News item and introduction of working groups

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Peter Speckmayer, LCWS2010, Beijing 1P. Speckmayer, LCWS2010, Beijing3/27/2010.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
SiD’ and CLIC CDR preparations Outline: Introduction Description of SiD’ detector R&D in software/hardware for SiD’ Preparations for the CLIC CDR Conclusions.
General news CLIC detector and physics meeting at LC2013, May 30 th 2013 Lucie Linssen L. Linssen, CLIC detector & physics meeting, May 30th
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
1 Tungsten supply and assembly, test beam setup Market survey on tungsten supply Ideas on the frame design Experimental area Test beam setup Wolfgang Klempt/
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
Introduction / CLICdp news (CLICdp - CLIC detector and physics) -- CLICdp meeting at AWLC14, 13 May Konrad Elsener, CLICdp session, AWLC14 1 Konrad.
LCD Monthly Meeting – Upcoming Conferences 2012 Michael Hauschild, 19-Mar-2012, page 1 Upcoming Meetings, Workshops, Conferences 2012 LC TPC Collaboration.
News, plans, wrap-up -- CLIC workshop, Febr. 5 th Lucie Linssen, CLICdp, wrap-up, February 5th Lucie Linssen.
1Frank Simon ALCPG11, 20/3/2011 ILD and SiD detectors for 1 TeV ILC some recommendations following experience from the CLIC detector study
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
CLIC CDR in relation to SiD Lucie Linssen SiD discussion at IWLC CERN October 18 th LL, SiD meeting at IWLC, 18/10/2010.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
CLICdp news -- CLICdp 2-day meeting June 10 th Lucie Linssen, CLICdp, 2-day meeting, June 10th
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Eugene October
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
1 News from the CERN Linear Collider Detector Project Konrad Elsener CERN.
ILD SiD CALI CE LC- TPC FCAL R&D group (ILC) group (ILC) “collab” (CLIC)  host lab “collab” (LC) “collab” (LC) “collab” (LC) R&D groups involved in “world-wide.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
1http:// Lucie Linssen LCWS /3/2010 SiD and CLIC Outline: Adaptation of SiD detector for CLIC Use of SiD software for CLIC Tracking.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Report from the spokesperson -- CLICdp IB meeting Febr. 5 th Lucie Linssen, CLICdp IB, February 5th
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
General news LCD monthly meeting 22/4/2013 Lucie Linssen L. Linssen, LCD monthly meeting, 22 April
Report from the spokesperson Lucie Linssen CLICdp IB meeting 21/1/2016 Lucie Linssen, CLICdp, IB meeting, January
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
CLIC detector & physics study -- Intro and general news -- Lucie Linssen Lucie Linssen, CLICdp 2-day meeting, October 1st Detector model CLIC &
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
14.4. Readout systems for innovative calorimeters
SiD R&D Plan and Opportunities for New Collaborators
Test Beam Request for the Semi-Digital Hadronic Calorimeter
PANDA Muon Group Meeting, Protvino 7 June 2011 G
Linear Collider Detector (LCD) project overview
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
Introductory remarks David Ward
Layout of Detectors for CLIC
SiD Calorimeter R&D Collaboration
Conferences, Workshops and other Meetings – LCD participants & talks
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Preparations for the SiD Workshop at Fermilab, April 9-11
CLIC detector at SiD meeting 28/3/2010
(My personal) CALICE Report
Introduction to the Workshop
Calorimetry for a CLIC experiment
ILC Detector R&D in Japan
ScECAL+AHCAL+TCMT Combined Beam FNAL
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
CLIC Detector studies status + plans
CLIC Detector CERN Status + plans
GEM-based Digital Hadron Calorimetry for SiD
CLIC Detector Synergies with SiD R&D
Michele Faucci Giannelli
Presentation transcript:

News item and introduction of working groups Lucie Linssen LCD monthly meeting February 22nd 2010 http://www.cern.ch/lcd Lucie Linssen, 22/2/2010

Upcoming conferences/meetings (1) Dedicated Software meeting on geometry toolkit (and Mokka/Marlin) February 24th at CERN http://indicobeta.cern.ch/conferenceDisplay.py?confId=84903 Dedicated meeting on CALICE tungsten HCAL prototype March 2nd at Desy http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=4442 (see also testbeam slides W. Klempt, at the end of this talk) CALICE workshop in Arlington-Texas, March 10-12 http://www.uta.edu/physics/meetings/hep/calice/index.html LCD contribution requested to presentations on: Tungsten HCAL, Geant4 hadronisation http://www.cern.ch/lcd Lucie Linssen, 22/2/2010

Upcoming conferences/meetings (2) LCWS10 March 26-30 in Beijing http://lcws10.ihep.ac.cn/ We have to propose CLIC physics/detector study contributions (within ~1 week, contact Dieter Schlatter). Sessions on: Tracking/vertexing, MDI session, Calorimetry+muon, Simulation+reconstruction, several sessions on physics subjects FCAL meeting Krakow, April 12+13 2010 ECFA linear collider workshop (joint ILC and CLIC) October 18-22 2010, CERN (CERN + CICG Geneva) http://www.cern.ch/lcd Lucie Linssen, 22/2/2010

Joint ILC-CLIC working group on physics/detector Marcel Demarteau, Francois Richard, Felix Sefkow, Marcel Stanitzki, Mark  Thomson, Sakue Yamada (chair), Lucie Linssen (deputy-chair) http://www.cern.ch/lcd Lucie Linssen, 22/2/2010

Physics/detector CDR layout and organisation CLIC CDR due for end April 2011 (for council meeting of June 2011) Introduction CLIC physics potential CLIC experimental conditions and detector concept design choices Detector performance requirements Tracking system Calorimeter system Superconducting Solenoid Muon system Very forward calorimeters Readout electronics and data acquisition Detector integration Physics performance R&D prospects Costs Conclusions Three main editors SiD (ok), ILD, CLIC (ok) from 3 regions (Americas ok, Europe ok) Chapter editors will be nominated by main editors/editorial_board http://www.cern.ch/lcd Lucie Linssen, 22/2/2010

CDR working groups (1) Currently putting a few working groups in place in preparation for the CDR: 1: CLIC physics potential => convener tbc Scenarios, e.g. also taking possible early LHC results into account 2: Physics observables related to jets (SW) => convener Mark Thomson PFA optimisation for high-E jets, jet resolution, jet algorithms, missing E 3: Physics observables related to tracks (SW) => convener Marco Battaglia Track/vertex optimisation, flavour tagging, lepton id (tau id), muon background 4: Vertex detector (mostly HW) => convener (under discussion, tbc) Review possible solutions for a CLIC vertex detector with time-stamping, set R&D goals 5: Engineering, layout, solenoid, cost => convener Konrad Elsener In addition there is the already existing MDI wg, led by Lau Gatignon http://indico.cern.ch/categoryDisplay.py?categId=2003 http://www.cern.ch/lcd Lucie Linssen, 22/2/2010

CDR working groups (2) The working groups provide platforms of discussion on targeted subjects. They will make it easier for participants with common interests to contribute, to exchange information and to plan/organise/streamline the work. There is a limited number of working groups, adapted to the current status of the project and also adapted to the available resources (creating many more wg’s would give a broader coverage, but would not be well adapted to the current level of resources). Current status of the CDR preparation (simulations): “getting tools reading in preparation for benchmarking”. We have ~5 months of time for this, trying to move to “production and benchmarking” by August. Add that point we may redefine the wg’s, e.g. add “benchmarking” (possible merge of 2+3?) We will put web pages / indico / mailing lists in place to help getting the wg’s started asap. I suggest that the conveners each appoint an alternate. I suggest that wg’s to give short summaries at the monthly meetings. http://www.cern.ch/lcd Lucie Linssen, 22/2/2010

Preliminary PS/SPS Schedule we run 7/10 to 21/10 xxxxxxxxxxx Discuss next week at DESY 2 March: W delivery schedule Opt for 4 batches each 5 absorber plates all 2 weeks from mid June onwards Discuss when and how to transport “Cassettes” from DESY to CERN and Rack with read out and calibration electronics from FNAL to CERN Test beam setup Define “all” cables and gas pipes. To be installed by 29 April 2010 (No user in T9 period from 16/8 to 19/9, but will maybe be filled)

T9 Test Beam Setup Calorimeter Prototype Beam 1.3 above floor Beam Counter Delay wire chamber Area 10cm * 10cm existing Cherenkov (CO2) to separate e- from π- 1Gev 50% e- + 50% π- 5Gev 10% e- + 90% π- Scintillators Fingers 1cm *10 cm General 10cm * 10cm Veto 25cm * 25 cm (with hole of 4cm) Veto behind < 50 cm * 50cm Calorimeter Prototype Telescope GEM chamber σ ≈ 1mm T9 Test Beam Setup

Triple-GEM Detector “Standard” size : 10cm * 10cm Ar/C02 70:30 gas-mixture One may choose pad plane geometry

Cathode Plane and Read Out 40 mm 3.6 mm 100 mm Resolution: 11*11 = 121 Channels Digital read out AVP-25 chip 128 channels per chip Need 1 chip/ chamber H. Mueller is producing read out chain Central scintillator