CTF3 Collaboration Technical Meeting January 2008

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
1 Welcome to all Outline: CDR status planning information information still needed Goals of meeting and practical information.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
 High Power RF Systems (352 MHZ - 12 GHz)  High Efficiency Power Sources  High Voltage Systems  High Gradient Accelerating Structures.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
D. SchulteICHEP Paris, July 24, CLIC Progress and Status D. Schulte for the CLIC study team.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
J.P.Delahaye Introduction to the X Band Workshop X Band Accelerating Structure Design and Test Program Workshop WELCOME CIEMAT/Spain, CEA SACLAY/France,
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
CLIC Overview Andrea Latina (APC/FNAL) for the CLIC/CTF3 Collaboration June 10, Low Emittance Muon Collider Workshop, FNAL.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
CERN : a gateway to fundamental research Research & Discovery Training Technology Collaborating.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
1 Tunnel implementations (laser straight) Central MDI & Interaction Region -Introduction -Feasibility Studies -CDR status -Implementation issues -Plans.
TBTS Test Program & Schedule G. Riddone
1 CTF3 collaboration meeting Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
The CLIC project – status and plans Outline: The CLIC machine concept Feasibility studies and CDR status Technical progress The CDR volumes Implementation.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
1 CTF3 Collaboration Board Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
Introduction to the CLIC study 24 March 2010 Tsinghua University W. Wuensch.
CLIC Transfer System Introduction Daniel Schulte for the CLIC team March 11, 2010.
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
J.P.Delahaye Journees Thematiques DAPNIA “Accelerateurs” ( ) 1 The CLIC Study and the DAPNIA participation The world-wide scene about Linear Colliders.
XB-10 1st December 2010TBTS Status- Wilfrid Farabolini1 Status of the CLIC Two-Beam Test Stand 1.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
for the CLIC Study team and CLIC Collaboration
CALIFES A proposed electron beam test facility at CERN
CLIC work program and milestones
Phase Feed-Forward Piotr Skowroński (CERN)
First Year of Operation at the Two-beam Test Stand
CTF3 Collaboration Board May 2009 G.Geschonke
M.J. Barnes : Canadian Involvement with LHC
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
Steering algorithm experience at CTF3
Input to Strategy currently planned
CLEX* Status and Plans CTF3 complex CLEX
CLIC detector, difference with the ILC case
Status of the CLIC main beam injectors
CLIC-Spain collaboration report
TBL, Status, Plans, Experiments
Have a chance to operate your own beam at CERN
Report from the 4th meeting of CLIC ACE
Collaboration New collaborators in 2016:
ILC Accelerator Activities at Spain
The CLIC project IEEE LC event, October 2012 Steinar Stapnes
Task 2.3 “Sustainability”
Measurements, ideas, curiosities
Accelerators R&D at IFIC “Reunión de Electrónicos”, May 2010
CLIC Beam Instrumentation
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

CTF3 Collaboration Technical Meeting 21-21 January 2008 Concluding Remarks 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University

CTF3 - a world wide accelerator development collaboration WORLD WIDE CLIC COLLABORATION Ankara University (Turkey) Berlin Tech. Univ. (Germany) BINP (Russia) CERN CIEMAT (Spain) DAPNIA/Saclay (France) Department of Atomic Energy (India) Finnish Industry (Finland) Helsinki Institute of Physics (Finland) IAP (Russia) Instituto de Fisica Corpuscular (Spain) INFN / LNF (Italy) JASRI (Japan) JINR (Russia) KEK (Japan) LAL/Orsay (France) LAPP/ESIA (France) LLBL/LBL (USA) North-West. Univ. Illinois (USA) Polytech. University of Catalonia (Spain) RAL (England) SLAC (USA) Svedberg Laboratory (Sweden) Uppsala University (Sweden) 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University

CTF3 Collaborationl Meeting Tord Ekelof Uppsala University Presentations 2004 2005 DL CR 2006/7 5-7. CLEX 2007-2009 8. Photo injector / laser Beam up to here, exit Combiner Ring 4. TL2 2007 / 8 1. Beam Diagnostics 2. RF system/ X-band source 3.Kickers/Tail Clippers 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University

CTF3 Collaborationl Meeting Tord Ekelof Uppsala University Presentations 5. TBL CIEMAT magnet movers, PETS prototype,(+ series ????), PETS tank (series ???) UPC & IFIC : BPM development + electronics (series ???) CERN overall responsibility, optics, RF equipment, diagnostics, infrastructure, quadrupoles ??? 6. CALIF CEA Dapnia Saclay overall responsibility CERN CEA laser beam line, laser beam conditioning LAL RF gun for photo injector 7. Uppsal 7 Two Beam Test Stand CERN PETS and Accelerating structure 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University

CTF3 Collaborationl Meeting Tord Ekelof Uppsala University A few comments on…. Key issues 2008-2010 LHC results in 2010 and CLIC CTF3 beyond 2010 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University

CTF3 Collaborationl Meeting Tord Ekelof Uppsala University Key issues 2008-2010 Beam Diagnostics – many new devises being developed, tested, installed and used in CTF3 by many different collaborators. Crucial for optimizing and controlling the CTF3 complex. RF system – a work horse that must not fail. Stand-alone X-band source primordial for achieving a 12 GHz (not 11.4) GHz accelerating structure. Kickers – the tail clipper crucial for having a flexible pulse length. TL2 – no T2, no CLEX. Components from many collaborators. TBL – the stability of the Drive Beam when decelerated through many PETS is one of the key issues for CLIC. To go from 1 to 16 PETS will a big leap. How many PETS will we have (can we afford) for CTF3? 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University

CTF3 Collaborationl Meeting Tord Ekelof Uppsala University Probe Beam – CALIFE well advanced and coherent project. The photon injector a critical component. Two beam Test Stand – will serve as first test bench for the PETS and later constitute a first, very short test section of CLIC. Extensively instrumented. One crucial question is; what is the effect on the beam of a spark, which spark frequency is tolerable? Photo injector – crucial for the optimal operation of both the drive beam and the probe beam. Acceleration structures – currently work with 11.4 GHz structures can only be done SLAC and KEK (not reported at this meeting). Underlines importance of getting the stand-alone 12 GHz band power source started to test final structures. Operation of the overall CTF3 system invaluable experience. CLIC3 -> CLIC extrapolation, tests and simulations required; Drive beam current 35A -> 100 A Drive beam energy 100 MeV -> 2500 MeV Pulse length 140 ns -> 300 ns 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University

CTF3 Collaborationl Meeting Tord Ekelof Uppsala University CTF3 beyond 2010 CLIC development started in 1985 – in operation earliest by 2023, will last till ~2036 – a 50 years time span! (LEP ~20 years, LHC ~30 years). This evolution represents a complication for HEP. Current CTF3 planning up to 2010 Establishment of detailed planning for 2010-2013 has now become necessary 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University

CTF3 Collaborationl Meeting Tord Ekelof Uppsala University LHC results in 2010 and CLIC Impossible to predict! If new particles and interactions clearly visible, which is their energy scale - 0.5, 1 or 3 TeV? If not visible before 2010, maybe visible a few years later or after LHC upgrade? 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University

Conclusion The CTF3 project has come to play an increasingly important role for our long-term possibilities to explore the fundamental structures and forces of Matter and the understanding of the origins of Universe – the very substantial progress reported at this meeting is therefore of great significance. 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University

CTF3 Collaborationl Meeting Tord Ekelof Uppsala University 2008-01-23 CTF3 Collaborationl Meeting Tord Ekelof Uppsala University