37th IG Meeting South Gas Regional Initiative

Slides:



Advertisements
Similar presentations
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Advertisements

1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
1 Madrid, 19 th February st SG Meeting South Gas Regional Initiative.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
European Developments Transmission Workgroup 3 rd May 2012.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
CNMC and CRE intend to formally approve IFE rules 3.1 by mid-March
Gas Regional Initiative South South-East
29th November 2016 Teleconference
20th SG Meeting South Gas Regional Initiative
21st IG Meeting South Gas Regional Initiative
New transparency guidelines
South Gas Retional Initiative
40th IG meeting 29th November 2016
Enagás, GRTgaz, Reganosa, REN and TIGF
20th April 2016 Teleconference
19th June videoconference
EU Implementation Programme
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
Background and Process
South Gas Retional Initiative
18th July 2016 Teleconference
South Gas Retional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
20th April 2016 Teleconference
South Gas Retional Initiative
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
8th February 2018 Teleconference
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Enagás, GRTgaz, Reganosa, REN and TIGF
EWRC-RAE MUTUAL PROJECTS
20th April 2016 Teleconference
29th April 2014 Teleconference
Enagás, GRTgaz, Reganosa, REN and TIGF
4th October 2016 Teleconference
18th July 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
24rd SG meeting 8th february 2018
Enagás, GRTgaz, Reganosa, REN and TIGF
24th January 2017 Teleconference
40th IG meeting 29th November 2016
37th IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
39th IG meeting 4th October 2016
Enagás, GRTgaz, REN and TIGF
29th November 2016 Teleconference
26th February 2015 Teleconference
12th December 2014 Teleconference
Gas Regional Initiative South South-East
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
EWRC-RAE MUTUAL PROJECTS
39th IG meeting 4th October 2016
EWRC-RAE MUTUAL PROJECTS
South Gas Retional Initiative
39th IG meeting 4th October 2016
Gas Regional Initiative South South-East
Presentation transcript:

37th IG Meeting South Gas Regional Initiative 31st May 2016 CNMC premises

Agenda

II. CMP: Common methodology of OSBB for the Region II. CMP: Common methodology of OSBB for the Region. Timeline for implementation Final Approval OSBB scheme: 36th IG meeting (20th April 2016) NEXT STEPS Web publication: ACER, ERSE, CRE, CNMC https://www.cnmc.es/es-es/energ%C3%ADa/circularesenerg%C3%ADa.aspx?udt_2808_param_detail=1890 Timeline for implementation Deadline for OSBB to be implemented: April 2017 TSOs proposal for implementation: Implementation of reverse auctions Adaptation of IT systems

III. Interoperability NC III. Interoperability NC. Latest developments and next steps in the Region Interconnection Agreement: Interconnection Agreement Template : published on 11st April 2016 Detailed explanation of ongoing work on interconnection agreements (TSO) Other adaptations to the IO NC (TSO)

III. Interoperability NC III. Interoperability NC. Latest developments and next steps in the Region Regulators will monitor the implementation of the code as from 1st May 2016 Exchange information between NRAs and TSOs from the bilateral discussions to analyse the compliance of the current Interconnection Agreements with the content of NC Follow up of the harmonisation about short term monitoring on gas quality: TSOs data publication

III. Interoperability NC III. Interoperability NC. Latest developments and next steps in the Region Regulators are waiting for the TSO’s information about Interconnection Agreements: Interconnection Agreement: Each IP TSOs must ensure: Rules for flow control. Measurement principles for gas & quality Rules for the matching process Rules for allocation of gas quantities Communication procedures in exceptional events Settlement of disputes Amendment process of Interconnection Agreement Common data exchange solutions

III. Interoperability NC III. Interoperability NC. Latest developments and next steps in the Region Regulators are waiting for the TSO’s information about Interconnection Agreements (Cont.): Interconnection Agreement: Each IP TSOs must ensure: Rules for flow control. Designate the TSO who is responsible for steering the gas flow across IP. Matching process. OBA correction Flow control arrangements. Quantity of gas. Measurement principles for gas & quality Description of the metering station Gas quality parameters and ranges. Data validation. Data frequency and content Signals and alarms Access to measurement facility, verification, modification, calibration, etc. Etc.

III. Interoperability NC III. Interoperability NC. Latest developments and next steps in the Region Regulators are waiting for the TSO’s information about Interconnection Agreements (Cont.): Interconnection Agreement: Each IP TSOs must ensure: Rules for the matching process: Rules of the communication and processing Matching rule for nominations and renominations Provision of data exchange for the matching process Rules for allocation of gas quantities Operational Balancing Account: as close to zero as possible. OBA takes into account characteristics of IP, linepack, capacities, gas flow dynamics. If other rule different to OBA is followed this rule must be published and network users are invited to comment.

III. Interoperability NC III. Interoperability NC. Latest developments and next steps in the Region Regulators are waiting for the TSO’s information about Interconnection Agreements (Cont.): Interconnection Agreement: Each IP TSOs must ensure: Communication procedures in exceptional events Possible impact on quantities and quality Possible impact on confirmed quantities Expected and actual end of the exceptional event Settlement of disputes. Amendment process Gas quality Data Publication. (Art. 16) Once per hour during the gas day (Wobbe index and GCV) every IP. Data availability, for so long? Information provision on short term gas quality variation. (Art. 17) List of parties to receive gas quality information. Common data exchange solutions (Art. 20 to 24) Document based data exchange Integrated data exchange Interactive data exchange

(for information by NRAs and TSOs) III. Interoperability NC. Latest developments and next steps in the Region (for information by NRAs and TSOs)

III. Interoperability NC III. Interoperability NC. Latest developments and next steps in the Region Actions: Deadline to receive the formal communication of compliance of TSOs: 30 June 2016 NRAs expect to receive detailed information about Interconnection Agreements compliance. NRAs assessment of the information received. Following positive evaluation: publication on the TSO’s web site.

IV. Balancing NC. Status of the implementation (for information by NRAs and TSOs) CNMC’s Circular 2/2015 establishing the balancing rules in the transmission network system – Jul. 2015 (Oct. 2016) Issues already developed: 1st Nov 2015: Information provision by users Rules for nomination/renominations 16th December 2015: Come into operation the trading platform: MIBGAS 1st March 2016: Procedure for accreditation of users 12nd May 2016: Methodology of imbalance prices, neutrality charges and invoicing procedure - CNMC Resolution https://www.cnmc.es/es-es/energ%C3%ADa/circularesenerg%C3%ADa.aspx?udt_2808_param_detail=48404

IV. Balancing NC. Status of the implementation (for information by NRAs and TSOs) Issues to be developed: Guarantees to cover possible imbalances - to be approved by the Industry Ministry (by the end of June 2016). Incentives for TSO to use balancing actions efficiently - to be approved by CNMC (by the end of 2016). Parameters to define when a TSO balancing action is required – to be approved by the Ministry of Industry. A draft has been produced by the TSO (by 1st October 2016).

(for information TSOs) IV. Balancing NC. Status of the implementation (for information by NRAs and TSOs) (for information TSOs)

V. Regional integration of gas markets V.1 Status review: prices and flows (for discussion) Spot prices

V. Regional integration of gas markets V.1 Status review: prices and flows (for discussion) Spot prices: MIBGAS, PEG Nord & TTF

V. Regional integration of gas markets V.1 Status review: prices and flows (for discussion) MIBGAS: Price and volume (feb16-may16)

V. Regional integration of gas markets V.1 Status review: prices and flows (for discussion) MIBGAS: Volumen by kind of product (feb16-may16)

V. Regional integration of gas markets V.1 Status review: prices and flows (for discussion) VIP Pirineos: border flows 2007-2016

V. Regional integration of gas markets V.1 Status review: prices and flows (for discussion) VIP Ibérico. Border flows 2010-2016

MARKET INTEGRATION MODELS Wholesale market with implicit allocation V. Regional integration of gas markets V.2 The way forward (for discussion) Spot prices MARKET INTEGRATION MODELS Market area model Trading region model Wholesale market with implicit allocation One single market área Single wholesale market with a single virtual point Single balancing system One single market área Single wholesale market with a single virtual point Two balancing zones Implicit allocation (gas and capacity are assigned simultanously): two market areas Single wholesale market with a single virtual point Two balancing zones Less interconnection capacity/ less regulatory harmonization needs

V. Regional integration of gas markets V.2 The way forward (for discussion) Two approaches in the Region: France & Spain: continue with the harmonisation process of network codes, supervision, etc. Portugal & Spain: further integration. Wholesale gas market with implicit allocation. Next steps

VI. Proposals for the new SGRI Working Plan (for discussion) Work Plan: CMP: Implementation and follow-up of the CMP procedures. TSO’s assessment of the gas flows in the VIP. Assessment of the VIP’s congestion status. Use of anti-hoarding mechanisms in the region and NRAs assessment of the CMP implementation Regulation improvements.

VI. Proposals for the new SGRI Working Plan (for discussion) Work Plan: 2. Balancing: Implementation and follow-up of the Balancing regimes at national levels. TSO’s assessment about unbalancing volumes, costs, number of TSO balancing actions, etc. Sharing information in the region.

VI. Proposals for the new SGRI Working Plan (for discussion) Work Plan: 3. Market integration. Next steps to further market integration: Iberia. Iberia with France

VI. Proposals for the new SGRI Working Plan (for discussion) Work Plan: 4. Infrastructures. TSO’s TYNDP. NRA’s assessment. New PCI list. Interoperability. Implementation and follow up

VII. Infrastructures (for discussion)

VIII. AOB

VI. Calendar for the next meetings 20 31 Next meetings: