POC Procedures Working Group (POC-pWG)

Slides:



Advertisements
Similar presentations
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Advertisements

3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Accident Investigation SGRP CD Slide # Meeting 1 Northern Ontario Safety Group.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 14 January 2016.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 11 March 2016.
SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL.
Power of Choice (PoC) Program Overview
EXECUTIVE forum DATE: MON 29 MAY 2017 TIME: 1:30 PM– 2.30 PM (AEST)
Power of choice – embedded networks information session
Power of choice executive forum
B2B Working Group Meeting
PROGRAM CONSULTATIVE FORUM Meeting pack
Power of Choice – Program Consultative Forum (Poc-PCF) Meeting pack
EXECUTIVE forum DATE: 15 DECEMBER 2016 TIME: AM – PM
PROGRAM CONSULTATIVE FORUM Meeting pack
Jan 2016 Solar Lunar Data.
Implementation Review Team Meeting
COMPUTER INTEGRATED MANUFACTURING
PROGRAM CONSULTATIVE FORUM Meeting pack
Transmission Planning Attachment K Public Input Meeting
Power of choice (POC) Executive Forum
Project Name Company Name Presenter Name
PROGRAM CONSULTATIVE FORUM Meeting pack
PROGRAM CONSULTATIVE FORUM Meeting pack
POWER OF CHOICE PROGRAM CONSULTATIVE FORUM
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
EXECUTIVE FORUM 8a Meeting pack
Five-Minute Settlement Program: Information Session 1
Five-Minute Settlement Program: Executive Forum 1
Five-Minute Settlement Program: Program Consultative Forum 1
Average Monthly Temperature and Rainfall
PROGRAM CONSULTATIVE FORUM Meeting pack
PROGRAM CONSULTATIVE FORUM Meeting pack
5MS Joint Metering/Systems Focus Group
EXECUTIVE forum DATE: 27 MARCH 2017 TIME: 2.00 PM – 3.30 PM (AEDT)
BUSINESS OWNER MEETING
Amendment Invoice Task Force Progress Report
Self-Insurance Application Schedule – Key Dates*
ESB Networks Market Release Meeting of the IGG, March 5th 2009
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Step 3 Step 2 Step 1 Put your text here Put your text here
Exit Capacity Substitution and Revision
Power of Choice (PoC) Program Overview
Electricity Cost and Use – FY 2016 and FY 2017
Work plan and next steps – RDE-LDV working group
Transmission Planning Code Review
DSC ChMC CSS Consequential Update 13th March 2019
Safety Group Program Timeline
SC SC SC WS SC S HIS Background document Seminar document
Amendment Invoice Task Force Progress Report
Gas Customer Forum DN Interruption Update - Introduction
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Code change proposals completed – Sep 16
Safety Group Program Timeline
Native American Webquest
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Proposed core price & service spec L1 product milestone 31 Dec 2019
Presentation transcript:

POC Procedures Working Group (POC-pWG) 11 March 2016

Agenda slide Background Pre-Consultation Paper Procedure Updates Work Packages 1, 2 and 3 Consultation Process Overview Program Overview – Work Package 2 AEMC update on MRP rule change

1. background AEMO has facilitated three POC-PWG workshops since February 2016 The workshops have discussed specific topics relating to matters from the following AEMC rule determinations: Competition in metering and related services Embedded networks Meter replacement process The aim of the workshops has not been to litigate the rules, but rather to focus on topics where AEMO has needed further input and information from stakeholders to update the Procedures

1. background Attendance at the workshops has been excellent, comprised mainly of technical SMEs from a broad range of industry stakeholders AEMO has circulated meeting notes from each workshop that capture industry stakeholder views to topics that were discussed at the workshops, including specific questions posed to workshop attendees. Workshop #1 (3-4 Feb) Identification of type 4 metering Validation and substitution for type 4 Sample metering Network device management requirements Emergency priority requirements Meter churn Workshop #2 (15-16 Feb) MSATS requirements Change Request Codes Objection code review B2B requirements RoLR requirements Network Tariff Code Updates Workshop #3 (2 Mar) Minimum Services Specification Embedded Networks Metrology Requirements – Revisited Metrology Part A – Jurisdictional Matters

1. background Another workshop is planned on 17 March to discuss draft B2B Procedure changes A large quantity of information has been collected by AEMO at these workshops - AEMO is currently assessing this information as part of its update to the Procedures At this stage there are no further topics where AEMO needs further input and information from industry stakeholders to update the Procedures The next POC-PWG meeting is scheduled for 14-15 April (as per the placeholder in the 2016 Industry Meeting Schedule)

2. PRE-CONSULTATION Paper At the workshop on 2 March, AEMO indicated that would develop a Pre-Consultation Paper outlining its position on each of the topics discussed at the workshops (excluding B2B Procedures) The positions conveyed in this paper will be the same position that AEMO will take to formal consultation commencing on 22 April The paper will be released by 8 April, along with the new glossary and at least one sample procedure

3. Procedure updates The changes to the NER require that AEMO and the IEC create or amend existing procedures There are approximately 45 documents that need to created or amended, spread over three Work Packages Work Package 1 – to be published by 1 September 2016 Metrology Procedures, Service Level Procedures, MSATS Procedures, B2B Procedures and Formatting Procedures Work Package 2 – to be published by 1 March 2017 Accreditation and Deregistration Procedures, guidelines, etc. Work Package 3 – to be published by 1 December 2017

Work package 1 Ref Document New or Existing 1 Meter Churn Procedure 2 Network Device Procedure New 3 Service Level Procedures for MDP 4 Service Level Procedures for MP 5 Metrology Procedure: Part A 6 Metrology Procedure: Part B 7 Minimum Services Specification 8 Meter Data File Format 9 Emergency Priority Procedures 10 Glossary and Framework 11 MSATS Procedures: MDM Procedures 12 MSATS Procedures: CATS Procedure Principles and Obligations 13 MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample (WIGS) NMIs 14 NEM RoLR Process Part A - MSATS Procedure: RoLR Procedures 15 B2B Procedure Customer and site Details Notification Process 16 B2B Procedure Service Order Process 17 B2B Procedure Technical Delivery Specification 18 B2B Procedure Technical Guidelines 19 B2B Procedure Meter Data Process 20 B2B Procedure One Way Notification Process

Work package 2 Ref Document New or Existing 21 MSATS Introduction Guide 22 MSATS User Interface Guide 23 Operating Procedures MSATS CATS History Model 24 Operating Procedures MSATS NMI Discovery Questions and Answers 25 Operating Procedures MSATS-CATS Hints and Tips 26 Metering Service Provider Accreditation Checklist 27 Metering Service Provider Accreditation Procedure 28 Metering Service Provider Application Form (Part 2) 29 Metering Service Registration Procedure (Part 1) 30 Service Provider Compliance & Assessment and Deregistration Procedure 31 MC Application Form New 32 Service Level Procedure for ENM 33 ENM Accreditation Checklist 34 ENM Accreditation/deregistration procedure 35 ENM Application Form (Part 2) 36 ENM Registration Procedure (Part 1) 37 Metering Coordinator Registration Procedure (new) 38 Metering coordinator default procedure (standalone?)

Work package 3 Ref Document New or Existing 39 List of accredited ENMs in the NEM New 40 Exemption Procedure - Type 4A 41 List of National Electricity Market Procedures, Guidelines, and Documents required by Chapter 7 42 Exemption Procedure - malfunctioning metering installations 43 National Metering Identifier Procedure 44 National Metering Identifier Allocation List 45 Role of the Responsible Person (MC) - explanatory info

Consultation process overview

Consultation dates Deliverable / Milestone Project Description Planned date AEMC publish final rule determination MRP 10 Mar 16 AEMO pre-consultation workshops conclude MC,EN,MRP 17 Mar 16 AEMO releases Pre-Consultation Paper 08 Apr 16 AEMO publishes notice of first stage consultation (B2B) B2B: MC,EN,MRP Industry Workshop Placeholder TBC 14/15 Apr 16 AEMO publishes notice of first stage consultation 22 Apr 16 16/17 May 16 AEMO concludes first stage consultation (B2B) 17 May 16 AEMO concludes first stage consultation 31 May 16 AEMO publish draft procedure determination (B2B) 16 Jun16 20/21 Jun 16 AEMO publish draft procedure determination 30 Jun 16 AEMO concludes second stage consultation (B2B) 1 Jul 16 7/8 Jul 16 AEMO concludes second stage consultation 15 Jul 16 AEMO seeks IEC recommendation for B2B changes (B2B) MC,EN.MRP No later than 1 Aug 2016 25 Jul 16 AEMO publishes final procedure determination B2B) MC,EN,MRP 12 Aug 16 No later than 1 September 26 Aug 16

Program overview – WP 2 Work package 2 pre-consultation to begin during the first consultation.

Consultation two dates* Deliverable / Milestone Project Description Planned date Industry Workshop Placeholder TBC 16/17 May 16 20/21 Jun 16 07/08 Jul 16 20/21 July 16 22/23 Aug 16 08/09 Sep 16 AEMO publishes notice of first stage consultation MC,EN 10 Oct 16 24/25 Oct 16 14/15 Nov 16 AEMO concludes first stage consultation 15 Nov 16 28/19 Nov 16 13/14 Dec 16 AEMO publish draft procedure determination 14 Dec 16 AEMO concludes second stage consultation 03 Jan 17 AEMO publishes final procedure determination No later than 1 March 2017 15 Feb 17 Tentative dates for consultation two. PoC workshop placeholder dates could be utilised for other work streams or projects - SMP | IEC as required.

close Questions? Contact: poc@aemo.com.au