Institute for Energy and Transport B. Giechaskiel, G. Martini

Slides:



Advertisements
Similar presentations
PMP Progress Since GRPE 55 GRPE 54 agreed a Roadmap of work to address concerns with ECE/TRANS/WP.29/GRPE/2007/8 ( adding particle number measurement to.
Advertisements

PMP: SUB 23 NM MEASUREMENT RECOMMENDATIONS B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 3 April 2014.
Particle Measurement Programme Informal Working Group (PMP) Progress Report and Next Steps Giorgio Martini Sustainable Transport Unit.
Institute for Energy and Transport B. Giechaskiel, G. Martini
CPC Calibration – SI Traceability Hans-Georg Horn TSI GmbH, Aachen, Germany.
Revisions To Heavy Duty Validation Report General Numerous clarifications to text as requested at December meeting Partial flow systems referred to consistently.
Particle Measurement Programme (PMP) Progress update
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
PMPN Report to WLTP DTP 16 Jan 2013 Prepared by Caro Hosier Post 14 and 15th WLTP PMPN Meetings audio / web conferences.
REGENERATION ISSUES Institute for Energy and Transport Joint Research Centre B. Giechaskiel, J. Andersson, G. Martini 3 April 2014.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 5 th DTP Meeting Dubendorf 12 th – 14 th April 2011 Chris Parkin.
INGAS SPA2 Meeting, Regensburg, October 13 th 2011 INGAS INtegrated GAS Powertrain 1 SPA2 Meeting Regensburg, Month 37, Turbo DI CNG Engine Alois Fürhapter,
Summary of the latest PMP related activities Giorgio Martini, Athanasios Mamakos* Institute for Energy and Transport Joint Research Centre * Southwest.
PMP: SUB 23 NM REVIEW B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 8 January 2014 GRPE-PMP
WLTP 6th DTP Meeting Geneva DTP Subgroup LabProcICE slide 1 Parameter Setting for Validation 2 DTP Subgroup Lab Process Internal Combustion Engines.
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
ACEA PM-3 programme Caroline Hosier, Pilot, ACEA Task-Force Particulates (TF-PM) Ford Motor Company Draft presentation to GRPE Informal document No. GRPE-52-9.
37 TH PMP MEETING Institute for Energy and Transport Joint Research Centre B. Giechaskiel, G. Martini 7 Oct 2015.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Non- exhaust particle.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Exhaust emissions.
© 2009, TSI Incorporated PMP PNC Calibration Recent Experiences Hans-Georg Horn TSI GmbH, Particle Instruments PMP Meeting, London, 30 March 2009.
NON EXHAUST TRAFFIC RELATED EMISSIONS WORKING DOCUMENTS Sustainable Transport Unit Institute for Energy and Transport Joint Research Centre 35 th PMP IG.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 72th UNECE GRPE session PMP IWG Progress Report.
RDE PN-PEMS programme Progress Update F. Riccobono, B. Giechaskiel, P. Bonnel STU, IET, JRC, European Commission.
Joint Research Centre the European Commission's in-house science service NON-EXHAUST PARTICLE EMISSIONS.
PN-Calibration Issues
Technologies for low emission light duty powertrains
HD CNG ENGINE PN MEASUREMENT
PMP IWG Progress Report
PMP IWG Progress Report
43rd PMP-Meeting Rosa Delgado IDIADA 15/03/ /03/2017 TITLE
Inter-laboratory comparison exercise cpc calibration material: 2nd stage Focus on soot as harmonized calibration material for Automotive PN counters. Generators:
Electric Vehicles and the Environment (EVE IWG)
PMP IWG Progress Report
PMP IWG Progress Report
PMP Heavy Duty Validation Exercise
Particle Measurement Programme - Report
Technologies for low emission light duty powertrains
Preliminary results of the OEMs HDV PN-PEMS validation study
76th UNECE GRPE session PMP IWG Progress Report
76th UNECE GRPE session PMP IWG Progress Report
BRAKE PARTICLE EMISSIONS
77th UNECE GRPE session PMP IWG Progress Report
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
Light Duty-PMP-2017/2018 Sub23nm Round Robin
WLTP DTP PM-PN Subgroup Activity Report
Imad Khalek, Ph.D., Sr. Program Manager,
PMP IWG Progress Report
Additional evaluations at AVL
HD ENGINE RAW PN MEASUREMENT
HD ENGINE RAW PN MEASUREMENT
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
PMP sub-group on CPC calibration
Informal document GRPE Rev1
Inter-Laboratory Comparison Exercise CPC CALIBRATION
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
Revision of the Work Plan
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
PN-PEMS Progress update
78th UNECE GRPE session PMP IWG Progress Report
PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.
Current status All European laboratories (except 3rd JRC measurement) have conducted their measurements Equipment finally returned to JRC US, Japanese.
PMP INFORMAL GROUP Exhaust particle emissions – progress report
ACEA and JRC PMP meeting 7/11/2018
PNC and VPR Validation PMP Meeting 30th March 2009
Presentation transcript:

Institute for Energy and Transport B. Giechaskiel, G. Martini 41st PMP MEETING Institute for Energy and Transport Joint Research Centre B. Giechaskiel, G. Martini 12 Oct 2016

PMP meetings 2016-01-13: PMP 38th (GRPE Geneva summary) 2016-05-03: PMP 40th (telco) 2016-06-06: - (GRPE Geneva summary) 2016-10-12: PMP 41st

Raw exhaust (tailpipe) sampling Experimental program Primary dilution Losses Volatile removal efficiency Pressure effects Time alignment JRC will wait for experimental data Limited number of tests from PN-PEMS for HD program

Results from PN-PEMS program PMP at CVS (APC 489, AVL) and PMP at tailpipe (Nanomet, Testo) Correction of calibration factor 10%. Cycles like WHVC, ISC, high load points Exhaust flow estimated from CVS Results from 5 vehicles, >140 cycles (34 of duration 3h each)

Experimental setup (JRC) Not engine test bed Euro VI vehicles Low (thermophoretic) losses due to position of PMP_TP EFM uncertainty <5%

V1 & V5

V3 & V8

V2 (CNG)

Experimental setup (MAN) APCs at tailpipe with 0.5 m heated line 150oC APC at PFD (Nova Microtrol) No feeding back the flow Euro VI engines (diesel, CNG) Different settings at the PFD WHTC and WHSC Tyroller et al. 2016, ETH poster

Results (MAN) Differences within 20% Higher with CNG engine PFD setting effect? Tyroller et al. 2016, ETH poster

Raw exhaust sampling Preliminary results show 20% differences Input from others is necessary Theoretical investigation of uncertainty

Calibration of PN systems Review of open issues (30th) Presentation of key areas (33rd) Questionnaire sent for optimizing procedures and minimizing areas of future investigation Summary of first replies (35th) Volatile Removal Efficiency (37th) Decision to start a PNC round robin (38th) Update of round robin (39th)

PNC Reference PNC: ISO Slope: 0.9 to 1.1, residuals ±4% (from 10%) k factor: should be included (and reported) – ok Material: soot, emery oil -> TSI, AVL, JRC workshop ISO 27891: Should be adopted, with applic. notes Steepness criteria: needs addition of another size Drift: Monitored (as WLTP)

VPR Calibration PNC: calibrated, Require CE23nm>90% One or two PNC method: Concerns with two PNCs method due to non linearity Intercalibrated Stability: Decrease from 10% to 3% (5%?) Neutralizers: One Material: Stable Penetration and DF: ok Polydisperse validation: GMD 50nm, GSD 1.8 ok C40: Require air for generation, d50%=10nm, higher initial concentration, add bigger size  to be investig

PNC Calibration Round Robin Confirm that the k factor can be included in the final counting efficiencies Investigate the possibility to change the calibration material Applicability to PN-PEMS procedures Investigate the possibility to calibrate at 10 nm

Targets Repeatability Reproducibility Harmonization (PMP – aviation – PN-PEMS) Expandability (shift to 10 nm) Based on the above, the research work should investigate: 10 nm and 23 nm CPCs CPCs with different steepness Propanol and butanol based CPCs DCs

Participants presentations BMW AVL VW

New mandate / ToR The PMP groups has submitted to GRPE an updated draft version of the ToR and request a new mandate with two new specific concrete objectives: Sub 23 nm exhaust particles: Demonstrate the feasibility to measure sub23nm particles with the existing PMP methodology with appropriate modifications and assess measurement differences/uncertainties by means of a round robin Brake wear particles: Development of a suggested common test procedure for sampling and assessing brake wear particles both in terms of mass and number:

Objectives of a Round Robin with CS Demonstrate feasibility to measure sub23nm Examine the need of a catalytic stripper (CS) Confirm the draft requirements and calibration procedures of sub23nm protocol Recommend a technology-independent, traceable calibration standard (including transfer system, VPR/CS/…, measuring device), if measurement technology has to be adapted. Evaluate measurement differences/uncertainties Evaluate sub23nm fraction of modern engines

PN system 10nm (VPR) Catalytic Stripper included VRE test to be defined PN-PEMS 1mg/m3 Calibration: Thermally stable particles >5000 p/cm3 at 15nm PCRF(10nm)/PCRF(100nm)<2 Desired also lower values: Input from manufacturers PCRF = average (30nm, 50nm, 100nm) Note: Only 50% of the sub-23nm particles are counted

PN system 10nm (PNC) Counting efficiency 10nm: 50% To maximize the measurement of >10 nm particles Counting efficiency 15nm: >90% (? To be checked) Calibration: Emery oil or other equivalent (under investigation)

Implementation of 10nm protocol One CS+10nm unit to circulate (at least) CVS: TOPAS diluter+CS(cat.instr)+3790+3772 (?) CVS or TP: APC/CS CVS or TP: SPCS/CS Comparison with PMP systems (+10nm) One more 10nm to circulate in parallel with labs PMP Different labs will test different engine technologies One golden vehicle from JRC (GDI with GPF?) Time frame: JRC by the end of the year to have instruments (?) and preliminary tests in Jan 2017 (?)

HORIZON 2020 Participants presentations DownToTen PEMS4nano SUREAL-23

HORIZON 2020 projects Topic DownToTen PEMS4nano SUREAL-23 Objective Instrumentation Fuel efficient G-DI engine Instrumentation + vehicle testing Size [nm] >5-10 >10 >1 Technology any CPC Not defined Prototype 2019 Jan 2018 start Testing many Single cylinder and other Validation of instrument Prototype limited availability to others PMP link Important Medium