Bertus Janse van Rensburg Equipment Stability and the Effect Thereof on Service Delivery: Case Study - Medi-Clinic.

Slides:



Advertisements
Similar presentations
POWER in Integrating SmartOffice 3.5X within a Hosted Environment POWER in Integrating SmartOffice 3.5X within a Hosted Environment The Wachovia Insurance.
Advertisements

Making the System Operational
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Workshop Technical Services and Field Service Review March 12 th, 1pm-4pm PST Objectives –Educate ASP Field Service and Technical Service teams on BtB.
IT Asset Management Status Update 02/15/ Agenda What is Asset Management and What It Is Not Scope of Asset Management Status of Key Efforts Associated.
[Organisation’s Title] Environmental Management System
HACCP Manager Software™
AUSTRIAN CONCESSIONAL LOANS Upgrading an Existing Hospital in Tirana, Albania A Case Study.
Click a NOTUS Suite- product for a short description NOTUS REGIONAL NOTUS Regional helps regions perform the tasks related to the reimbursement of providers.
MTS Delivery Development © 2009 IBM Corporation EMEA GLOBAL Total Microcode Support (GTMS)
Project Change Management
Ambition in Action. Ambition in Action HEAD TEACHER DEVELOPMENT PROGRAM – FINANCAIL MANAGEMENT.
Managing the Information Technology Resource Jerry N. Luftman
Software Project Transition Planning
SAP R/3 Materials Management Module
Compliance Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
Chapter 11 OFFICE MANAGEMENT.
Development and Quality Plans
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Facilities Management Category Management Plan Synopsis Version 1.1 (March 2015)
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
Solution Overview for NIPDEC- CDAP July 15, 2005.
S/W Project Management
SPACE ADMINISTRATION IN HIGHER EDUCATION INSTITUTIONS – BARRIERS AND OPPORTUNITIES Jean Skene Director: HEMIS Department of Higher Education and Training.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
BSBPMG504A Manage Project Costs Basic Principles of Cost Management Project cost management is traditionally a weak area in many projects Project Managers.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
1 Permits, Licenses and Inspections Regional Project Introductions: Home Builders & Remodelers Association of Cape Cod State Project Sponsor & Technical.
ISO OPERATIONAL CONTROL
Asset & Security Management Chapter 9. IT Asset Management (ITAM) Is the process of tracking information about technology assets through the entire asset.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Immovable Assets Unbundling. Purpose The Fixed Asset Register does not function independently of the other financial and management systems. A comprehensive.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Delmar Learning Copyright © 2003 Delmar Learning, a Thomson Learning company Nursing Leadership & Management Patricia Kelly-Heidenthal
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Security Policies and Procedures. cs490ns-cotter2 Objectives Define the security policy cycle Explain risk identification Design a security policy –Define.
IT Governance: COBIT, ISO17799 & ITIL. Introduction COBIT ITIL ISO17799Others.
ASSOCIATED BENEFITS OF mSCOA IN THE ASSET LIFE CYCLE
Information Security 14 October 2005 IT Security Unit Ministry of IT & Telecommunications.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Process of Planning, Designing and Financing a Hospital
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Chapter 12 The Network Development Life Cycle
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section A 1.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
BSBPMG403A Apply Cost Management Techniques Apply Cost Management Techniques Introduction to Project Cost C ertificate IV in Project Management Qualification.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
ITIL® Service Asset & Configuration Management Foundations Service Transition Thatcher Deane 02/17/2010.
THEME: EMPOWERING FACILITY MANAGEMENT AND HEALTHCARE TECHNOLOGY IN KENYA TOPIC:MEDICAL EQUIPMENT MANAGEMENT DATE’13/11/2013 BY MILLICENT ALOOH.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Welcome & Introductions. Asset, Facilities, Contract Management and Helpdesk.
Presenter: Igna Visser Date: Wednesday, 18 March 2015
Project Cost Management
Auditing & Investigations II
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
BA Continuum India Pvt Ltd
Basic Principles of Cost Management
Chapter 18 Maintaining Information Systems
SAP CS INTRODUCTION SAP Customer service is a highly integrated process module which involves a strong integration of SAP PM,SD,MM,FICO and PS. The scenarios.
Completing the Tests in the Acquisition and Payment Cycle: Verification of Selected Accounts Chapter 19.
The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
Ward Stock Management Guide
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Healthcare Technology Management Solution
Presentation transcript:

Bertus Janse van Rensburg Equipment Stability and the Effect Thereof on Service Delivery: Case Study - Medi-Clinic

MCC is here and here

Medi-Clinic Southern Africa Overview 53 Hospitals in South-Africa and Namibia Over 7000 Licensed beds 258 Theatres Over 600 ICU and High Care beds Replacement Value of Physical Assets: R Billion Replacement Value of Buildings: R Billion Total Staff of Projected Revenue of over R 8 Billion

On Key Overview before Project Introduced in 1998 at Panorama (version 1.4) Re-installed three times at Panorama due to development work Installed at 28 hospitals with access by regional and head office Covers ± 80% of beds in group On Key Version 3 Individual databases at each site

EAMS Project Overview Version upgrade to On Key 4 – Central Database Assets identification and verification 3 Teams deployed consisting of 5 members each Each team is allocated a hospital Estimated average duration per hospital of 6 weeks 26 Hospitals and 5 Office complexes completed 59 % of Operational beds installed

Equipment Stability – Categorise Assets CATEGORY # 1 – LIFE SUPPORT All equipment where a failure would create a risk to the patients’ life whether directly or indirectly. Maintained according to the manufacturers instruction by the agent or an authorised representative or a person appointed by Medi-Clinic Medi-Clinic Policy

Equipment Stability – Categorise Assets CATEGORY # 2 – STRATEGIC All equipment where a failure would cause gross inconvenience to our clients, large negative financial impact or significant effect on the service we provide. Maintained according to Medi-Clinic policy in-house by our staff, the agent or a contractor appointed by Medi-Clinic Medi-Clinic Policy

Equipment Stability – Categorise Assets CATEGORY # 3 – GENERAL All equipment not falling in the preceding categories. Failure of this equipment still has an overall effect on the service we provide and will be maintained according to Medi-Clinic policy in-house by our staff, the agent or a contractor appointed by Medi-Clinic Medi-Clinic Policy

Equipment Stability – Asset Classification Operational requirements Civil projects – New hospitals or upgrades ICT Requirements – Bulk purchasing and technology change Insurance Claims Third party equipment: – Placement / Hired / Loan – Externally Owned Serviced for a fee – Service Exchanges – Evaluation Equipment

Equipment Stability – Asset Classification cont. “Virtual Assets” – Facilities – Detailed Attributes Number of Theatres Square meters of buildings or land Number of parking bays – Floor coverings / Wall coverings – Clinical power tools – Instrument sets Resource Assets – Electricity – Water – Medical Gas

Equipment Stability – Using an EAMS (On Key) Asset Register – Details of the assets you have and where these assets are in order to maintain it – Capture all assets > R1000 (Comprehensive baseline) – Financial details for depreciation and value – Warranty dates for work order control Asset Care Plan Developer – Single view of scheduling – Management of risk by using profiles such as: Schedules with a blank due date – Per category Unconfirmed schedules

Need to know what must be replaced and when Life Cycle Costing Report Links to Asset Register

Equipment Stability – Using an EAMS (On Key) Maintenance Manager – Work history Work in progress reports Closed work analysis – Productivity Staff utilisation – Facility Red Flag – Reported incidents by: PatientRed NursingGreen ManagementBlue

Technical Service Level Feedback and Average Age in Days

Select period Select number Run report to identify problem children (Excludes planned maintenance) Effective Closed Work Analysis

Staff Utilisation & Productivity Measurement

Equipment Stability – Using an EAMS (On Key) Maintenance Manager – Condition based monitoring using the following methods: Manual – Hardcopy capture Electronic monitoring of: – Generators – Uninterruptable power supplies – Air handling units – Total hospital electricity usage

Electrical Reticulation KitchenLaundryHot WaterAir-conDoctors ICUTheatreNeonatal UPS Cath-lab Open Closed Open Closed ! Lock-Out ! Do Manual Bus Coupling Do Load Shedding Power Failure Essential Load Generator Failure Essential UPS

Equipment Stability – Using an EAMS (On Key) Identification and Assessment – Calculate expected replacement date based on: Commissioned date Expected life per asset type – Assess assets “due” for replacement – Generate provisional replacement budget – Confirm assessment – Agree replacement budget

EAMS Data - Asset Master Database Management – Single version of the truth – Align other systems – Standard configuration – Asset description – Ward allocation stickers – Recognise your assets Define Business Processes and Documents – Review documentation Standard reporting – SSRS conversion Analyse the data – Does it make sense

Use for your 2010 Capital Budget Follow MediCode Tips How to create your Capital Budget Available MediCode DatasetsMediCode Dataset Owner Items - Capital and Direct Purchases including printed stationery Business Unit Division Company General Ledger 3 Letter Code Items - Nico Venter Business Unit - Karen Barkhuizen Neetling Division - Lourens Botes Company - Lourens Botes General Ledger -Marie-Elise Stofberg 3 Letter Code- Eugene Manoek MediCode News MediCode is based on a universally accepted coding structure. This is important to enable all the software applications currently in use and any future applications to be able to interface successfully and ensure accuracy of data in the database. © 2008 Medi-Clinic MediCode Manual How to Search Copy Paste Export Use Descriptions MediCode Tips

Ward Allocation Stickers

DATA ON KEY INFORMATION SSRS Reports Analyser Tool Profiles KNOWLEDGE Apply

Blender 2 Yearly Service Changed interval to 3 yearly Saving: R135,000 per year

EAMS Future Integration with other systems – Central procurement SSRS Reporting Development – Availability of information to different management levels Grow data maturity in order to create more focus on equipment Expanding scope of electronic conditioned based monitoring - Energy initiatives Installation of On Key 5

Closing Thoughts Aspects that would differentiate a company from the norm will be one that will have: – Quality data – Available to the end user – In the correct Format for the end user for Immediate use Do you spend 80 % of your time extracting or compiling information and 20 % analysing?

Thank You Bertus Janse van Rensburg