User Pays Funding – Potential Licence Mechanism

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
144A – Calculation of Value at Risk (VAR) Simon Trivella – 24 th May 2007 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
User Pays Funding – Potential Licence Mechanism Simon Trivella – January 21 st 2010 Governance Workstream.
UNC Modification Proposal Daily Metered Elective Action 005: User Pays Proposal Simon Trivella – 4 th November 2008 Development Work Group 0224.
UNC Modification 0213 – User Pays Governance Arrangements Simon Trivella – 19 th June 2008 Governance Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
User Emergency Contact Details Simon Trivella –28 th May 2009 Distribution Workstream.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Project Nexus Workgroup – Invoicing 11 th August 2014.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
© Energy UK April 2012 Modification 435 Workgroup Alternative approaches to NDM Compensation 19 February 2013
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Modification 0232 Presentation for Total By Gareth Evans.
Industry Dialogue on xoserve Services 14 th September 2007.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
Customer Charge On behalf of all DNs 19 November 2010.
Credit Arrangements – Independent Assessments
Consideration of issues raised by UNC Modification Proposal 0244
Datalogger / DMV Modification Proposals - Summary
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
Transmission Workgroup 4th October 2012
Simon Trivella – February 2007 Distribution Workstream
Transmission Workstream 4th July 2007
Action 0002: Meter Error Notifications
Transmission Workstream 6th January 2010
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Incentives 26 September 2018.
Simon Trivella – 22nd May 2008 Distribution Workstream
Discussion on Mod262 and next steps
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
Modification 0117 – Additional Considerations
Joint Office Presentation for Modification 0678
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – User Pays Options Review Group August th November.
UNC Modification Proposal 0201 National Grid Distribution
DN Interruption & Charging
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Datalogger / DMV Modification Proposals - Summary
Draft Mod: Update of default System Marginal Prices
Options for the Development of a Demand Side Response Mechanism
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
User Pays Principles and Governance
195AV “Future work” – system flexibility
Transmission Workstream 05 November 2009
Presentation transcript:

User Pays Funding – Potential Licence Mechanism RG0334 - Post Implementation Review of Central Systems Funding and Governance Arrangements Simon Trivella – November 22nd 2010 Same slide as usual

Background (Shipper) User Pays funding for [Development] costs User Pays Charge Invoiced to defined parties (upon implementation) Previously suggestions for alternative mechanisms “Pot” of allowed cash for DNs Include in service / transaction charges WWU suggested potential license mechanism Presentation given at Workstreams (Jan, March 2010)

(Ft) = (RBt) + (LFt) + (PDt) + (TGt) + (TPWIt) + (MPt) Special Condition E3 Distribution Network allowed pass-through items (Ft) “The purpose of this condition is to provide for the calculation of adjustments to the maximum Distribution Network Activity Revenue to reflect certain costs that can be passed through to customers of the licensee” (Ft) = (RBt) + (LFt) + (PDt) + (TGt) + (TPWIt) + (MPt)

Special Condition E3 RBt = business rates adjustment LFt = licence fee adjustment PDt = NTS pensions deficit charge adjustment TGt = ToG reasonable endevours payments (SC7) TPWIt = FTSG SoP payments for 3rd party damage and water ingress MPt = Miscellaneous pass-through (as directed)

Potential Licence Modification to E3 Include new term UPt Cost included in allowed revenue in the following Formula Year Charged through Transportation Charges No requirement for additional invoices (40+) Greater flexibility for Shipper pass-through Remains transparent Still requires ROM / DCA etc.

Potential Licence Modification to E3 Include new term UPt Ofgem direction on Modification Proposal also used to determine qualification for inclusion in UPt In simplest form would only work for all Shipper changes How material is this ? Potential for cost targeting by SSP/LSP or AQ band Additional complexity that may not be justified ? Allows for simple “impact” measure of percentage change

Potential Licence Modification to E3 Example User Pays change with £2m Development / Implementation costs Cross industry benefit and therefore UPt applied Approximate Transportation Charge increase of 0.067% Approximate consumer cost of 8p per annum

Potential Licence Modification to E3 Alternative option Utilise the existing MPt (miscellaneous) element Requires a direction from the Authority Designed for one-of events

Similar NTS License Mechanism SC C8G (NTS SO internal incentives, costs and revenue) Covers Agency costs that are not User Pays or not funded IT Systems and development costs; Provision of services as a result of industry framework changes; Entry capacity baseline swapping; 0.52p/kWh limit on incremental capacity buy-back; Energy balancing changes; European driven changes (limited); 20% of costs attributable to major changes to the RbD process; Shipper driven UNC Modification Proposals (100% gemini, 11% of other) Total amount of logged up costs not to exceed £10.5m (04/05) prices

Next steps? Feedback from Review Group 0334 members Alternative / amended approach ? Review Group recommendation ? Ofgem consideration ?

User Pays Funding – Potential Licence Mechanism RG0334 - Post Implementation Review of Central Systems Funding and Governance Arrangements Simon Trivella – November 22nd 2010 Same slide as usual