2.8 Mtr Belt Mtr Rope = 7.3 Mtr Broken

Slides:



Advertisements
Similar presentations
Follow the correct practice to secure the crane hook and block
Advertisements

Inadequate PPE standards hazard
PDO Incident First Alert – Galfar
PDO Incident First Alert –NDSC Pup joint final landing place
PDO Second Alert What happened? Your learning from this incident..
Injury: Fall from height
Never intervene to correct obstacles without stopping the activity
PDO Incident First Alert - Sea & Land Drilling
2.8 Mtr Belt Mtr Rope = 7.3 Mtr Broken
Always think to use hands off technique.
PDO Incident First Alert - Galfar Engineering
PDO Incident First Alert- Dalma
Always use the right means of access for working at heights jobs
PDO Incident First Alert –Schlumberger
PDO Incident First Alert - ATE
الدروس المستفادة في مجال الصحة والسلامة والبيئة
Over Head Lines (OHL) and kicker boards #02
PDO Incident First Alert - Galfar
PDO Incident First Alert – PDO
PDO Incident First Alert – Truck Oman
Check & avoid potential Pinch points
PDO Incident First Alert – NDSC
PDO Safety Advice What happened? Your learning from this incident..
PDO Incident First Alert –Al Nahada
PDO Incident First Alert - MBPS
PDO Safety Advice What happened? Your learning from this incident….
If in doubt – stop the job
LTI: Nipped Finger under slips handle Inspect equipment prior to use
Safety Critical Devices can Save the Lives & Protect Asset
PDO Incident First Alert - Dalma Energy
PDO Incident First Alert - Petrogas
PDO Incident First Alert – Ensign
Keep a safe distance and expect the unexpected
PDO Incident First Alert - Galfar
PDO Incident First Alert - STST
PDO Incident First Alert - PDO Insourcing
PDO Incident First Alert - Shaleem
PDO Incident First Alert – Weatherford
PDO Incident First Alert – KCA Deutag
PDO safety advice Use this Alert: Discuss in Tool Box Talks and HSE Meetings  Distribute to contractors  Post on HSE Notice Boards  Include in site.
Ensure safety devices are working prior to starting work
 What Happened The crane outriggers were retracted in attempt to move the crane to another location. As the crane landed on its wheels it rolled backwards.
PDO Incident First Alert – MEDCO (Gulf Drilling)
  What Happened While trimming a piece of wood using electrical wood saw, the carpenter’s left hand came into contact with the saw blade resulting in.
PDO Incident First Alert - Galfar
PDO Incident First Alert – Weatherford
PDO Incident First Alert - Al Turki Enterprises LLC
PDO Incident First Alert - FAHUD ENERGY SOLUTIONS
PDO Incident First Alert - Bahwan Exel (4PL)
PDO Incident First Alert -Svitzer
PDO Incident First Alert - Shaleem Petroleum
Be aware of potential pinch points
Use only certified lifting equipment in good condition
  HSE LEARNING INCIDENT:
PDO Incident First Alert - Sea and Land Drilling
PDO Safety Advice Date: 23/08/2015 Injury: Fractured fingers
HSE LEARNING INCIDENT: Crew were loading pipe bundles with a Hiab in
PDO Incident First Alert - Al Sahari Oil Services SAOC
Only perform tasks under your responsibility
PDO Incident First Alert - Medco/Gulf Drilling
PDO Incident First Alert – Dalma Energy
PDO Incident First Alert - PDO
PDO Incident Road Safety Alert – (Private vehicles)
√ X HSE LEARNINGS INCIDENT: Root Causes: LEARNING:
PDO Incident Road Safety Alert
PDO Incident First Alert - MEDCO
HSE LEARNING INCIDENT: CAUSES:
Falling From Height – Broken Arm
PDO Incident First Alert - Apergy
Apply 3 point contact while ascending/ descending for proper stability
Presentation transcript:

2.8 Mtr Belt + 4.5 Mtr Rope = 7.3 Mtr Broken Safety Alert Use this Alert: Discuss in Tool Box Talks and HSE Meetings  Distribute to Contractors  Post on HSE Notice Boards  Include in Site HSE Induction Lifting Equipment While unloading 12” x 12 metre pipe from trailer using a 25-tonne crane, the auxiliary hook wire rope snapped and fell to the ground. The hook, weighing 60kg landed 1.5m from the rigger who was at the rear of the trailer. There was no 3rd party inspection on the auxiliary wire rope for the last 2 years. 2.8 Mtr Belt + 4.5 Mtr Rope = 7.3 Mtr Broken High potential incident 28.01.2017

Mr. Musleh asks the questions of can it happen to you? Safety Alert Mr. Musleh asks the questions of can it happen to you? Do you make sure the equipment being used has been tested and is fit for use? Do you make sure the equipment and attachments are secure and valid 3rd party certificates are in date? Do you ensure that the lift plan and the risk assessment are in place? Do you ensure the work area is clear before carrying out lifting operations? High potential incident 28.01.2017