Online Software Status

Slides:



Advertisements
Similar presentations
Questionnaire Response
Advertisements

The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Cluster Processor Module : Status, test progress and plan Joint Meeting, Mainz, March 2003.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Overview We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger trackfinder data through an XDAQ Event Builder.
Uli Schäfer 1 JEM Test Strategies Current plan: no JTAG tests at R&S  initial tests done at MZ Power-up / currents Connectivity tests (JTAG) per (daughter)
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
Gnam Monitoring Overview M. Della Pietra, D. della Volpe (Napoli), A. Di Girolamo (Roma1), R. Ferrari, G. Gaudio, W. Vandelli (Pavia) D. Salvatore, P.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
Software installation for commissioning tests Olivier Deschamps Calorimeter commissioning meeting – 05 april 2007.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Multistep Runs with ROD Crate DAQ Murrough Landon, QMUL Outline: Overview Implementation Comparison with existing setup Readout Status ModuleServices API.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
LAr Testbeam Offline Software Status and Plans Combined-Combined TB Meeting 16 June 2003 Rob McPherson University of Victoria.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
TDAQ status and plans for 2008 Carlos Solans TileCal Valencia meeting 17th December 2007.
ATLAS Detector Resources & Lumi Blocks Enrico & Nicoletta.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Phases: to be 2 or to be B? The question of new timescales ● L1Calo phase 2 → phases B and C? ● Implications for design ● Example timescales ● Organising.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
Online Software Status ● Overview ● Recent Changes ● Required Changes ● Desirable Changes ● Upgrade ● Summary Murrough Landon 1 July 2009.
L1Calo Databases ● Overview ● Recent Activitity ● To Do List ● Run types Murrough Landon 4 June 2007.
Online Database Developments ● Overview ● OKS database status and plans ● COOL database developments ● Validating calibrations ● Tools ● Summary Murrough.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
Multi-step Runs – an L1Calo Perspective
Rainer Stamen, Norman Gee
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Online Database Work Overview Work needed for OKS database
Calibration Status Energy Calibration Stabilities/instabilities
Project definition and organization milestones & work-plan
L1Calo Joint Meeting The beginning…
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Run Control (and Other) Work
DAQ for ATLAS SCT macro-assembly
Online Database Status
Online Software Status
ATLAS L1Calo Phase2 Upgrade
Conditions Database Current conditions folders Proposed new folders
Online Software Status
Recent Online SW/DB Changes
Online SW Readiness (or not)
Online SW, DB & Calibration
Remaining Online SW Tasks
Level 1 (Calo) Databases
Online SW and Database Status
Test-rigs outside CERN
Cabling Lengths and Timing
Workshop Summary Dirk Duellmann.
Online Software “To Do” List
Level-1 Calo Monitoring
ATLAS: Level-1 Calorimeter Trigger
Joint Meeting Wrap-up I’ve cheated Partially justified?
CPM plans: the short, the medium and the long
The Performance and Scalability of the back-end DAQ sub-system
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Online Software Status Murrough Landon 9 November 2006 Overview Summary of recent work To do list Getting on with it...

Overview “Online software”: all SW needed to configure the system for data taking, to collect & monitor data during a physics run, also for doing special test runs, Basic frameworks provided by TDAQ group L1Calo Online SW customises these Also with some custom libraries and SW of our own Main categories include: Databases: configuration, connectivity, conditions Module Services: low level access to VME modules Simulation: for testing the system outside physics runs Monitoring: checking quality of data, also for calibrations Controls: state transition actions, user interfaces, errors

Overview of Status Databases Much exists in DAQ database (OKS), needs moving to COOL (offline conditions DB) for final ATLAS Lots of work still to do here Module Services Exists for all modules for some time – optimise a bit? Simulation Also stable for a long time – tweak for large scale test? Monitoring Lot of work started recently, move to GNAM framework Controls Not much change since the “slice tests” Should move to updated frameworks (RCD!)

Recent Activity Mostly covered in other talks PPM Calibration/Monitoring Body of software mainly aimed at calo signal testing with the intention that this develops into calo calibration Previously script based system with VME readout of PPMs Now (almost completed) move to ROD based readout with processing in GNAM monitoring framework under control of “run plan” GUI For details and remaining issues, see talks by Florian, Victor Still needs connection to conditions database Run plan implementation may also need evolution to connect it to databases and run together with calorimeters

To Do List (1) Databases Plenty of work, see DB talk Monitoring/Calibration Complete PPM (timing) calibration setup work Not yet tested with signals Save results in COOL Need to migrate or update other calibrations Eg CPM/JEM input timings for the whole system So far only standalone programs, no DB connection CMM calibration DB work done (may need update) but not in GNAM Simulation Test vectors for large scale integration tests?

To Do List (2) Module Services Some updates for forthcoming DB changes Optimisations for speedy start in full crates Controls Interminably delayed move to RCD controllers Rethink L1Calo panels in DAQ user interface (IGUI)? Run plans & joint runs with calorimeters New TDAQ error handling and exceptions Offline Online SW needs work in many areas, but exists and runs However we have NOTHING to look at our data offline We need quick checks of our data using ATHENA Now that bytestream decoders exist this should now be possible Possibly also ATHENA based monitoring in the Event Filter?

Getting on with it... Experts weeks Very useful to gather experts in one place to work together on one aspect of the software Set requirements beforehand and what we hope to achieve Recent GNAM week made useful progress Though not as much as we had hoped, another one certainly needed We discussed a database experts week: 27 Nov or 11 Dec Prefer 27 Nov, but not everyone can make it Maybe just declare two general SW experts weeks? Continue this style next year with SW integration weeks? Is there overlap/conflict with system integration? Avoid cabling weeks, leave some gaps for CERN people to recover Possible dates for next year: 22 Jan, 12 Feb? NB Geneva motor show mid March – book hostel in early January!