PROJECT NAME: “Mechanical System for school of optical” (An-Najah university College) Prepared by: Abdulla Alawneh Islam Salahat Mohammed.

Slides:



Advertisements
Similar presentations
HOT & COLD WATER SYSTEMS
Advertisements

AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING.
The Dalles Middle School
Supervisor : Eng. Ramez Al Khaldi Prepared by : Bahaa Yousef Malhis Nodar Hisham Sabbah Ameer Ghazi Malhis Ala’a Abd An-Naser Diab.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Sustainability in the Finger Lakes Geothermal at Hunt Country Vineyards.
Five star hotel in Nablus
Heating, Ventilating, and Air-Conditioning (HVAC)
DESN 100: Week 4 Brief Overview of Industrial piping Structural drafting Civil drafting HVAC Electrical Schematics.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Granulation Project 2 MECHANICAL SYSTEMS IN BUILDINGS IBN SENA HOSPITAL IBN SENA HOSPITAL Prepared by: Abdullah Hasayen Mazin Khalid Moath Ayyash Mohammad.
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING DEPARTEMENT OF MECHANICAL ENGINEERING MECHANICAL SYSTEMS OF AL-OYOON HOSPITAL-NABLUS Graduation Project.
HVAC SYSTEM DESIGN Businessmen Club Supervisor: Dr Salameh Abdulfattah
May 2013 Supervisor Ins.RamezKhaldi Luay A. Aghbar ( ) Husni H. Malysha ( ) Mohammad S. Ahmad ( ) Yousif F.Abdi ( )
PROJECT NAME: “Mechanical System for school of optical” (An-Najah university College) Prep ared by: Abdulla Alawneh Islam Salahat Mohammed Jaber Majdi.
Management training Jumeirah beach residence sector 3 Presented by November 15 th 2006.
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING MECHANICAL ENGINEERING DEPARTMANT Mechanical Systems for jenin headquarter building Supervisor:The.
The students: Mohammad Shabaro ( ) Mahmoud Mousa ( ) Yosri Asfour ( ) Supervisor: Dr. Iyad Assaf 1.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics Field Experience with the HVAC-System of the Flemish.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
NGfL CYMRU GCaD PLUMBING APPLIANCES & COMPONENTS.
Prepared by : Hashem Ihasn Janajreh Mohammad Abu Sarah Sari Khaled Sobeh Ahmad Medhat Attiyah Supervisor : Dr. Iyad.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Drugs Addicts Rehabilitation Center
Prepared by : Ameed mahmoud qzaih Mohammad mustafa yaseen Samer abdelrazaq khanfar Supervisor : Dr. Eyad Assaf.
Prepared by : Abd Aljabbar Rabaya Ammar Salloum Sameh Shawahni Supervisor : Dr. Eyad Assaf 1.
An- Najah National University 12/29/20131Multisport hall.
Graduation Project Mechanical system for Building of_ al Kuwait Surgery Specialized Hospital.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Design of bulk supply network in the southern West Bank Prepared by: Muna Faidi Aya Nofal.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
Heat transfer Steady state conditions not for dynamic systems in buildings through walls, roofs, floors, windows, doors building structures and U-values.
WSHP Systems 1.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Maria’s Restaurant Chapter 2 Section 9
}السلام عليكم ورحمة الله وبركاته{
Plumbing system fundamental and design course
Unit 37: Fluid containment Dr
HVAC Building & Floor Cooling System
An-Najah Sport Center An-Najah National University
water to water heat-pump
CERN Data Centre ‘Building 513 on the Meyrin Site’
Studying Geothermal Heat Pump in Palestine
Heating, Ventilating, and Air Conditioning
Heating Ventilating and Air Conditioning
FRESNO COUNTY WEST ANNEX JAIL
HVAC SYSTEM DESIGN ALMAQASED HOSPITAL
Al-Najah National University Mechanical engineering department
Integrative Design of a Secondary School
DOMESTIC HEATING DESIGN PRINCIPLES
Mechanical System For AL-Rehan Hospital
Ambient Temperature (˚C) Results and Discussion
Unit 37: Fluid containment Dr
PLUMBING APPLIANCES & COMPONENTS
Design Of Water Distribution Network Of Misilyah Village Using EPANET
Heating, Ventilating, and Air-Conditioning
Graduation Project – 2 Mini-Mall
Prepared By : Supervisor : Eng. Abdulhakeem Al- Jawhari Hareth Jepara
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
The sport hall.
Adding Zones to Existing Systems
PROJECT NAME: HVAC AND MECHANICAL SYSTEMS DESIGN
Mechanical Systems Design for Al-Bahrain Hospital
Mechanical Systems For Al-Zakah Hospital
Maria’s Restaurant Chapter 2 Section 9
Prasanna Narangoda MSc, Bsc (Eng) Hons, C Eng MIESL, MASHRAE, APGBCSL, MLABSE 1 Delivered to UNIVOTEK 22 nd June 2019.
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

PROJECT NAME: “Mechanical System for school of optical” (An-Najah university College) Prepared by: Abdulla Alawneh Islam Salahat Mohammed Jaber Majdi Shwawra

INTRODUCTION: The aim of our project is to design installation of heating, ventilation and air condition system (HVAC) for the school of optical which will be built in Nablus city / Palestine. The school consist of six floors, two floor up the ground, three basement and aground. There are different rooms inside the building .

Building’s Description Location Country : Palestine / west bank . City: Nablus. Street Al_Jonead Nablus . Elevation : 569.45 m above sea level Latitude: 32N Longitude : 35 E Building face sits at north orientation. The wind speed in Nablus above 5 m/s

nORTH east elevation:

Results: heating Floor No. Heating Load (Kw) (TON) (CFM) Basement 3 73.7 21.0 8422.8 Basement 2 60.9 17.4 6960.0 Basement 1 79.6 22.7 9097.1 Ground Floor 75.6 21.6 8640.0 First Floor 82.7 23.6 9451.4 Second Floor 95.3 27.2 10891.4 Total heating load 467.8 133.6 53462.8

Cooling: 80.1 103.2 116.3 90 .0 76.0 65.0 Floor No. Cooling Load (Kw) (TON) (CFM Basement 3 80.1 22.9 9160.4 Basement 2 103.2 29.4 11798.7 Basement 1 116.3 33.2 13293.4 Ground Floor 90 .0 25.7 10285.7 First Floor 76.0 21.7 8685.7 Second Floor 65.0 18.5 7428.5 Total Cooling load 507 145 60652.7

AUTOCAD DRAWING

Data of designing drainage system Floor No. Fixture Units Basement 2 125 Basement 1 158 Ground Floor 117 First Floor 120 Second Floor 100 Total 620 The main Bulding Drain is 6 in. And the size of stack as in table is 4 in .

AUTOCAD DRAWING

Demand of potable water system Floor No. Fixture Units Basement 3 105 Basement 2 109 Basement 1 99 Ground Floor 96 First Floor 94 Second Floor 98 Total 601 Total NO of F.U =601 F.U, From table no 3.3 the total demand is 170 gpm. The cold water demand = 170 × 0.75 = 127.5 GPM The hot water demand = 170 × 0.25 = 42.5 GPM. -Domestic water =8.7 kw. -Flush water tank 380 f.u = 105 gpm. -Domestic water tank 221 f.u =70 gpm = 70*0.25= 17.5 GPM = 3.97 m3/h  

AUTOCAD DRAWING

Fire system In our project we use the fire hose cabinet which distributed in each floor such as each cabinet cover (15 m) with 50 gpm.    And we use Carbon Dioxide (CO2) extinguishers Dry chemical Extinguishers.  

AUTOCAD DRAWING

The Chiller code is: W P S a 150 2 S EQUIPMENTS SELECTION Fan Coil Units Selection In Our project we used Ducted FCU or Room air from Petra catalogs is CBP type or P as shown in the code. Chiller Selection - The Total sum of cooling load = 508 KW = 145 Ton So we select 150 ton R 134-a chiller it’s manufactured with three compressors and with the same compressors type. The Chiller code is: W P S a 150 2 S  

Boiler Selection and Ignition flame - The Boiler is selected from Lamborghini company, the catalog of Lamborghini company is used to selections depending on the Total sum of Heating load total in KW Total heating = Q)Heating load 514 kw +Q)domestic = 514+8.7 = 522 KW Q) Boiler total =1.1*522.7= 575 KW -from Lamborghini company catalogs we choose boiler and ignition flame, are 1- BIG –FK 650 2- ECO70 /2

PUMP SELECTION The pumps is selected from WILO Company, by using programe: Description of PUMP Flow rate Head H (m) TYP OF PUMP FLUSH 105(gpm) 120 COR-2MVIE5205/VR DOMESTIC 70(gpm) COR-2MVIE9504/ER-PN16 FIRE 600 (L/S) SCP 400/660DV CHILLER 5.5(L/S) NL 40/315 HEATING 8.5(L/S) NL 50/315

THE END