ColumbiaGrid Summary of: COI Utilization Report dated May 4, 2011

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
ACE Diversity Interchange (ADI)
Presented to the WECC MIC June 15, 2007
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
Design/Build Solutions to your construction projects, large and small.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Western Regulation Usage and Pilot Program Results 1.
Cameron Yourkowski Renewable Northwest Project Integration of Intermittent Renewable Resources NASUCA Seattle, WA June, 2013.
Technical Conference Avoided Cost Modeling January 6, 2015.
Improving Transmission Asset Utilization through Advanced Mathematics and Computing 1 Henry Huang, Ruisheng Diao, Shuangshuang Jin, Yuri Makarov Pacific.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Smart Grid Primer Funded by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Energy Bar Association – Primer for Lawyers.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Southern Intertie Discussion.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Integration of Wind Resources in CAISO Markets and Grid Operation.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
Grizzly-Summer Lake 500 kV Line Planned Outage May 27-June hours Mike Viles – BPA Transmission Operations Technical Management Team June.
11 Why BPA Transmission Customers Aggregate Reservations Feb. 20, 2013.
Renewable Energy Delivery, Scheduling, and Firming / Shaping
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Climate Change and The NW Power Supply Climate Impacts on the Pacific Northwest University of Washington April 21, 2009.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Proposed Contract to Perform Regional Sustained Hydro Peaking Capability Study Mary Johannis PNW Resource Adequacy Steering Committee January 29, 2008.
Wholesale Electricity Price Forecast Draft Current Trends Forecast Jeff King Conservation Resource Advisory Committee September 30, 2002.
Hydropower Vision Team May Advisor: James McCalley Members: ● Alex Tillema - Team Leader ● Nicholas Jones - Communication Leader ● Kyle Kraus - Key.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Background for Demand Response in PNW Pacific Northwest Demand Response Project May 2, 2007 Ken Corum.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
NW Loss of Load Probability James Gall Power Supply Analyst
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
Capping Local RA Requirements at System RA Requirements February 9, 2015 Karl Meeusen California ISO.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
CMTF Tariff Language Clarification 1. Parking Lot Question Is the Planning Reserve Margin requirement meant to be maintained throughout the whole calendar.
Northwest Wind Integration Forum Technical Work Group PSE Wind Activities Joe Hoerner October 29, 2009.
Aligning the Gas and Electric Markets: EDF Solutions
Topics Corporate Overview – Transmission Expansion Planning - Members
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
The Renewable Power Desk
Fundamental Supply Factors Driving Current Market Prices
Chuck Goldman Lawrence Berkeley National Laboratory
What To Do About Western Wholesale Markets?
Cash Trading.
Flexible Forward Contracts for Renewable Energy Generators
Overview of Northwest Wind Integration Action Plan
Solar Eclipse Overview August 2017
Pacific Power Seismic Preparedness Update
Smart Grid Primer Energy Bar Association – Primer for Lawyers
Cold Snap Task Force Update
PCM (Production Cost Model) Data Work Group Webinar
Pacific Northwest Power System and Wind Power Development
Ahmad Elberry, Abdelghani Aljayyousi
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

ColumbiaGrid Summary of: COI Utilization Report dated May 4, 2011 Jeff Miller June 2, 2011

California-Oregon Interties (COI) Ownership

Primary Conclusions Entities that need firm delivery will require new transmission capacity. New long term transmission capacity would allow the generators and California utilities to enter into power purchase agreements, obtain financing, and have certainty of power deliveries. Pacific Northwest and California entities should cooperate and consider moving forward with an Open Season process to determine the demand and interest for additional transmission.

Other Interesting Findings COI Usage driven by price spread between the Mid-C and California’s NP15 trading hubs. Usage is highest in the spring (due to hydro runoff) and summer (due to California loads). During the spring, COI capability has often been reduced due to maintenance outages. Maintenance often takes place in the spring due to ease of access and to prepare for the critical summer months. Report recommends that COI owners look at spreading the outages between the spring and fall

Users want more Dynamic Transfer Availability on COI BPA and CAISO are evaluating the potential for intra-hour scheduling on the COI as a pilot project. The CAISO is now completing a stakeholder process to add dynamic transfers to its existing market functionality. CAISO study concluded that the CAISO does not have limitations in its transmission capability to support dynamic transfers of intermittent resources. BPA, CAISO, and other organizations in the PNW are supporting recently initiated dynamic transfer capability studies, through the Dynamic Transfer Capability Task Force convened by the Wind Integration Study Team.

Market Issues Some merchants expressed concern over unknown costs when doing business with the CAISO market. COI users indicated that the transmission resale market is improving and recommended that BPA remove its price cap for resale. COl users indicated that more incentives are necessary for delivering renewable resources to California.

Scheduling and Rates are not a Barrier to Market Transactions Although there are some disparities between the CAISO market and PNW transmission providers’ reservation and scheduling timelines, most of the users said that neither scheduling timelines nor transmission rates prevent market transactions.