EUDET Detector R&D towards the International Linear Collider

Slides:



Advertisements
Similar presentations
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Advertisements

GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Ingrid-Maria Gregor, EUDET EUDET: Status and Perspectives Ingrid-Maria Gregor, DESY  The EUDET initiative  EUDET activities  Joint Research Activities.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
Information on the ANNUAL REPORT OCTOBER 18 th, 2006.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
1 THE CITY OF TOMORROW AND CULTURAL HERITAGE Thierry PROST EUROPEAN COMMISSION - DG RTD Directorate I - Preserving the Ecosystem Tel: +32/2/ Fax:
1 EUDET Status Preparation Annual Meeting Information Annual Report Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
AIDA negotiation process AIDA NCP Meeting,
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
Volvox Finance 2 How we will manage the Finance Angela Pettit – Contracts Officer.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Reporting Kick-Off Meeting in Geneva. Kick-Off Meeting in Geneva: Budget and FinancesSlide Reporting Outline 1.Reports and deliverables 2.Deadlines.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2008 NIKHEF, October 8th.
Status of Annual Report : Submitting of the Annual Report with only 3-days delay..not final version due to the non-final financial information.
1 EUDET Detector R&D towards the International Linear Collider Status and Plans Joachim Mnich VLCW06 Vancouver, July 2006.
CARE Steering Committee R. Aleksan CARE Steering Committee Meeting, September 5-6, Introduction et.
CARE Governing Board R. Aleksan CARE Governing Board Meeting, November 25, Introduction et objectives.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
1 EUDET Report on Management & Summary toTransnational Access Felix Sefkow Extended Steering Committee Meeting August 31, 2010 Outline:  Management Summary.
DIRAC Phase 1 Reporting, Dec. 1 st, 2005 Reporting to the Commission Periodic Reports Interim Activity Reports Project Deliverables Final Reports.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2007 Palaiseau, October 10th Outline:  Summary and Outlook EUDET  Introdution to FP7 discussion.
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
1 EUDET Report on Management & Summary Transnational Access Felix Sefkow DESY Annual Meeting 2009 October 20, 2009 Outline:  Management Summary  Annual.
AIDA Governing Board meeting 30 March 2012, DESY Use of resources in Y1 and distribution of EC pre-financing (2nd installment) S. Stavrev, CERN Administrative.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
EUDET: Infrastructure for ILC detector R&D Felix Sefkow ILC detector test beam workshop at Fermilab January 17-19, 2007.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
Avena genetic resources for quality in human consumption (AVEQ) Startup Meeting, Clermont Ferrand 2007 Federal Centre of Breeding Research on Cultivated.
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
WP8 Project management Milan Gocić University of Niš
AMICI WP1 – Management, coordination and dissemination
European Network for Novel Accelerators (EuroNNAc2): WP7
4th. Plenary Meeting, Edinburgh, May 2010
By Lillian Irene Stormo, HiB
EC project periodic and continuous reporting
European Network for Novel Accelerators (EuroNNAc)
EUDET Management Report Joachim Mnich EUDET Annual Meeting MPI Munich
Extended Steering Committee Meeting
Granular calorimeters Infrastructure
EU Institution Board 1 representative of each participating institute
European Network for Novel Accelerators (EuroNNAc)
ILC Detector R&D in Japan
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
WP-conveners 3rd phone meeting
as of today 123 registered participants
SKADS Controller’s Meeting Timeline Annual Financial Report
Cécile Germain-Renaud Grid Observatory meeting 19 October 2007 Orsay
EUDET Extended SC meeting 31 August 2009
AMICI WP1 – Management, coordination and dissemination
TOP6 – WP4 Coordination and Management JPICH Coordination Office
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
WP 1 Management and Coordination
TOP6 – WP4 Coordination and Management JPICH Coordination Office
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

EUDET Detector R&D towards the International Linear Collider Status and Plans CdLT SOCLE 2009 Slides from J. Mnich, F. Sefkow, L. Linsen

Introduction to EUDET EUDET : Detector R&D towards the International Linear Collider FP6 : Integrated Infrastructure Initiative (I3) Budget: 21.5 million Euro total 7.0 million Euro EU contribution Manpower: ≈ 57 FTE total ≈ 17 FTE funded by EU 31 partner institutes in Europe provide own commitments & receive EU funds 22 associated institutes worldwide contribute to design & construction of infrastructures interested in later exploitation

EUDET Partner Institutes: Charles University Prague IPASCR Prague HIP Helsinki LPC Clermont-Ferrand LPSC Grenoble LPHNE Paris Ecole Polytechnique Palaiseau LAL Orsay IReS Strasbourg CEA Saclay DESY Bonn University Freiburg University Hamburg University Mannheim University MPI Munich Rostock University Tel Aviv University INFN Ferrara INFN Milan INFN Pavia INFN Rome NIKHEF Amsterdam AGH Cracow INPPAS Cracow CSIC Santander Lund University CERN Geneva Geneva University Bristol University UCL London + 22 associated institutes

The EUDET Map EUDET partners EUDET associates Novosibirsk Protvino ITEP MPHI MSU Obninsk EUDET partners EUDET associates KEK (Japan) May 2006

EUDET Struture I3 projects based on three pilars (mandatory): Management 4% Networking 9% TA 2% Magnet & Pixel Telescope 18% Tracking 33% Calorimeter 33% I3 projects based on three pilars (mandatory):

EUDET Management [F. Sefkow] External Scientific Advisory Board Ph. Burrows D. Karlen Th. Müller L. Rolandi T. Takeshita JRA1 Test Beam Infrastruture I.-M. Gregor DESY JRA2 Tracking Detectors J. Timmermans NIKHEF JRA3 Calorimeter Ch. de la Taille LAL Orsay NA2 Detector R&D Network K. Desch Bonn I3 Coordinator F.Sefkow Steering Committee EU as of August 31st Bernard Salanon ↔ Hugues Crutzen European members form Selection Board for TA

Steering Committee Bi-weekly telephone meetings including short minutes accesible on (protected) EUDET web page Preparation of Annual Meeting Approval of reports Agenda of EUDET meetings INDICO category created at http://ilcagenda.cern.ch/ → Detector Design & Physics Studies → Detector R&D collaborations or go directly to http://ilcagenda.cern.ch/categoryDisplay.py?categId=85 Should be used for all EUDET related meetings e.g. the Annual Meeting or JRA meetings to have all agendas, talks, documents etc. at one place

Mid-term Review On 08.04.2009 EUDET has successfully passed the Mid Term Review. All activities provided overview slides on the following requested items: role of each partner summary of main achievements to date dissemination of knowledge description of work until the end of EUDET The full agenda of the meeting and all presentations on the project can be found on eudet.org under EUDET/Internal

Some citation from the evaluation report to Mid-term Review

Paperwork Form C Time sheets Milestones => report Deliverables => report annual report (one more) Excell sheets…  

EUDET Reports and Memos For internal communication and dissemination of knowledge EUDET Memo: not refereed, for internal communication EUDET Report: to be agreed by people involved and the SC for papers, conference proceedings, etc. See web page for more info, templates and examples Total Statistic for 2006-2009:   Number of Memos Number of Reports Number of Milestones 2006 11 6 8 2007 59 30 2008 56 9 32 2009 3 4 12 Total 129

Annual Report 2008 Short history: 18.02: Submitting of the Annual Report with 3-days delay Unfortunately the set we sent was not final due to the non-final financial information from CNRS 03.03: Obtaining of preliminary assessment of the financial report 23.03: Submitting of revised as well finalized version of AR 08.04: Second assessment from Brussels 04.05: it has been pointed out that UHEI shall provide audit certificate to prove the incurred costs in 2008. *Audit on another EU contract in Heidelberg has given findings which are of systematic nature and it leads to consistency check over all other EU contracts* This issue has been solved in June: UHEI provided audit certificate and showed that the findings are not applicable to EUDET 06.07: now CSIC shall provide audit certificate to prove the incurred costs in 2008. The discussions between CSIC administration and the Commission's services are still ongoing….The costs from CSIC has been set to 0,00 EURO while the situation remains unclear 31.07: CNRS provided already now the financial statement for the first semester of 2009. 08.09: DESY obtained 4th Installment and on 15.09 it has been transferred to the partners

4th Installment, transferred to the partners on 15.09.2009 Underspending

Conclusion well focused (ILC) well funded (7 M€ EU money = 50% total) EUDET = good project well focused (ILC) well funded (7 M€ EU money = 50% total) reasonable size (31 partners) bureaucracy tolerable appearing as CNRS added a lot of complication overall consolidation : wait for last input shuttle between IN2P3 and DRs no power over administration FP7 more complex new rules many more partners and projects