PREX II Vacuum Box, Shielding and Septum Design Status

Slides:



Advertisements
Similar presentations
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Advertisements

Recap of heat loads and peak doses from HL-LHC Q1 to Q7 L.S. Esposito, F. Cerutti HL-LHC WP3 meeting, 22 May 2014.
HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Aluminium Quarter Manufacture Peter Savage Block preparation.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Vacuum Vessel Production Readiness Review
SPECTRAP - GSI progress report and status overview.
F.Willeke: HERA, 58th PRC Report from HERA 58 th Physics Research Committee Meeting at DESY October 28, 2004 F. Willeke, DESY Summary of the 2004 Proton.
Progress on the MICE Cooling Channel Solenoid Magnet System
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
COMMERCIAL REFRIGERATION
Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents.
Carbon-Epoxy Composite Base Plates for the PHOBOS Spectrometer Arms J.Michalowski, M.Stodulski The H.Niewodniczanski Institute of Nuclear Physics, Krakow.
ARIES -AT Study L.M. Waganer ARIES 3/20-21/00 Page1 ARIES-AT Vacuum Vessel Design Approach L. M. Waganer The Boeing Company 20 March 2000 UCSD San Diego,
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
Forced two-phase helium cooling scheme for Mu2e Transport Solenoid Greg TatkowskiSergey ChebanNandhini Dhanaraj Daniel EvbotaMauricio LopesThomas Nicol.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Beam line Experiment area SC magnet Pion production target
Heat Transfer Simulation for the Welding of the T-Section.
22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
1 LARP Collimator Engineering E. Doyle 2/3/05. 2 Review: SS Thermal Simulation 150mm OD 25mm wall Simply supported Heat: 1hr beam life, FLUKA results,
SBS Magnet and Support Status Robin Wines June 2013.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
G2P Installation Readiness. Fast raster & Calorimeter.
DOE DP This work was performed under the auspices of the U. S. Department of Energy by the Los Alamos National Laboratory under contract No. W-7405-Eng-36.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Thermal Energy Temperature & Heat 1. Temperature is related to the average kinetic energy of the particles in a substance.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Target On axis field [scale /20 T] Target Magnets Decay-Channel Triplets Taper magnets.
SPS High Energy LSS5 Thermal contact & cooling aspects
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
Book E3 Section 1.4 Air-conditioning
Completion of the MICE-US construction project
LARP Phase II Secondary Collimator RC1
Lesson 4: Generators: Let’s Get Charged!.
AEGIS Magnet System.
Diamond based Composites for Collimators Contribution to EuCard
The situation for the coated magnets and what we learned in the LS1 installation: M.Taborelli, for TE-VSC.
Federico Carra – EN-MME
2th EuCard Col/Mat WP Meeting
Beam Dump outline work plan (UK perspective)
Status of Target Design
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Recommendations of 12/16/05 review committee & SLAC response
XFEL Collimation and Beam Switchyard Vacuum Issues
DESIGN STATUS PREX II Alan Gavalya 15DEC14.
Status of FMS Refurbishment
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
Unit 4: Weathering, Erosion and Landscapes
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Advanced Collimator Ideas
Presentation transcript:

PREX II Vacuum Box, Shielding and Septum Design Status Alan Gavalya 11 APR 14

Septum Mount w/ Absorber

Vertical Section

Horizontal Section

Septum Magnet

Septum Status PREX-II utilizes the eight large coils in the existing Septum Magnet Existing Magnet has one large coil damaged Need to replace damaged coil, estimated at $10k, drawings exist, 7 to 9 months from procurement to delivery of coil.

Vacuum Box w/ Collimator

Tungsten Collimator Inner cylinder 30% Cu-70% W Water-cooled slug with Cu sleeve brazed, similar to Qweak collimator Outer box Tungsten Power deposited: Inner cylinder 25.7 W/mA 70mA results in 1800W Outer box 3.1 W/mA

Tungsten Collimator “Rough” calculation on initial design gives max temperature of Cu-W cylinder at 57.8 C With use of Dynaflux pump-cooler system at max flow of 4 GPM Recommend FEA simulation be done for more accuracy Need request of 3-4 weeks to analyze

Slow and Steady Pace Questions?