TripleSpec 4 Status and Coming Steps

Slides:



Advertisements
Similar presentations
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
Advertisements

1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Decay Solenoid – what do we have to do to make it work?
SITR: FORCAST February 19, 2010 Cornell University Herter.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Xenon Detector Installation schedule Satoshi MIHARA.
DO NOW  Complete the problems under Do Now on your Daily Organizer.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
MIWG-8 Update TG Metadata Michael Östling Status Rome.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
Pg 1 21 April 2016 ACTR Meeting SOAR Priorities Jay Elias.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
PR70007 – MarkeTrak Ph2 ERCOT Marketrak Task Force February 7, 2008.
PIXEL CAEN Installation Status
4.5 K Cold Box Schedule Recovery Directors’ Review
SPF MAG Quarterly Report – Feb 2015
Solenoidal magnet. The status of manufacture, forthcoming works
CSP 25th November 2010 Technical agreement number 3: overview
Alistair Walker Version 3 December
Status of different Parts Budget Summary
on behalf of the RF group
Initiative Name Initiative Leader Target Go Live Date: Reporting Date
RPC Barrel HV & LV system Lappeenranta University
Teleconference ACS – FREIA 17th October 2017
Update on HW commissioning
CMS November Upgrade Week
The SABRE Crystals Frank Calaprice.
G. Carboni for the Muon Group
Olof Bärring LCG-LHCC Review, 22nd September 2008
Nearly the end of a long story...
Online Software Status
Remaining Online SW Tasks
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Far Detector Activities Late 2017 – Early 2018
10/month is the present production rate 2 FTE + sporadic contributions
Status of the cryogenic system for B180
Key Information Summary (KIS)
NC Truck Driver Training SCHOOL
Gustavo Rahmer ETS - CTIO
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
Lehman 2000 Project Timeline
Overall Project RAG Status
Release 3 Update November 2018.
Strategic Planning Timeline Overview
[Insert Title Slide Contents]
LCLS Undulator System Status and Schedule
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
LCLS Undulator System Status and Schedule
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Schedule (Major Deliverables and Milestones)
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

TripleSpec 4 Status and Coming Steps ACTR-S Meeting 24 Oct 2013

Status MUX and 2 detectors received from Teledyne In La Serena ITAR license required safe and door locks = done Fanout board designed and built Warm-test cables built Warm testing of MUX mostly done, all good so far Software 90% or more done Test Dewar = new “lab” version of SOI-style Parts coming out of shop, leak checking and rework underway Completion expected 18 November Cryo cables designed, order going out before end of Oct Expected 8 week delivery from UK ACTR-S Meeting 24 Oct 2013

Next Steps Finish Test Dewar Wire up with cryo cables Cold test MUX – expected finish late January 2014 Cold test, optimize first detector – expected finish early May Cold test, optimize second detector – expected finish early August Will probably deliver MUX, detectors to Cornell serially They expect to need something (MUX or detector) late May/early June May require > 1 trip by CTIO personnel to Ithaca, NY; maybe notl Certainly means > 1 shipment Expected finish dates include explicit schedule contingency ACTR-S Meeting 24 Oct 2013

Summary We are somewhat (4-6 months) behind original schedule So is Cornell = no conflict, yet Still aiming for delivery to CTIO in January 2015 Have eaten much but not all of I&T phase contingency already Making good progress now BUT need to keep up; further slips almost certainly will mean delayed delivery to CTIO Resources needed: Patricio + shop to finish Test Dewar (done soon) Marco Bonati and Michael Warner + technician support for testing ACTR-S Meeting 24 Oct 2013