Local Area Planning Update to TRANSAC – June 29, 2017

Slides:



Advertisements
Similar presentations
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Advertisements

1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Cleco Transmission Planning Summit 2012
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
1 Local Area Planning Update to TRANSAC – December 16, 2014.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Midwest Energy, Inc. Transmission Planning and Expansion
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Houston Area Dynamic Reactive Project March 11,
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
1 Local Area Planning Update to TRANSAC – March 11, 2015.
1 Transmission Advisory Group Meeting January 25, 2007 Raleigh, NC.
Electric Transmission Planning Local Area Planning Update Presentation to TRANSAC January 24, 2013.
1 Local Area Planning Update to TRANSAC – Sept 16, 2015 Mitigation Update, Uncertainty Scenarios, VAR Margin Study.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Freeport Area Master Plan Project -
2016 RTP Update November, 2016 RPG Meeting.
ERCOT 2009 Five-Year Transmission Plan Update
Local Area Planning Update to TRANSAC – December 21, 2016
Local Area Planning Update to TRANSAC – September 15, 2016
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Electric Utility Master Plan Update
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
Local Area Planning Update to TRANSAC – March 15, 2017
Local Area Planning Update – TRANSAC
DEC System Voltage Planning - June 2018
Pacific Power Seismic Preparedness Update
Local Area Planning Update to TRANSAC – September 26, 2018
Presentation transcript:

Local Area Planning Update to TRANSAC – June 29, 2017 20pt Font – bold for presentation name, regular for date Local Area Planning Update to TRANSAC – June 29, 2017 Mitigation Update, Uncertainty Scenarios, and Next Steps

2014/2015 Study Plan Mitigation Update Roundup Area 50/69 kV Low Voltage (N-0) — Mitigation Complete Distribution capacitors added to the Sumatra and Ivanhoe 69 kV substations in 2016. Additional capacitors to be added to the Melstone 50 kV system in 2018. Mill Creek 100 kV Bus Fault (et al.) — Mitigation Complete Converted the 50 kV from Drummond – Philipsburg – Anaconda City to 100 kV in 2017. Ennis – Lone Mountain 69 kV Line — Mitigation Complete Completed conversion of the Jackrabbit – Meadow Village 69 kV to 161 kV in 2016. Dillon-Salmon 161 or 69 kV Bus Fault (et al.) — Mitigation Complete Rebuilt the 161 kV bus and added a 69 kV bus sectionalizing breaker. Upgraded both 161/69 kV autotransformers in 2015.

2014/2015 Study Plan Mitigation Update Rattlesnake 100 kV Bus Fault — Reprioritized Adding a sectionalizing breaker to the 100 kV bus is scheduled for 2018. Billings 230 kV Issues — Reprioritized Broadview – Wicks Lane <=> Alkali Creek 230 kV Lines (N-1) Shorey Road – Alkali Creek 230 kV Line Mitigation for the two above system conditions will be addressed as part of System Problem currently ranked #4. Lower Duck Creek – Big Timber Auto – Columbus-Rapelje 161 kV Line — Reprioritized Adding 161 kV line breakers at Big Timber Auto scheduled for 2018.

2016/2017 Study Plan Mitigation — Top 15 Rank Columbus-Rapelje – Columbus – Chrome Jct. 100 kV Line (N-1) ❶ Columbus-Rapelje 230/100 kV auto built in 2015. — Mitigation Complete New 100 kV line construction from Columbus-Rapelje – Nye Auto scheduled for completion in 2017. Billings – Laurel 100 kV Lines (2) (N-1) ❷ Build a 12-mile, 230 kV line from Baseline – Laurel Auto. Establish a 230/100 kV auto at Laurel Auto. Note: Mitigation required due to Customer Load Forecast increase. Missoula #4 – Hamilton Heights ‘A’ & ‘B’ 161 kV Lines (N-1-1) ❸ New Stevensville substation built in 2015/2016. — Mitigation Complete Add 12 MVAr of capacitors at Stevensville, scheduled for 2018. Convert portions of the 69 kV system from Missoula to Hamilton to 161 kV. Note: NWE has determined that a NERC corrective action plan is not required for this event; the unlikelihood of this event (which has never occurred) doesn’t justify the expense.

2016/2017 Study Plan Mitigation — Top 15 Rank Broadview – Wicks Lane <=> Alkali Creek 230 kV Lines (N-1-1) ❹ Build a new 20-25 mile, 230 kV line from Broadview – Shorey Road which provides route diversity from the two existing Broadview – Billings 230 kV lines. Merits: Serves as mitigation for lower-ranked Billings area system problems. Great Falls 100 kV Lines (12 combinations) (N-1-1) ❺ Establish an N-1 curtailment operating guide for the Great Falls area, which focuses on limiting non-firm transfers and South of Great Falls flows. Great Falls Swyd – Crooked Falls 100 kV Lines (2 of 3) (N-1-1) ❻ Establish a hydro run-back scheme as part of a curtailment operating guide for the Great Falls area.

2016/2017 Study Plan Mitigation — Top 15 Rank Great Falls Swyd – Montana Refining 100 kV Line (N-1) ❼ Reconductor two 100 kV lines with high-temp conductor: Great Falls Switchyard – Great Falls Riverview Great Falls Riverview – Great Falls Northwest East Helena 100/69 kV Autotransformer ≡ 100 kV Bus (N-1) ❽ Build a new substation (Custer Auto) to provide a second reliable 100 kV source to the Helena area 69 kV system. Construct a new 100 kV line from Custer Auto to both the Helena Valley and York Road (aka Lake Helena) substations. East Gallatin 161/50 kV Autotransformer ≡ 161 kV Bus (N-1) ❾ Build a new substation (Belgrade West) to provide another reliable 161 kV source to the Bozeman area 50 kV system. Merits: Joint effort with Distribution Planning as a new Belgrade distribution substation is needed, and off-loads a heavily loaded Trident Auto.

2016/2017 Study Plan Mitigation — Top 15 Rank Assiniboine 161/69 kV Autotransformer ≡ 161 kV Bus (N-1) ❿ Rebuild Assiniboine Substation to enhance reliability. Billings City 100 kV Lines (6 combinations) (N-1-1) ⓫ Convert Billings 8th Street – Laurel 50 kV to 100 kV. Build a five-mile 100 kV line from Shiloh to a new switchyard, tapping the converted Billings 8th Street – Laurel 100 kV line. Merits: Coordinated effort with Distribution Planning to establish a potential new distribution site. Missoula #4 – Bonner <=> Missoula #7 161 kV Lines (N-1-1) ⓬ Build a 10-15 mile, 161 kV line from Rattlesnake to Missoula #4. Note: NWE has determined that a NERC corrective action plan is not required for this event; the unlikelihood of this event (which has never occurred) doesn’t justify the expense at this time.

2016/2017 Study Plan Mitigation — Top 15 Rank Missoula City 100 kV Lines (4 combinations) (N-1-1) ⓭ Reconductor Reserve Street – City Sub #1 100 kV. Upgrade Miller Creek #4 161/100 kV autotransformer. Replace current-limiting device at Industrial Sub #3. Crooked Falls – Great Falls Northeast 100 kV Line (N-1) ⓮ Reconductor Montana Refining – City 100 kV with high-temp conductor. Billings Steamplant 230 kV Bus-Tie Breaker ⓯ Establish a pair of 230/100 kV autos at Rimrock. Merits: Serves as mitigation for lower-ranked Billings area system problems.

Uncertainty Scenarios Uncertainty Scenarios under consideration Suggestions: High Renewable Resources System-Wide Existing Projects dispatched to capacity Extreme Localized Growth 5-year summer peak load sensitivity case

Next Steps Quarter 7 Quarter 8 Run Uncertainty Scenarios Perform Reactive Resource Assessment (if deemed necessary) Complete draft of “The Book” Quarter 8 Send out Draft of “The Book” for stakeholder review Conduct Public Meetings – Butte and Helena Finalize “The Book” and close out the 2016/2017 Local Area Planning Cycle

Questions? Text, 60pt font, white