training 2012 Cancer Center Training 2012 “Defend in Place” Strategy for Fire Alarm Activations Cancer Center Building #7559.
Basic Fire Alarm Systems Overview
AUTOMATIC SPRINKLERS.
Prevent False Alarms Eugene A. Cable, P.E., M.S.F.P.E. Life Safety Consultants NEHES Honorary Member 412 Horse Heaven Road Averill Park, New York
Retirement Home Regulated under the Retirement Home Act, 2010.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
FIRE ALARM SYSTEMS AND FUNDAMENTALS
WELCOME DBI & SFFD Meet the Pros October 11, 2007.
Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code, The National.
Chapter 14: Inspection and Maintenance
EGRESS AND FIRE PROTECTION
© 2012 Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code and the.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
© 2015 American Society for Healthcare Engineering, a personal membership group of the American Hospital Association 155 N. Wacker Drive, Suite 400 | Chicago,
MINNESOTA CHAPTER AUTOMATIC FIRE ALARM ASSOCIATION Requirements of the 2003 Minnesota State Fire Code relating to Group R Occupancies September 14, 2006.
Fire Protection Systems Chapter 6. Fire Protection Systems Most of the time you will work with an electrical engineer or fire-protection designer to coordinate.
Area of Refuge It’s the Law!
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
1 © 2015 Eaton. All Rights Reserved.. Suggestion on How to Use Industry Trainers are encouraged to use this material in their sessions Download the presentation.
Work Area Method Level 3 Alterations – Chapter 9 prescribes requirements. 50% of Building Area Rule.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Fire Alarm Verification CAN/ULC-S561-03
Elevator Fire Service Mode Basic Operations Prepared by: Lt. Rob Fisher – L72C.
Class A, B, and now N NFPA 72, 2016 Edition Dan Horon President
Louisiana AFAA Quarterly Meeting State Fire Marshal Questions
Steve Griffith February 28th, 2017
Chapter 8. Electrical Systems
Carbon Monoxide Detection: Code and Legislation Updates
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
Department of University Safety & Assurances
Proposed Changes to the 2009 International Building & Fire Codes
NICET Fire Alarm Tech Level 1 Practice Test
Borbotech BV • Tel.: +31(0) • •
NICET Fire Alarm Tech Level 1 Practice Test # 6
AUTOMATIC SPRINKLERS.
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Decree of the Ministry of Interior 3rd August 2015 The “so called” Italian Fire Prevention Code - IFC: S7 – Fire Detection and Alarm Systems Piergiacomo.
Building and Fire Codes
Fire Prevention Safety Department
MINNESOTA STATE FIRE MARHSAL DIVISION HEALTHCARE TEAM
Chapter 8. Electrical Systems
NICET Fire Alarm Tech Level 1 Practice Test # 10
General Requirements of NFPA 101
Presented by: Tim Knisely
NFIRS 3 Structure Fire Module
Fire Alarm Tech Practice Test # 16 NICET
Area of Refuge It’s the Law!
National Fire Protection Association Update
Fire Prevention Coffee Break Training
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
FIRE ALARM DRILL 26 © Ted Smith 2017.
Denver Fire Depart. License Fire Alarm Practice Test # 12
Presentation transcript:

Fire Alarm Systems for Emergency Operations of Elevators Requirements of the International Building Code – 2003 Prepared by Robert P. Yerger Berkshire Systems Group, Inc.

Goals of Presentation Follow the Code requirements of the IBC as adopted by the Commonwealth of Pennsylvania for Fire Alarm Systems controlling of Elevators. Assist those that design, propose, program, install and commission, and approve fire alarm systems for elevator control and operation. Only the fire alarm system requirement is covered, not the actual elevator operation and controls is covered in the presentation.

Disclaimer The information provided in this presentation is based on the understanding of the various codes and standards by representatives of Berkshire Systems Group, Inc., and does not represent an official requirement. In addition, Authorities Having Jurisdiction, (AHJ’S) may interpret and/or require installation and operation that is different than that expressed in this presentation.

International Building Code (IBC) 2003 Chapter 30 Elevators and Conveying Systems 3003.2 Fire-fighters emergency operation. Elevators shall be provided with Phase I emergency operation and Phase II emergency in-car operation in accordance with ASME A17.1. (Chapter 35 – Referenced Standards, references the 2000 version of A17.1)

The American Society of Mechanical Engineers (ASME) Safety Code for Elevators and Escalators A17.1 – 2000 Edition 2.27.3.1 Phase I Emergency Recall Operation. A17.1b-1989 through A17.1b-1992 required Phase I for an elevator with a travel of 25 ft. or more. Previous versions of the code allowed travel up to 50ft. before Phase I was required. These new requirements apply for all automatic elevators except when the hoistway or a portion thereof is not required to be constructed of fire-restive construction, the travel does not exceed 2,000 mm or 80 in., and the hoistway does not penetrate a floor.

(ASME) A17.1 – 2000 Edition 2.27.3.2.1 The reference to the National Fire Alarm Code, NFPA 72 is to a standard with expertise to specify the type and installation of automatic initiating devices. The NFPA has been revised, at the request of the ASME A17 Committee, to address fire alarm systems in all building types. Beginning with ASME A17.1b-1997 a fire alarm initiating device must be provided at all floors. ASME A17.1 recognizes that devices other than smoke detectors may be more appropriate under some conditions. These conditions are specified within NFPA 72.

(ASME) A17.1 – 2000 Edition 2.27.3.2.4 The effectiveness of smoke detectors for the recall function has also been questioned because of the possibility that smoke may be present on floors above and/or below the fire floor. The Code has addressed this in 2.27.3.2.5 by indicating that the first smoke detector activation determines the recall level. 2.27.3.2.5 This requirement specifically states that the elevator only need to respond to the first detector, which was activated.

(ASME) A17.1 – 2000 Edition NFPA 72 (1999) 3-9.3.1 System-type smoke detectors or other automatic fire detection as permitted by 3-9.3.5 located in elevator lobbies, elevator hoistway, and elevator machine rooms used to initiate fire fighters’ service recall shall be connected to the building fire alarm system.

(ASME) A17.1 – 2000 Edition NFPA 72 (1999) 3-9.3.1 (Contd.) In facilities without a building fire alarm system, these smoke detectors or other automatic fire detection as permitted by 3-9.3.5 shall be connected to a dedicated fire alarm system control unit that shall be designated as “elevator recall control and supervisory panel”, permanently identified on the control unit and on the record drawings.

(ASME) A17.1 – 2000 Edition NFPA 72 (1999) 3-9.3.1 (Contd.) Unless otherwise required by the authority having jurisdiction, only the elevator lobby, elevator hoistway, and the elevator machine room smoke detectors or other automatic fire detection as permitted by 3-9.3.5 shall be used to recall elevators for fire fighters’ service.

(ASME) A17.1 – 2000 Edition A3-9.3.1 In facilities without a building alarm system, dedicated fire alarm system control units are required by 3-9.3.1 for elevator recall in order that the elevator recall systems be monitored for integrity and have primary and secondary power meeting the requirements of this code. The control unit used for this purpose should be located in an area that is normally occupied and should have audible and visible indicators to annunciate supervisory (elevator recall) and trouble conditions: however, no form of general occupant notification or evacuation signal is required or intended by 3-9.3.1

(ASME) A17.1 – 2000 Edition NFPA 72 (1999) 3-9.3.2 Each elevator lobby, elevator hoistway, and elevator machine room smoke detector or other automatic fire detection as permitted by 3-9.3.5 shall be capable of initiating elevator recall when all other devices on the same initiating device circuit have been manually or automatically placed in the alarm condition. (We would strongly recommend that an addressable system be supplied for elevator recall operation to assure that all required functions can operate simultaneously and to take advantage of the many additional features addressable systems provide.)

(ASME) A17.1 – 2000 Edition NFPA 72 (1999) 3-9.3.3 A lobby smoke detector shall be located on the ceiling within 21 ft. of the centerline of each elevator door within the elevator bank under control of the detector. Exception: For lobby ceiling configurations exceeding 15 ft. in height or that or than flat and smooth, detector locations shall be determined in accordance with Chapter 2. (NFPA 72)

(ASME) A17.1 – 2000 Edition NFPA 72 – 1990 Edition 3-9.3.4 Smoke detectors shall not be installed in elevator hoistways. Exception No. 1: Where the top of the elevator hoistway is protected by automatic sprinklers. Exception No. 2: Where a smoke detector is installed to activate the elevator hoistway smoke relief equipment.

(ASME) A17.1 – 2000 Edition 3-9.3.4 Smoke detectors installed in elevator hoistways require continuous maintenance and are a source of numerous false or nuisance alarms. For this reason, the code has specifically excepted them from the elevator hoistway unless the top of the hoistway is protected by an automatic sprinkler system. If sprinklers are installed at the top of the hoistway, then the smoke detector is needed to provide the recall feature before the heat detector or waterflow switch on the hoistway sprinkler system actuates.

(ASME) A17.1 – 2000 Edition NFPA 72 – 1990 Edition 3-9.3.5 If ambient conditions prohibit installation of automatic smoke detection, other automatic fire detection shall be permitted. Some Options: Fixed temperature heat detection Rate compensated heat detection (for exterior, damp and wet locations) Air aspiration systems (Vesda)

(ASME) A17.1 – 2000 Edition 3-9.3.6 When actuated, each elevator lobby, elevator hoistway, and elevator machine room smoke detector or other automatic fire detection as permitted by 3-9.3.5 shall initiate an alarm condition on the building fire alarm system and shall visibly indicate, at the control unit and required remote annunciators, the alarm initiation circuit or zone from which the alarm originated.

(ASME) A17.1 – 2000 Edition NFPA 72 – 1990 Edition 3-9.3.6 (Contd.) Actuation from elevator hoistway and elevator machine room smoke detectors or other automatic fire detection as permitted by 3-9.3.5 shall cause separate and distinct visible annunciation at the control unit and required annunciators to alert the fire fighters and other emergency personnel that the elevators are no longer safe to use. Actuation of these detectors shall not be required to actuate the system notification appliances where the alarm signal is indicated at a constantly attended location.

(ASME) A17.1 – 2000 Edition NFPA 72 – 1990 Edition 3-9.3.6 (Contd.) The detectors located in the elevator hoistway and elevator machine room actuate Phase I elevator recall, but are not required to sound the building evacuation alarm. Exception: If approved by the authority having jurisdiction, the elevator hoistway and machine room smoke detectors shall be permitted to initiate a supervisory signal.

Requirement for Monitoring of Fire Alarm Systems - IFC Definition of Fire Alarm System (IFC 902.1) A system or portion of a combination system consisting of components and circuits arranged to monitor and annunciate the status of fire alarm or supervisory signal-initiating devices and to initiate the appropriate response to those signals. Monitoring (IFC 907.15) Where required by this chapter or by the International Building Code, an approved supervising station in accordance with NFPA 72 shall monitor fire alarm systems. (There are some exceptions that don’t apply)

(ASME) A17.1 – 2000 Edition 3-9.3.6 (Contd.) The exception option of 3-9.3.6 should only be used where trained personnel are constantly in attendance and can immediately respond to the supervisory signal and investigate the cause of the signal. Means should be provided for initiating the fire alarm signal if the investigation of the cause of the supervisory signal indicates that building evacuation is necessary.

(ASME) A17.1 – 2000 Edition 3-9.3.6 (Contd.) In addition, to having trained personnel constantly in attendance, it is recommended that if the supervisory signal is not acknowledged within a given period of time (3 minutes to 10 minutes), the fire alarm system will automatically and immediately initiate an alarm.

(ASME) A17.1 – 2000 Edition NFPA 72 (1999) 3-9.3.7 For each group of elevators within a building, three separate elevator control circuits shall be terminated at the designated elevator controller within the group’s elevator machine room(s). The operation of the elevators shall be in accordance with ANSI/ASME A17.1. The smoke detectors or other automatic fire detection as permitted by 3-9.3.5 shall actuate the three elevator control circuits as follows:

(ASME) A17.1 – 2000 Edition NFPA 72 (1999) 3-9.3.7 The smoke detector or other automatic fire detection as permitted by 3-9.3.5 located in the designated elevator recall lobby shall actuate the first elevator control circuit. In addition, if the elevator is equipped with front and rear doors, the smoke detectors in both lobbies at the designated level shall actuate the first elevator control circuit. (This is the alternate floor recall)

(ASME) A17.1 – 2000 Edition NFPA 72 (1999) 3-9.3.7 The smoke detector or other automatic fire detection as permitted by 3-9.3.5 in the remaining elevator lobbies shall actuate the second elevator control circuit. (This is the primary, key switch level, floor of return) The smoke detector or other automatic fire detection as permitted by 3-9.3.5 in elevator hoistways and the elevator machine room(s) shall actuate the third elevator control circuit. In addition, if the elevator machine room is located at the designated level, its smoke detector or other automatic fire detection as permitted by 3-9.3.5 shall also actuate the first elevator control circuit.

(ASME) A17.1 – 2000 Edition 3-9.3.7 The third circuit will sound a warning in the elevator cab (Fire Hat) to notify the fire department personnel using the elevators on Phase II Operation during the fire to immediately move to a safe floor and exit the elevator.

NFPA 13 (1999) Elevator Shutdown A-5-13.6.2 ASME A17.1, Safety Code for Elevators and Escalators, requires the shutdown of power to the elevator prior to the application of water in elevator machine rooms or hoistways. This shutdown can be accomplished by a detection system with sufficient sensitivity that operates prior to the activation of the sprinklers (see also NFPA 72). As an alternative, the system can be arranged using devices or sprinklers capable of effecting power shutdown immediately upon sprinkler activation, such as a waterflow switch without a time delay. This alternative arrangement is intended to interrupt power before significant sprinkler discharge.

NFPA 13 (1999) Elevator Shutdown 5-13.6.3 Upright or pendent spray sprinklers shall be installed at the top of elevator hoistways. 5-13.6.2 Automatic sprinklers in elevator machine rooms or at the tops of hoistways shall be of ordinary (155 degrees) or intermediate (165 degrees) temperature rating.

NFPA 72 & 13 – 1999 Edition Elevator Shutdown 3-9.4.1 Where heat detectors are used to shut down elevator power prior to sprinkler operation, the detector shall have a lower temperature rating and a higher sensitivity as compared to the sprinkler.

NFPA 72 - 1999 Edition Elevator Shutdown 3-9.4.2 If heat detectors are used to shutdown elevator power prior to sprinkler operation, they shall be placed within 2 ft. of each sprinkler head and be installed in accordance with the requirements of Chapter 2. Alternately, engineering methods, such as specified in Appendix B, shall be permitted to be used to select and place heat detectors to ensure response prior to any sprinkler head operation under a variety of fire growth rate scenarios.

NFPA 72 - 1999 Edition Elevator Shutdown 3-9.4.3 If pressure or waterflow switches are used to shutdown elevator power immediately upon or prior to the discharge of water from sprinklers, the use of devices with time delay switches or time delay capability shall not be permitted.

NFPA 72 - 1999 Edition Elevator Shutdown 3-9.4.4 Control circuits to shut down elevator power shall be monitored for presence of operating voltage. Loss of voltage to the control circuit for the disconnecting means shall cause a supervisory signal to be indicated at the control unit and required remote annunciators.

Elevator Recall Matrix Alarm Condition Origin Alternate Floor Relay Primary Floor Relay “Fire Hat” Relay Primary Level (Key Sw.) Elevator Lobby X Detector All Other Elevator Lobby X Detectors – Elevator Machine Room or Hoistway - On Primary X X Level – Detector(s) Or Hoistway Not On X X Primary Level -Detector(s)