Sébastien Bousson (CNRS-IN2P3-IPN Orsay)

Slides:



Advertisements
Similar presentations
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Advertisements

Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SCRF Activities at IPN Orsay Sébastien Bousson On behalf of the SCRF group Eurisol Net Meeting – CERN, 28 th June 2011.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
2 nd Oxford-Princeton High-Powered Target Workshop, Y. KadiNovember 6, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of the.
EURISOL Town Meeting October 2012 – Lisbon High-Power Targets High-Power Targets Developments and Testing of Spallation Neutron Sources Yacine Kadi,
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
The ESS Cryomodules 2012 December, 5th Christine Darve
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Please insert a figure in the master transparency. KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
TIARA PP TIARA Mid Term Meeting 14 th June 2012 – Madrid TIARA-PP WP 9 : TIHPAC TIARA-PP WP 9 : TIHPAC Test Infrastructure for High Power Accelerator Components.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Technology of Transmutation TETRA - Preparation for FP6 - Presented by X. Cheng ADOPT meeting,
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Giovanni Ciavola, JRA-07 ISIBHI JRA-07 Ion Sources for Intense Beams of Heavy Ions (ISIBHI) EURONS PCC Meeting, Groningen, Holland, December 2006.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
TIARA PP TIARA Final Meeting 27 th November 2013 – Daresbury TIARA-PP WP 9 : TIHPAC TIARA-PP WP 9 : TIHPAC Test Infrastructure for High Power Accelerator.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
‘Toward TIARA’ Final Plan for the collaborative R&D Program WP4 Presented by Paolo Pierini 26/11/2013.
Paul Scherrer Institut 5232 Villigen PSI EURISOL Town Meeting Pisa, March 30-April 2, 2009 / W. Wagner PAUL SCHERRER INSTITUT EURISOL Spallation Neutron.
TIARA-PP WP 9 « TIHPAC » Test Infrastructure for High Power Accelerator Components Sébastien Bousson (CNRS-IN2P3-IPN Orsay) TIARA PP TIARA Steering Committee.
O. Kester, NuSTAR annual meeting, 27/02/2013
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
Paul Scherrer Institut 5232 Villigen PSI EURISOL/BENE_2007, PSI /GF34 Joint High Power Target Meeting EURISOL/BENE , CERN Direct target irradiation.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
TIARA-PP Governing Council 1 representative per contractor TIARA-PP Coordinator Industry advisory committee? Project Management (WP1) Project Office Dissemination.
EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of Task#2 European.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Cryomodule test stand at ESS site
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
WP5 Elliptical cavities
at STFC Daresbury laboratory
WP5.1 Professional training and apprenticeship (CEA, DESY, INFN)
T5.2: Harmonization - Material and Component Reference
Uppsala Commitment to ESS and FREIA Planning
for the EURISOL Steering Committee
WG-1 Session Cavity Performance Cryomodule Performance
Plans for a Superconducting Proton Linac at CERN
Accelerator Research and Innovation for European Science and Society
Designing Safety into a High-power Neutron Spallation Source
Hosting Orsay Walid KAABI
ESS RF Development at Uppsala University
Beam Dump outline work plan (UK perspective)
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
HIE-LINAC status report
Olivier Napoly, coordinator CEA/Irfu
Experimental equipment Edgar L. Black February 17, 2019
SLHC-PP kick-off meeting, CERN 9 April 2008
Cryomodules Challenges for PERLE
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

Sébastien Bousson (CNRS-IN2P3-IPN Orsay) TIARA PP TIARA PREPARATORY BOARD 2nd November 2009 - CERN TIARA-PP WP 10 « EURISOL » Sébastien Bousson (CNRS-IN2P3-IPN Orsay)

The multi-MW target complex WP 10 Framework EURISOL is the next generation of a facility aiming at the production of radioactive ion beams (RIB) using the ISOL technique. A Design Study within FP6 has just finished, and 2 key components will require an important R&D program and intense experimental tests to fulfill the Eurisol requirements The multi-MW target complex The low beta superconducting (SC) cavities (for driver and post-accelerator) The objective of this WP is to coordinate the definition and the design of two test benches: an irradiation test facility for the high power target developments and a cryogenic test cryostat for testing fully equipped low beta superconducting cavities. Important synergies of these equipments with other projects : ESS, ADS (EUROTRANS, MYRRHA)…

All these research items will require experimental studies. WP 10.1 : Irradiation test facilities for MMW target development Full scale test of the MMW target available only in the final facility ! Achieving the design of the full scale target for Eurisol will require several partial tests: sub-components, irradiation at lower power, instrumentation tests… N° Research Items Application 1 Test coaxial guided stream (CGS) Window cooling with laser heating Performance 2 Test windowless transverse film (WTF) stability with high speed camera 3 Sub-scale Target irradiation 4 Ultra-sound sensors Instrumentation 5 Pressure sensor capillaries 6 Heat Transfer Coefficient (HTC) method improvements with laser 7 Primary/Secondary fluid interaction study Safety 8 Investigation of the pressure wave from a pulse Science 9 Investigation of on-line isotopic separation 10 Fatigue under Liquid Metal (LM) corrosion and irradiation study 11 Influence of wall conditions on LM Heat transfer 12 Long-duration test facility Engineering 13 Dedicated LM Component development All these research items will require experimental studies.

WP 10.1 : Irradiation test facilities for MMW target development Work breakdown: Task 10.1.1 : Identification of the necessary irradiation test facilities, definition of their specifications and possible locations Task 10.1.2 : Design study of the irradiation test facilities, as they will be defined in the previous task Milestones Num Nat[1] Short name Description month M10.1.1 R Report on the definition of the required test facilities and possible locations 12 M10.1.2 For each defined facility, technical design report of the irradiation test facility 36 Deliverables Num Nat[1] Short name Description month D10.1 R Design of the test irradiation facilities 36

WP 10.2 : Designing a low beta cavity test cryostat Before assessing that a SC cavity is validated for an operational use in an accelerator, the final experiment is a cryogenic test at nominal RF power of the fully equipped cavity (power couplers, cold tuning systems…) Very few “accelerator configuration” test cryostat are existing in Europe and they are designed for elliptical cavity testing. Such a cryostat, specific and devoted to low beta SC cavities will be a useful complementary equipment.

The Eurisol Facility Layout Driver RIB production Beam preparation Post-Accelerator

WP 10.2 : Designing a low beta cavity test cryostat Work breakdown: Task 10.2.1 : Identification of the users requirements for the cavities and all their ancillary systems Task 10.2.2 : Design of the vacuum vessel including magnetic and thermal shields, design of the cavity supporting system. Task 10.2.3 : Design of the cryogenic cold box to supply the vacuum vessel with the different cryogenic fluids. Milestones Num Nat[1] Description month M10.2.1 R Preliminary design and operation mode of the test cryostat 15 M10.2.2 Technical Design Report of the test cryostat 32 Deliverables Num Nat[1] Description month D10.2 R Complete design of the test cryostat 32

WP 10 Partners (person.month figures are still preliminary) WP 10 : Partners & cost WP 10 Partners (person.month figures are still preliminary) WP number 10 Start month 1 End month 36 WP Title Eurisol test infrastructures Activity Type RTD Objective Design study of Eurisol R&D test benches for high power target and low beta superconducting cavities Participant number 2 3 8 CERN CNRS PSI ESS-S (Lünd) Person-months 15 32 12 WP 10 Associates: IPUL Salaspils (LV) : Liquid metal loop technology FZK Karlsruhe (Ge) : Corosion tests (KALA loop) WP 10 Costs (estimate): Total : 700 k€ EU request : ~ 350 k€