Module 27105-06 Floor Systems.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Chapter 4 Sampling Distributions and Data Descriptions.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
Framing.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Introduction to building Estimating in South Australia 1.
Break Time Remaining 10:00.
Module Reading Plans and Elevations
Grimsby Secondary School
PP Test Review Sections 6-1 to 6-6
Bellwork Do the following problem on a ½ sheet of paper and turn in.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Do Now 4/17/13 Take out HW from last night. Copy HW in your planner.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
25 seconds left…...
Equal or Not. Equal or Not
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Concrete Construction Part 1
By: Walter C. Brown and Daniel P. Dorfmueller
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Columbus State Community College
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
1. Warm Up: On the back of your lab sheet, answer the following questions. Agenda 2 3) Which of the following shapes are parallelograms? Explain how you.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Residential Framing Prints Unit 14.
Skilled Trades 1201 Floor Framing
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Chapter 19 Floors.
Grimsby Secondary School TCJ3C
Floor Framing Unit 29.
Sill and Floor Construction
Wood Construction CTC-375.
Drafting 2 (Arch) Quiz Review #5
Floor Framing.
Floor System Sizes and Materials
Competency: Draw wall sections and details.
Unit 8 Floor Framing.
Information related to Chapter 7 in the textbook
Presentation transcript:

Module 27105-06 Floor Systems

Platform or western or box frame 1. What is the name of the type of construction where each floor of a structure is built as an individual unit (Page 5.2, Section 2.1.0)? Answer Platform or western or box frame

Because of lumber and labor costs (too expensive) 2. Why is balloon frame construction rarely used today (Page 5.4, Section 2.3.0)? Answer Because of lumber and labor costs (too expensive)

3. What architectural drawings have information relevant to building the floor assembly (Page 5.7-11, Section 3.1.1-3.2.0)? Answer Foundation plan, Floor plan, Section and Detail drawings, Structural drawings, and plumbing, mechanical, and electrical plans

4. What plan would most likely contain the information needed to correctly position the opening in the floor for a stairway (Page 5.7, Section 3.1.2)? Answer Floor Plan

5. Where, on a set of plans, would you look for the quality of materials and methods of construction for a floor assembly (Page 5.12, Section 3.4.0)? Answer Specifications

A single layer of 2 X 6 lumber 6. What type of lumber are floor sills are normally made from (Page 5.12, Section 4.1.0)? Answer A single layer of 2 X 6 lumber

7. What is the framing member that the letter H is pointing to (Page 5 7. What is the framing member that the letter H is pointing to (Page 5.13, Section 4.0.0 Figure 6)? H Answer Sheathing

8. What is the framing member that the letter C is pointing to (Page 5 8. What is the framing member that the letter C is pointing to (Page 5.13, Section 4.0.0 Figure 6)? C Answer Double Joist

Cross or Wood “X” bridging 9. What is the framing member that the letter G is pointing to (Page 5.13, Section 4.0.0 Figure 6)? Answer Cross or Wood “X” bridging G

10. What is the framing member that the letter N is pointing to (Page 5.13, Section 4.0.0 Figure 6)? Answer Anchor bolt

11. What is the framing member that the letter Q is pointing to (Page 5.13, Section 4.0.0 Figure 6)? Answer Solid Bridging

12. What is the framing member that the letter E is pointing to (Page 5.13, Section 4.0.0 Figure 6)? Answer Joist Hanger E

13. What is the framing member that the letter D is pointing to (Page 5.13, Section 4.0.0 Figure 6)? Answer Girder D

14. What is the framing member that the letter A is pointing to (Page 5.13, Section 4.0.0 Figure 6)? Answer Pier A

15. For a given size, what type of support has the most strength (Page 5.16, Section 4.2.4)? Answer Steel I-Beam?

16. What is the rule of thumb for constructing girder pockets (Page 5 16. What is the rule of thumb for constructing girder pockets (Page 5.18, Section 4.2.5)? Answer Be 1” wider than the beam and the beam must have 4” of bearing on the wall

17. Describe how wooden joists are normally placed in relation to their centers and their crown (Page 5.20, Section 4.3.0)? Answer Crown (curve) up and 16” from joist center to next joist center (16” O.C. - on center)

18. What does the term dead load refer to (Page 5.20, Section 4.3.0)? Answer The weight of permanent, stationary construction and equipment included in a building exerting a downward force on the building or framing member.

18. What type of floor joist has the most strength for a given length and size (Page 5.24, Section 4.3.3)? Answer Truss with a steel web

Intervals of no more than 8’. For spans from 8’to 16’ one row required 20. What is the interval distance that most building codes require that bridging be installed in rows between floor joists (Page 5.24, Section 4.4.0)? Answer Intervals of no more than 8’. For spans from 8’to 16’ one row required

21. What is underlayment (Page 5.25, Section 4.5.0)? Answer Material such as particleboard or plywood installed over the top of the subfloor to provide a smoother surface for finish floor materials.

22. What type of fastener should be selected to fasten wood cross-bridging and subfloor material (Page 5.30, Section 5.3.0)? Answer 8d nail

23. What type of fastener should be selected to fasten headers to joists (Page 5.30, Section 5.3.0)? Answer 16d nail

24. What measuring tool can be used to lay out the angles of wood “X” bridging (Page 5.37, Section 5.10.0)? Answer Framing Square

25. How far apart should the nails be spaced along the edges of sheathing (Page 5.37, Section 5.10.0)? Answer 6” apart

Refer to the illustration to answer the following questions. When you see a statement like this…

imagine this and… Sill Beam or Girder Pier Foundation

this and… Solid Bridging Joist

this! Sheathing

26. How many lineal feet of 2 X 6 sill material would be needed (Page 5.40, Section 7.1.0)? Answer Perimeter – total of the length of the 4 sides - (2 X 52’)+(2 X 32’) = 168’

27. How many lineal feet of 2 X 12s are needed for the beam (girder) (Page 5.40, Section 7.2.0)? Answer Length X 3 – (3 X 52’) = 156’

28. How many 2 X 8 joists are needed if the joists are spaced 16" OC (Page 5.40, Section 7.3.0)? Answer Use formula – (3/4L +1) where L equals building length. Because joists will only reach 16’ and the floor is 32’ wide the result must be multiplied by 2. So, 2(3/4L+1)…….. 2((3/4 X 52)+1) = 2(39 +1) = 2(40 ) = 80 joists

29. How many lineal feet of 2 X 8s are needed for the joist headers (Page 5.40, Section 7.3.0)? Answer Length of one side + length of other side (at the head or end of the joists) 2(L)… 2(52’) = 104’

30. How many lineal feet of 2 X 8s are needed for solid bridging (Page 5.41, Section 7.4.0)? Answer Joist span is 16’ or less so one row is needed for each set of joists from sill to girder. 2(L)… 2(52’) = 104’

31. How many 4' X 8' panels of subflooring are needed (Page 5 31. How many 4' X 8' panels of subflooring are needed (Page 5.41, Section 7.5.0)? Answer Surface area = L X W for a rectangle so 52’ X 32’ = 1664 sq. ft.. Divide that by the number of sq. ft. of surface in on one panel of sheathing (4’ X 8’ = 32 sq. ft.) 1664 sq. ft. / 32 sq. ft. = 52 panels needed