Water Balance Alternative Final Covers

Slides:



Advertisements
Similar presentations
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Advertisements

EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
State Water Resources Control Board and Regional Water Quality Control Boards Regulatory Authority Review and Concepts for a Statewide Order for Composting.
Construction Unresolved Issue: #1 Legal Authority Controversial issue: Definition of rainy season A.) October 1 – April 30, may be extended by written.
Preliminary Design of Water Balance Covers: A Method from the ACAP Data Set William H. Albright, PhD Desert Research Institute Reno, Nevada USA
TCEQ Air Permits Division Justin Cherry, P.E. Ahmed Omar Stephen F. Austin State University February 28, 2013.
Alternative Daily Cover (ADC) Demonstration Project Guidance Stakeholder Workshop Waste Compliance and Mitigation Program Monthly Public Meeting August.
The Role of Health Physicists in Uranium Site Cleanups Alisha Stallard, Environmental Health Physicist Radioactive Materials Division Texas Commission.
School of Civil and Environmental Engineering Life Impact The University of Adelaide Water Balance and the Influence of Soil Structural Changes on Final.
Larry Champagne, TCEQ Margaret Roy, Centerline Env. Consulting
Title V Site Operating Permits (SOPs)
Summary The CLASS U3M 1D (Unsaturated Moisture Movement Model) was used to simulate water content of 4 soil levels at Diamante, Entre Rios. Hydraulic parameters.
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
6 th Edition CCCWP Management Committee February 15, 2012.
Desert Sky Wind Farm January 2004 Welcome Desert Sky Wind Farm Pecos County, Texas.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Field water balance of final landfill covers: The USEPA’s Alternative Cover Assessment Program (ACAP) William H. Albright Desert Research Institute, University.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Streamflow Predictability Tom Hopson. Conduct Idealized Predictability Experiments Document relative importance of uncertainties in basin initial conditions.
“Soil Wetness Modeling Rules for Sewage Treatment and Disposal Systems in North Carolina” by Barrett L. Kays, Ph.D., NCCHS Steven Berkowitz, P.E., NCDENR.
David Dippel, P.G. Frank Zeng, P.E. Waste Permits Division Municipal Solid Waste Permits Section 2015 TCEQ Environmental Trade Fair.
TCEQ Environmental Trade Fair
Water Cycle/Weather Review January 24. Climate and weather are different concepts, though they are related. How are the concepts of weather and climate.
Industrial & Hazardous Waste Permits Section Overview
Lynne Welsh Massachusetts Department of Environmental Protection.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
General Operating Permits
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Modeling, Impacts, and Effects Review Dom Ruggeri, P.E., Manager Technical Program Support Section TCEQ, Air Permits Division Austin, Texas September.
Status Report On Staff Review Of Board Regulations For Alternative Daily Cover, Food And Green Waste Composting, Farm And Ranch Composting, Compostable.
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
Item 21 May 11-12, 2004 CIWMB Meeting Discussion And Request For Rulemaking Direction To Formally Notice Proposed Regulations For RCRA Subtitle D Program.
Stephen F. Austin State University February 27, 2014 Justin Cherry, P.E. Reece Parker TCEQ Air Permits Division.
MICHAEL E. SCOTT, DEPUTY DIRECTOR DIVISION OF WASTE MANAGEMENT Available Information on the Beneficial Reuse of Coal Combustion Products 1.
Land surface memory & hydrological cycle over the U.S. west coast states & monsoon region Yun Fan and Huug van del Dool CPC/NCEP/NOAA
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality.
Title V Site Operating Permits (SOPs) Initial, Revision, and Renewal Applications Vasant Chaphekar, P.E. & Carolyn Maus, P.E. Air Permits Division Texas.
An Introduction to the Voluntary Cleanup Program Texas Commission on Environmental Quality Environmental Trade Fair & Conference May 3, 2016 Gene Muller,
Chapter 16 Landfill Liners and Geosynthetics
Results of Screening Analyses of 224 California MSW Landfills Landfill Compliance Study presented to California Integrated Waste Management Board by GeoSyntec.
Liner Construction & Testing Guidance Overview
Framework for CSO Control Planning
Evan Kane, DWR Ken Pickle, DEMLR Jon RisGAARD, DWR
Update on PI Modeling and Nitrogen Removal at Blue Plains
Implementing HB 2793 Main Page
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Dry Cleaning Registration
Municipal Solid Waste Program Update TCEQ Environmental Trade Fair
Leigh Ing Executive Director
TCEQ Environmental Trade Fair
Reuse “the action of using something again”
CDM Registered Projects
Georgia Update Jeff Cown Land Protection Branch
EPA Public Meeting Dallas, Texas May 10, 2005
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
Low-Level Radioactive Waste Forum
Add to table of Contents:
Setting ABC in Scallop A15 Summary of updated ACL section since Feb SSC meeting August 11, 2009.
TPDES Construction General Permit Compliance
Update on TCEQ’s Role in Oil & Gas Waste Management
TCEQ Environmental Trade Fair Water Quality Division
Institutional Controls At Voluntary Cleanup Sites
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
Closure and Post-Closure
TOOLS FOR HIGH QUALITY APPLICATIONS (AKA “Streamlining”)
Low-Level Radioactive Waste Forum Spring 2019 Meeting – Alexandria, VA
Aquifer Storage and Recovery Recoverability of Injected Water
Presentation transcript:

Water Balance Alternative Final Covers May, 2017 Dwight C. Russell, P.E. Municipal Solid Waste Permits Section Waste Permits Division

Presentation Overview What is a Water Balance Cover? Regulatory Context History of Water Balance Covers in Texas Four Options in the Guideline

Water Balance Cover

Water Balance Cover Soil Moisture Storage

Advantages of Water Balance Covers Over much of the state, a WB Cover can be constructed that will minimize percolation at less expense than the prescriptive cover in TCEQ rules WB Covers provide a better medium for robust plant growth WB Covers provide a bio-filtering mechanism for landfill gas WB Covers have increased geotechnical stability

Regulatory Framework reducing infiltration. Per 30 TAC Section 330.457(d), an Alternative Final Cover must demonstrate equivalency to the Prescriptive Cover in terms of: reducing infiltration. providing equivalent wind and water erosion resistance. Authorization can be a new permit, permit amendment, or a permit modification.

Brief History of WB Cover Guidance 1st Draft Guidance Released April, 2007 Presented at TCEQ Trade Fair - May, 2007 WB Cover Conference in Austin - April, 2010 Two Industry Stakeholder Meetings - 2010 2nd Draft Guidance Issued - January, 2011 Final Guidance (RG 494) - January, 2012 Presented at TCEQ Trade Fair - May, 2012 Water Balance Cover Study - 2013 to 2016 Report Issued - August, 2016 Revised RG 494 Issued - March, 2017

TCEQ RG-494

RG 494 This guideline is a living, breathing document that is based on currently available information and data. As new information comes forth through research, this document will be revised as appropriate.

Options for Requesting Water Balance Alternative Final Covers Sites with ≤ 25 inches Average Annual Precipitation Option 1. Statewide Design Table Option 4. Modeling Using Site-Specific Data Sites with > 25 inches Average Annual Precipitation Option 2. Cover Performance Verification Option 3. Model Calibration

Landfill Distribution vs. Rainfall

Permitting Option 4 Site Specific Modeling (≤25 Inches Average Annual Precipitation) Initial Site specific soil and weather data Modeling description, input values and results WB cover design Cover construction QA/QC Authorization issued for entire landfill or portion requested

Options for Requesting Water Balance Alternative Final Covers Sites with ≤ 25 inches Average Annual Precipitation Option 1. Statewide Design Table Option 4. Modeling Using Site-Specific Data Sites with > 25 inches Average Annual Precipitation Modeling Option 2. Cover Performance Verification Option Option 3. Model Calibration Option

Permitting Option 2 Cover Performance Verification Initial Site specific soil and weather data Modeling description, input values and results WB cover design Cover construction QA/QC – Verification Test Area Authorization issued for entire landfill Final Construct Verification Test Area Monitor Test Area for 3-5 years Verify effectiveness of cover design Determine outcome based on percolation results

Permitting Option 2 Cover Performance Verification Measured Percolation Action ≤8mm/yr Design Accepted; Construction Authorized >8mm - ≤ 12mm/yr Modify Design Based on Model Recalibration; Construction Authorized > 12mm/yr Modify Design Based on Model Recalibration; Verify Design

Options for Requesting Water Balance Alternative Final Covers Sites with ≤ 25 inches Average Annual Precipitation Option 1. Statewide Design Table Option 4. Modeling using site specific data Sites with > 25 inches Average Annual Precipitation Modeling Option 2. Cover Performance Verification Option Option 3. Model Calibration Option

Permitting Option 4 - Model Calibration Initial Site-specific soil and weather data Modeling description, input values, and results WB cover design Calibration Test Plot construction QA/QC Authorization issued for Calibration Test Plot Final Calibrate Model (≤ 4mm/yr) using Calibration Test Plot Data, site-specific soil and weather data Cover construction QA/QC Calibrated design approved for entire landfill

Options for Requesting Water Balance Alternative Final Covers Sites with ≤ 25 inches Average Annual Precipitation Option 1. Statewide Design Table Option 4. Modeling Using Site Specific Data Sites with > 25 inches Average Annual Precipitation Modeling Option 2. Cover Performance Verification Option Option 3. Model Calibration Option

Permitting Option 1 Statewide Design Table Geoclimatic Design of Water Balance Covers For Municipal Solid Waste Landfills in Texas by Dr. Milind V. Khire, Ph.D., P.E.

Delineated Geoclimatic Regions for Texas with Average Year annual Precipitation Contours

Figure 1: Peak annual percolation predicted by UNSAT-H vs Figure 1: Peak annual percolation predicted by UNSAT-H vs. thickness of storage layer for in-service storage layer hydraulic conductivity of 10-6 cm/s (Figure 18 in the Khire report).

Figure 2: Peak annual percolation predicted by UNSAT-H vs Figure 2: Peak annual percolation predicted by UNSAT-H vs. thickness of storage layer for in-service storage layer hydraulic conductivity of 5 × 10-6 cm/s (Figure 19 in the Khire report).

Figure 3: Peak annual percolation predicted by UNSAT-H vs Figure 3: Peak annual percolation predicted by UNSAT-H vs. thickness of storage layer for in-service storage layer hydraulic conductivity of 10-5 cm/s (Figure 20 in the Khire report).

Minimum Storage Layer Thickness for Bare Ground (ft) Permitting Option 1 - Summary of minimum storage-layer thicknesses required to meet TCEQ criterion of 4 mm peak percolation (Table 8 in Khire report). Geoclimatic Region KAs-Built (cm/sec) KIn-Service (cm/sec) Minimum Storage Layer Thickness for Bare Ground (ft) 1-Childress 1.00E-08 1.00E-06 1 ft 0 in 5.00E-08 5.00E-06 1.00E-07 1.00E-05 4.50E-07 4.50E-05 1 ft 7 in 5.40E-05 2.70E-04 5 ft 8 in 2-Lubbock 10 ft 3-Del Rio 1 ft 3 in 1 ft 10 in 6 ft 2 in 4-Austin 1 ft 8 in 2 ft 7 in 3 ft 11 in 5-San Antonio 1 ft 11 in 2 ft 11 in 5 ft 10 in 6-Corpus Christi 2 ft 6 in 7-Dallas 3 ft 10 in 8 ft 8-Lufkin 3 ft 1 in 6 ft 0 in 9-Houston 10 ft 0 in

Minimum Storage Layer Thickness for Bare Ground (ft) Permitting Option 1 - Summary of minimum storage-layer thicknesses required to meet TCEQ criterion of 4 mm peak percolation (Table 8 in the Khire report). Geoclimatic Region KAs-Built (cm/sec) KIn-Service (cm/sec) Minimum Storage Layer Thickness for Bare Ground (ft) 4-Austin 1.00E-08 1.00E-06 1 ft 8 in 5.00E-08 5.00E-06 2 ft 7 in 1.00E-07 1.00E-05 3 ft 11 in 5-San Antonio 1 ft 11 in 2 ft 11 in 5 ft 10 in

Permitting Option 1 Statewide Design Table Initial Borrow source soils are evaluated Hydraulic conductivity and storage layer thickness is determined WB cover design Cover construction QA/QC Authorization issued for entire landfill or portion requested

Links to Publications Dr. Khire’s Report: txswana.org/images/downloads/Water_Balance/txswana_water_balance_covers_khire_uncc_final_report.pdf RG-494: https://www.tceq.texas.gov/publications/rg/rg-494.html

Questions?