IR Detector - Test cryostat For IPNL - Shrinkage measurement at 120 K

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

1 Geometric optics Light in geometric optics is discussed in rays and represented by a straight line with an arrow indicating the propagation direction.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
IRSIS : Preliminary Fiber bundle design Original datas : Fiber focal plane of F/5,5 telescope primary focal plane - TBC Telescope FOV : 15’x15’
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Physics 52 - Heat and Optics Dr. Joseph F. Becker Physics Department San Jose State University © 2003 J. F. Becker San Jose State University Physics 52.
Design Office meeting Design office meeting.
Tracking integration in concentrating photovoltaic using laterally moving optics HONGZHANG MA DEC OPTI521 INTRODUCTORY OPTO-MECHANICAL ENGINEERING.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
CBM Superconducting Dipole Magnet
Chapter 23 Light. Chapter Ray Model of Light Light travels in straight lines Ray model of light - light travels in straight line paths called.
Can YOU determine the general characteristics of the “image” 1.Its location (closer than, further than or the same distance as the object and the mirror)
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Chapter 7 Light and Geometric Optics
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Lesson 72, day 2 Pyramids and Cones. Pyramids Pyramid: geometric solid with a polygon base, and triangle faces (lateral faces) Vertex: top of the pyramid.
CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting Status of the R3B-GLAD Magnet DIRAC-Phase-1 Annual Report Meeting 26 September 2006 Bernard Gastineau.
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
12th HL-LHC Parameter and Layout Committee meeting.
Dec
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
RAY DIAGRAMS Steps for drawing a plane mirror ray diagram: 1. A ray that strikes perpendicular to the mirror surface, reflects perpendicular to the mirror.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.
Camera Motion System Requirement Design Details FEA.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
SNAP spectrograph demonstrator : AIT/AIV Cedric CERNA CNRS (IN2P3,INSU) FRANCE,
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Integral Field Spectrograph Eric Prieto LAM. How to do 3D spectroscopy.
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Roadmap for triplet cryostats
Upgrade activities at Clermont-Ferrand
End-cap Mechanics FDR Overview of the Project
Status of works on the Collaboration Contract between IHEP and FAIR
IR Detector - Test cryostat : Machining
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
The SNAP Integral Field Spectrograph Overview of the project
Mechanics: (Tim).
SciFi option for neutrino target tracker
Vertex Detector Mechanical R&D Design Questions and Issues
NP04 CPA/FC/HV Interfaces
Integration Plan for the
An IFU slicer spectrometer for SNAP
Software Development Process
Reflection Physics Chapter 18a.
Objective- To use an equation to graph the
Low-Cost Fundus Camera
WA105: Order Status IFAE Thorsten Lux.
Standardized CCD and MCT detector mounting configurations
Advantages and Challenges of this design Today status of the design
Development of Reference Geometry DB of ATLAS Detector Reproduction of Inner Detector Kobakhidze Shota 25/04/2019.
Presentation transcript:

Méchanic at the CPPM - 29/06/05 Françoise RIVIERE – Jean-Luc GIMENEZ - Pierre KARST IR Detector - Test cryostat For IPNL - Shrinkage measurement at 120 K - Integration of the detector into the Herschel cryostat Demonstrator - Update of the requirements (optics, alignment, reference, interfaces). - Set up of the nomenclature, management of the drawing (SmarTeam). - Preliminary design of the optic supports (technical solutions, functional and risk analysis).

Status of the design of the test cryostat DONE Available quotation for the components Drawing management with Smarteam (IN2P3 database) 3 D design in progress TO BE DONE : - To freeze the design of the rear face - To freeze the dimensions in respect with the choice of the component supplier - To design the supporting frame - To increase the dimension of the view port - To define the details for the assembly (welding)  Detail drawings - To find the optimal treatment in order to reach the best emissivity of the internal surfaces.

Shrinkage measurement at 120 K Proposal of the very preliminary concept (to be developped by the collaboration)

Integration of the detector into the Herschel cryostat Herschel cryostat mediun plane

Integration of the detector into the Herschel cryostat The signal cable is connected to the closer feedthrough (f 60) The other ones are to be supported and the routing to be defined towards a larger available feedthrough (f 100)

SPECTROGRAPH DEMONSTATOR Update of the requirements Geometrical requirement of the optics (01/07/05) Perpendicularity Concentricity with the reflective surface axis Optical alignment procedure (01/07/05) Requirement for each module Measurable surfaces defining an absolute reference Interfaces for the fixation and the positionning of two optical components for the alignment procedure (input and output beam) Ouput focal plane Module reference Input focal plane

Set up of the nomenclature, management of the drawing Drawing management with SmarTeam (IN2P3 database)

Preliminary design of the optic supports Fixation with glue Glues in competition : - 2850 FT (Emerson & Cuming) - 2216 (3M) - RTV 566 (MG chemicals)

Preliminary design of the optic supports Elastic fixation Mirror Springs Next step : developping the technical functional analysis of the optic support, and make the choice by the risk analysis method (AMDEC). Expected before the end of July.