HCAL task status report

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
EUDET, OCT8 - 10, 2007 Ivo Polak, IoP Prague1 A fast LED driver prototype for HCAL calibration EUDET annual meeting at Ecole Polytechnique, Palaisau.
Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 1 Peter Göttlicher, DESY For CALICE collaboration Chicago, June 11 th, 2011 A concept for.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
Hadron Calorimeter Felix Sefkow EUDET Annual Meeting October 20, 2006.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
HCAL future: 2 nd generation module and testbeam plans Felix Sefkow CALICE collaboration meeting Kobe, May 10-12, 2007.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
Scintillator HCAL project overview Felix Sefkow HCAL Main Meeting June 30, 2008.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Scintillator HCAL read-out and calibration Felix Sefkow TILC08 at Sendai, Japan March 4, 2008.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
The CALICE scintillator tile HCAL project Felix Sefkow LCWS’06, Bangalore March 9-13, 2006.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
14.4. Readout systems for innovative calorimeters
LED notched fibre system short HBU0 party with QMB6
A fast LED driver prototype for HCAL calibration
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
Towards a realistic Scintillator HCAL with SiPM read-out
LED notched fibre system at AHCAL Calibration system for SiPM
HCAL Modules -First Ideas
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Joint Research Activity 3: Calorimetry
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
A fast LED driver prototype for HCAL calibration
Scintillator HCal Prototype
Presentation transcript:

HCAL task status report Felix Sefkow EUDET Annual Meeting Oct 10, 2007

Calibration electronics Detector optimization Overview Goal: A compact and realistic (i.e. scaleable) scintillator HCAL structure with embedded electronics Electronics integration Mechanics Scintillator Photo-sensors Calibration electronics Calibration studies Test beam Detector integration Detector optimization EUDET Infrastructure FEE DAQ HCAL task Felix Sefkow Oct 10, 2007

All dimensions are preliminary TILE MGPD Chemically treated edges for light reflection Ø 2.5-0.02 3.0-0.02 15.0-0.05 Schedule OK: Tiles for electronics unit in 2008 For complete layer / small test stack in 2009 30.0-0.05 MGPD 2.54 Ø=? 0.6 556 cells, Ø1mm CPTA, Moscow 0.8 2.7 4.0 M.Danilov, ITEP

MGPD PROPERTIES OK for WLS readout; direct coupling studied in parallel M.Danilov HCAL task Felix Sefkow Oct 10, 2007

Test beam Not part of EUDET, but has impact: Feedback to detector concept and calibration methods Availability of human resources June 2007: all HCAL active layers completed (8000 SiPMs) Movable stage completed, fully functional HCAL task Felix Sefkow Oct 10, 2007

Example: temp. dependence of gain for 5000 channels Test beam calibration Calibration is done with MIPs (muons) To be established for ILC: simulations Monitoring with Temperature sensors LED reference pulses (problematic) Direct observation of SiPM gain Calibration electronics developed and built in Prague Redundancy for cross-checks Large dynamic range Calibration data analysis: DESY, Bergen Tools for multi-channel studies developed S.Schaetzel, DESY Example: temp. dependence of gain for 5000 channels HCAL task Felix Sefkow Oct 10, 2007

Saturation Curves for Module 13, 5-6 Compare 4 runs from August & October Saturation curve after pedestal subtraction, PIN & gain correction SiPM non-linearity - Does in-situ meas. agree with test bench? Is it stable? First results encouraging, but analysis ongoing Saturation curve after adjustment to common origin with slope one G.Eigen, Bergen  August runs  October runs G. Eigen,HCAL task Paris, 08.10.2007 Felix Sefkow Oct 10, 2007

Calibration system approaches Optical signal distribution central pulser (one or few per layer) Minimized cross-talk to readout (photo-sensors and FEE) Monitoring of light source stability for reference possible Most frequently made choice, experience Electrical signal distribution Many pulsers, one per single or few channels Avoids optical coupling problems (stability, uniformity) Can work with very small electrical and optical pulses Not yet tried until now HCAL task Felix Sefkow Oct 10, 2007

QR LED driver Development at IoP, Prague Quasi-resonant circuit: minimize electromagnetic interference I.Polak, Prague Wavefrom and Xtalk OK 2 channel PCB in month 22 LED PIN HCAL task Felix Sefkow Oct 10, 2007

LED on board Proof-of-principle, check for cross-talk, uniformity Test also Different driver schematics Small connector SiPM coupling M.Reinecke, DESY HCAL task Felix Sefkow Oct 10, 2007

Ongoing optimization and measurements (ligt uniformity, dyn. range,…) Estimate Crosstalk Scope in averaging mode Light in Tile 1 ≈40mV Crosstalk to tile 2 and tile 4 ≈1mV Very encouraging Ongoing optimization and measurements (ligt uniformity, dyn. range,…) Crosstalk ≈ 2.5% electr./optical ?? HCAL task Felix Sefkow Oct 10, 2007 Mathias Reinecke EUDET annual meeting – Paris 8.-10. Oct. 2007

Integrated layer design Sector wall Reflector Foil 100µm Polyimide Foil PCB 800µm Bolt with inner M3 thread welded to bottom plate SiPM Tile 3mm HBU Interface 500µm gap Bottom Plate 600µm ASIC TQFP-100 1mm high Top Plate 600µm steel Component Area: 900µm high HBU height: 6.1mm (4.9mm without covers => absorber) Absorber Plates (steel) Spacer 1.7mm fixing DESY integrated HCAL task Felix Sefkow Oct 10, 2007

HBU – PCB Layer Structure 6 layer design with cut-outs for ASICS and connectors 75W Lines for high-gain SiPM setup Two signal layers for impedance-controlled routing Total height (PCB + components): 1.5mm Two companies agreed on structure at reasonable costs!! HCAL task Felix Sefkow Oct 10, 2007 Mathias Reinecke EUDET annual meeting – Paris 8.-10. Oct. 2007

EUDET annual meeting – Paris Slabs of an AHCAL layer AHCAL slab 12x12 tiles HBU: Number of channels per layer not constant! 9x12 tiles 24 SPIROCs in chain 6 HBUs in a row Two flexleads for interconnection Slow-Control and Readout token to LDA DIF-DIF conn. HCAL task Felix Sefkow Oct 10, 2007 Mathias Reinecke EUDET annual meeting – Paris 8.-10. Oct. 2007

HEB Interconnection Concept Flexlead and 80-pin connector Interconnection to AHCAL- Layer (HBU) POWER CALIB DIF DIF-DIF conn. Redundancy against failures of LDA HLD Changes Size from Layer to layer HEB Same Size for all 38 AHCAL layers To LDA DIF - Detector Interface (Configuration and Operation) CALIB - Light and/or Charge calibration and monitoring POWER – Layer power and temperature monitors Mezzanine setup allows independent development of different groups. HCAL task Felix Sefkow Oct 10, 2007 Mathias Reinecke EUDET annual meeting – Paris 8.-10. Oct. 2007

AHCAL Half Sector - Integration AHCAL Slab 6 HBUs in a row HBU HCAL Base Unit typ. 12 x 12 tiles SPIROC typ. 4 on a HBU HEB HCAL Endcap Board Hosts mezzanine modules: DIF, CALIB and POWER HLD HCAL Layer Distributor HCAL task Felix Sefkow Oct 10, 2007 Mathias Reinecke EUDET annual meeting – Paris 8.-10. Oct. 2007

Temperature / Power Dissipation From P. Göttlicher (DESY) No. channels: 1100 / m² Pow. Diss.: 40µW / channel (25µW ASIC, 15µW HV, 3A / layer during bunch train) Time constant of heat effects: a = 6 days Temperature at far end (DT): DT ≈ 0.3 °C Power pulsing and a good thermal connection (cooling) enables a stable operation! HCAL task Felix Sefkow Oct 10, 2007 Mathias Reinecke LCWS 2007 – DESY Hamburg 1.6.2007

POWER to AHCAL layer For 1V in 2ms: 3.4mF 10 SMD tantal Components on HEB, HLD For 1V in 2ms: 3.4mF 10 SMD tantal For 5mV in 1µs: 340µF 40 large ceramic ‚Slow‘ ‚Fast‘ P. Göttlicher, DESY HCAL task Felix Sefkow Oct 10, 2007

Testboard II : ASIC + Integration SPIROC Testboard (HBU prototype): Assembly (Tiles, PCB, ASICs, LEDs), Cassette Construction Performance in the dense HBU setup: Noise, gain, crosstalk, power and signal integrity DAQ Interface LCS with LEDs on board. Tile integration to HBU : see M. Danilov‘s talk (alignment pins) HCAL task Felix Sefkow Oct 10, 2007 Mathias Reinecke EUDET annual meeting – Paris 8.-10. Oct. 2007

Testboard III : Power-System Test Power-Ground System (2.20m): Oscillations when switching? Voltage drop, signal integrity (traces, connectors)? SPIROC performance @ far end (blocking caps sufficient)? ‚Layer Concentrator‘ (DIF*) Extenders (Power-Gnd, Traces) SPIROC Testboard HCAL task Felix Sefkow Oct 10, 2007 Mathias Reinecke EUDET annual meeting – Paris 8.-10. Oct. 2007

Mechanical design Engineering resources: Cassette: Absorber structure: EUDET position filled as of Oct 1st, 2007 Increasing support at DESY after end of HERA and completion of CALICE test beam set-up Cassette: Evolve testbeam prototype design Absorber structure: Start re-evaluation of TESLA design HCAL task Felix Sefkow Oct 10, 2007

Milestones and Deliverables 06 07 08 09 reports Concepts, designs – and final prototypes concepts designs VME test stand construction PPT construction Testbeam data taking feedback HCAL task Felix Sefkow Oct 10, 2007

Conclusion Things are starting to fall into place A nice concept is emerging – looking forward to the design phase The HCAL task is on track HCAL task Felix Sefkow Oct 10, 2007